Explainer
When transformer secondary conductors count as taps
Short answer
Connecting both MCC feeders inside the transformer's secondary enclosure decides nothing: NEC 240.21(C) in the 2023 NEC governs each run by route, length and termination. With the transformer outside the building, each run may be unlimited in length if it ends in a single breaker or fuse set within its ampacity. Move the transformer indoors and runs past 25 ft fail, so a low-voltage switchgear main at the transformer becomes the path; size conductors from calculated load, never the 2,800 A of MCC bus ratings.
On this page
Connecting the two MCC feeders inside the transformer's secondary enclosure settles nothing about taps. NFPA 70, the National Electrical Code, 2023 edition, treats these runs as transformer secondary conductors under 240.21(C), and that section decides by route, length and termination — not by where the connections sit. For the stated bank, a 2,000 kVA, 4,160 V delta to 480 V wye transformer standing outside the building, the answer is favorable: each run may be unlimited in length under the outside-building provision, provided it leaves the secondary terminals in a raceway, its ampacity covers its calculated load and its terminating main, and it ends in a single breaker or fuse set. The 25 ft limit bites only if the transformer moves indoors. And the 1,600 A and 1,200 A bus ratings never size a conductor — the transformer's rated secondary current is the ceiling on real load.
The word tap is not what the code decides #
NEC 240.21 puts location rules on overcurrent protection, and its transformer parts work in two registers. A feeder tap under 240.21(B) is a conductor deliberately smaller than the overcurrent device ahead of it, legal only inside the tap lengths that section allows. A transformer secondary conductor under 240.21(C) is a different case: no device ahead of it exists at its own voltage, so the section supplies complete provisions — length, ampacity and termination — each of which protects the run on its own terms.
So the label changes nothing. Calling the runs taps does not put feeder-tap lengths on them, and calling them feeders does not free them from 240.21(C). What decides is which provision each run satisfies, and the route sets that: where the transformer stands, where each run crosses the building wall, and what ends the run. Editions and local amendments differ, so confirm the adopted NEC edition and the provision text with the authority having jurisdiction and the transformer documentation before the one-line is approved.
What 240.21(C) offers, provision by provision #
The primary-protection path, 240.21(C)(1) applied through 240.4(F), lets the primary device do the protecting — but only for winding pairs where the secondary current is fixed by the primary current, the classic case being a two-wire secondary. A delta primary feeding a grounded wye secondary is not such a pair: single-phase and unbalanced load on the secondary can overload one set of conductors without the primary device seeing it. For this bank, every provision that matters lives on the secondary side. The other three routes are the two short-run rules and the outside-building provision.
| Provision under 240.21(C) | Length limit | Ampacity must cover | The run must end |
|---|---|---|---|
| Protected by the primary device, 240.21(C)(1) via 240.4(F) | none stated | the secondary current the winding pair fixes | on its load, protected only from the primary — closed to a delta-wye secondary |
| 10-foot rule | 3 m (10 ft) | the combined calculated loads and the rating of the device supplied | at the equipment it supplies |
| 25-foot rule | 7.5 m (25 ft) | one-third of the primary protective device's rating | in a single breaker or fuse set within the conductor ampacity |
| Transformer outside a building | none — unlimited | the calculated load and the terminating device's rating | in a single breaker or fuse set within the conductor ampacity |
The ceiling: rated secondary current, not bus ratings #
Bus ratings describe the busbar, not the load. The two line-ups total 2,800 A of bus — 1,600 A plus 1,200 A — and none of it sizes a conductor, a main or the transformer's duty. Terminating mains may sum higher still; device ratings are not load. The demand load across both line-ups is what must sit within the transformer's rated secondary current, and that number comes from the standard three-phase relation between the kVA rating and the line-to-line voltage:
I_secondary = S ÷ (√3 × V) = 2,000,000 VA ÷ (1.732 × 480 V) = 2,000,000 VA ÷ 831.4 V ≈ 2,406 A
I_primary = 2,000,000 VA ÷ (1.732 × 4,160 V) = 2,000,000 VA ÷ 7,205 V ≈ 278 A
Both are nameplate-rating estimates — the current each winding set carries at full kVA — so check them against the nameplate and the load calculations before sizing anything. On the primary side, Table 450.3(A) of the 2023 NEC caps the protective device at 125 percent of rated primary current for a transformer of this size, with the next higher standard rating permitted: 278 A × 1.25 = 347.5 A, so a 350 A device is the example next size up. That device also has to ride through energization without nuisance tripping, which is its own arithmetic — estimating transformer inrush current for protection coordination walks that check. Its rating has no role in sizing the secondary conductors; nothing on the primary protects them.
