Short answer

A 400 kV system normally operates within roughly +/-5%, so the bus reaches 420 kV at light load. The 420 kV HV rating matches that top of band, and the extra 5% of turns ratio lets the generator export reactive power while staying inside its own +/-5% terminal voltage range.

On this page
  1. Um is the highest voltage for equipment, not a nominal voltage
  2. The top of the band is routine, not a fault
  3. The 5% ratio offset buys generator MVAr
  4. Worked example: checking the corners
  5. What to read before you challenge or accept the ratio
  6. The decision
  7. Questions asked

When a nameplate says 420 kV on the HV winding of a step-up transformer connected to a 400 kV bus, that is a correct specification, not an error. Two things make it right. First, the system does not sit at nominal: it operates within a band of roughly +/-5%, so the bus routinely reaches the top of band, most often at night and at weekends when load is low. Second, the extra 5% of turns ratio gives the generator room to export reactive power without leaving its own +/-5% terminal voltage range. This article shows both effects with numbers, names the standard behind the rating, and gives you the calculation to confirm the ratio for a specific unit.

Um is the highest voltage for equipment, not a nominal voltage #

In IEC 60076, the rating written on a winding is the highest voltage for equipment, Um: the highest rms phase-to-phase voltage the winding is designed to withstand continuously, and the reference value for its insulation levels. It is deliberately above the nominal system voltage, because the system band sits above nominal at light load.

For this system voltage the standard choice is Um = 420 kV, which is the nominal voltage times 1.05. The same rating appears on the circuit breakers, disconnectors and system transformers in the same substations. A GSU with this HV rating is therefore consistent with every other device in the bay; a winding rated at nominal would be the odd one out.

The top of the band is routine, not a fault #

Grid operating bands vary by country and by connection point, so the number for your station comes from the grid code or the connection agreement, not from this article. But +/-5% around nominal is common practice, and it means:

Top of band divided by nominal = 1.05.

A winding rated at Um runs at 100% of rated voltage at the top of the band. A winding rated at nominal would run at 1.05 times rated voltage, meaning 105% of rated voltage. Core flux follows the voltage-to-frequency ratio, so that is 105% flux, with the saturation, extra core heating and harmonic exciting current that come with it. That condition belongs at the top of the band, not in the middle of it, which is why nobody rates the winding at nominal.

The 5% ratio offset buys generator MVAr #

The second reason only shows up on GSUs. When the generator exports reactive power, that reactive current flows through the transformer's leakage reactance and raises the voltage the generator must hold at its terminals. Approximating the transformer as pure reactance X (resistance neglected, quantities on a common base):

V_generator ≈ V_bus_referred + (Q · X) / V_bus_referred

The generator is only allowed +/-5% around its rated terminal voltage, so every percent of drop through the transformer is a percent of MVAr capability lost. The Um-based ratio shifts the starting point down by 5% and gives that range back.

Compare the two ratios with the drop set aside for the moment, on a base of the generator rated voltage Vg:

HV bus voltage Terminal voltage, Um-rated winding Terminal voltage, nominal-rated winding
400 kV 400/420 = 0.952 Vg 1.000 Vg
420 kV 1.000 Vg 1.050 Vg, already at the limit

With the Um-rated winding, a bus at the top of band puts the generator at 1.00 Vg with a full 5% of range above it to cover the transformer drop under MVAr export. With a nominal-rated winding, the same bus already pushes the generator to its +5% ceiling with zero MVAr exported: it has nowhere to go. That is the whole argument for the higher rating on a GSU, and it is the same reasoning behind the question of whether a GSU tap change for low grid voltage adds MVAr.