Applying the outside-building provision to the two runs #
The provision that applies follows the route, so trace each proposed run before choosing one; sorting a run by its load, route and topology before any sizing is the standard first pass for a feeder this large, the same sort laid out in selecting electrical feeders by load, route, and topology. With the transformer outside the building, each run qualifies as a set of outside secondary conductors and the length cap disappears, on four conditions:
- the transformer stands outside the building, and the run leaves the secondary terminals in a raceway;
- the run's ampacity, after correction and adjustment factors, covers its calculated load and is not smaller than the rating of the device that ends it;
- the run terminates in a single circuit breaker or a single set of fuses — here, the MCC main — that limits the load to the run's ampacity;
- the combined real load of both runs stays within the transformer's rated secondary current.
Meet those four on each run and the runs can cross the whole plant — the length worry that started this layout does not bind it, because the outside-building provision carries no cap. Keep the runs separate, each in its own conduit with its own main; that separation is what lets each run satisfy the provision on its own, and tying them together at both ends would create parallel conductors under a different rule set (parallel sets, where used within a run, take conductors 1/0 AWG and larger with matching length, size and terminations). Each MCC main also has to interrupt the fault current the secondary can deliver; the quick upper-bound check divides the rated secondary current by the transformer impedance, and calculating transformer interrupting current from impedance shows that arithmetic. Settle each main's position as the incoming run's disconnecting means with the authority having jurisdiction before conduits are set.
If the transformer ends up indoors #
The planned site may move the transformer inside. Then the unlimited-length provision is gone and each run must fit a short-run shape. The 10-foot rule ends at the equipment it supplies, which in practice means a main device at or beside the transformer. The 25-foot rule can carry a run to a lineup main inside its cap, and its ampacity floor — one-third of the primary protective device's rating, about 117 A with the example 350 A device — is cleared by any run sized for real load. But two runs from a plant-interior transformer out to separate MCC rooms will not fit either shape.
That is where the layout you sketched becomes the compliant answer rather than a convenience: terminate the secondary in a low-voltage switchgear main within that distance of the secondary terminals — the transformer-to-switchgear run is itself a 25-foot provision run — and feed both MCCs from the switchgear as ordinary protected feeders, each sized to its calculated load and protected at the lineup. There is no length-free indoor fallback to lean on: the primary-protection path of 240.21(C)(1) is closed to a delta-wye secondary, so the terminating device has to come to the transformer. If the two hardware classes blur at specification time, switchgear vs MCC: what each term actually means keeps them straight.
Before anyone opens the secondary compartment #
Opening the compartment and landing the two runs means working where a 2,000 kVA source feeds the terminals directly: de-energize the primary, lock out and tag, then verify the absence of voltage at the secondary terminals with a proven meter before any conductor is landed. NFPA 70E, 2024 edition, governs the work practices and the protective equipment if any step must approach exposed conductors; treat energized work as the exception, never the plan. Before re-energizing, check phase rotation and secondary voltage at each MCC against the design, and walk the final route and provision choice past the authority having jurisdiction if it changed from what was reviewed.
Questions asked
Does the primary breaker protect the secondary conductors of this delta-wye bank?
No. The primary-protection path in 240.21(C)(1) fits winding pairs such as a two-wire secondary, where every secondary amp is fixed by the primary current. A delta primary feeding a grounded wye can serve unbalanced or single-phase load the primary device never sees, so the conductors must be protected at their own end, by the breaker or fuse set they terminate in.
Do the 1,600 A and 1,200 A MCC bus ratings size the feeders?
No. A bus rating is the current the bus structure is built to carry, not the demand of the loads on it. Conductor size comes from the calculated load each run serves and the rating of the main that ends it, and the combined demand still has to sit within the transformer's rated secondary current, about 2,406 A. Bus ratings also say nothing about short-circuit strength — that comes from the fault duty check, not the ampacity number.
What does the one-third floor of the 25-foot rule do to conductor size here?
Very little. The ampacity floor is one-third of the primary protective device rating, about 117 A with the example 350 A primary fuse. Any run sized for a 1,000 A-class MCC load clears that by a wide margin, so the calculated load and the terminating main's rating decide the size; the one-third figure is a floor, not a target.
What fault duty should the MCC main breakers be checked against at 480 V?
Divide the rated secondary current by the per-unit impedance. With 2,406 A of rated secondary current and an example nameplate impedance of 5.75 percent, 2,406 A divided by 0.0575 gives about 41,800 A available from an infinite primary — an upper bound. Real available fault current is lower once source and conductor impedance are included. Check the nameplate impedance and verify each main's interrupting rating against the calculated duty.