Worked example: checking the corners #

Confirm the ratio for a specific unit by computing the generator terminal voltage at the two worst corners of operation. Worked example with illustrative inputs:

  • HV winding rated 420 kV, LV winding rated 20 kV (the generator rated voltage Vg)
  • Transformer impedance 14% on its own base, treated as pure reactance
  • Grid band at the connection point: 380 kV to 1.00 of the HV rating
  • Generator terminal voltage range: +/-5%, so 19.0 to 21.0 kV
  • Corner 1: bus at 400 kV, generator exporting Q = 0.45 of transformer rated MVA

Step 1. Refer the bus voltage to the generator side with the nameplate ratio:

V_referred = 400 kV × (20/420) = 19.05 kV

Step 2. Compute the reactive drop. With voltage and Q on bases of the rated values, X = 0.14 and Q = 0.45, both in fractions of rated:

drop ≈ Q · X / V_referred = 0.45 × 0.14 / 0.952 = 0.066, which is 6.6% of 20 kV, or 1.32 kV.

Step 3. Generator terminal voltage at the corner:

V_terminal = 19.05 + 1.32 = 20.37 kV

That is 20.37/20 = 1.019, inside the 21.0 kV ceiling, so the generator exports 0.45 rated MVAr legally.

Step 4. Repeat with a hypothetical winding rated at nominal system voltage at the same bus and Q:

V_referred = 400 × (20/400) = 20.0 kV; drop ≈ 0.45 × 0.14 / 1.00 = 0.063, which is 1.26 kV; V_terminal = 20.0 + 1.26 = 21.26 kV.

That exceeds the 21.0 kV limit, so the generator must cut Q to roughly 0.36 rated before the terminal voltage is legal. The Um rating is worth about 9% of rated MVA in reactive capability at this corner, before any bus voltage above nominal is even considered. These are estimates: the arithmetic neglects resistance, load current and the exact capability curve, so check the result against the generator OEM's curve and the transformer datasheet.

Corner 2 is the mirror image: maximum bus voltage (the top of band) with maximum MVAr absorption, which pushes the terminal voltage down. With the Um-rated winding the generator starts at 1.00 Vg there and has 5% of range below it for the under-excited drop; check it against the under-excited limit of the capability curve, which often binds before the voltage does.

What to read before you challenge or accept the ratio #

Take the data from the documents, in this order:

  1. Nameplate and datasheet: HV and LV rated voltages, Um, tap range and current tap position, impedance in percent on its own base, and the manufacturer's over-excitation (V/Hz) capability curve.
  2. The grid code or connection agreement for the operating band at your point of connection. Use its numbers in the corner calculation, not the +/-5% habit.
  3. The generator capability curve and its terminal voltage range.
  4. Run both corners as in the worked example. Every bay device (breakers, disconnectors) must carry the same Um; the lowest-rated device in the bay sets the real limit.
  5. Set or verify the V/Hz protection against the manufacturer's over-excitation curve, not a generic default, because that curve is what allows short excursions above the band.

The decision #

  • GSU on this system voltage, with a band that reaches 5% above nominal: the HV winding carries the standard Um, 5% above nominal. Specify it that way, and rate the bay switchgear to match.
  • A nameplate reading Um while SCADA shows 415 kV upward at night: normal. The winding is at or below 100% of rated voltage by design.
  • A proposal to re-rate the winding at nominal system voltage to match nominal: reject it. It puts the core at 105% flux at the top of the band and caps MVAr export, as the worked example shows.
  • A unit that cannot reach its reactive capability with the bus in band: compute the corners before touching taps or AVR limits; a large mismatch between calculated and logged drop points to the wrong tap position, wrong CT/VT scaling or a wrong nameplate impedance.
  • Any sustained bus voltage above the winding's rated voltage: that is outside the rated condition, and only the manufacturer's V/Hz curve decides how long it may run there. Raise it with the grid operator; do not solve it by changing taps.

Terminal voltage limits and MVAr headroom are two sides of the same capability curve, covered in more depth in this discussion of generator MVAr capability and grid reactive power limits.

Questions asked

Is the 420 kV rating unique to generator step-up transformers?

No. Circuit breakers, disconnectors and system transformers on the same system carry the same rating. It is the standard highest voltage for equipment for that system voltage, so a GSU rated that way is consistent with the rest of the bay, not over-specified.

What is the highest voltage for equipment in IEC terms?

IEC 60076 calls it Um: the highest rms phase-to-phase voltage the winding is designed to withstand continuously in service, and the reference for its insulation levels. For this system voltage the chosen Um is 5% above nominal, which is why it appears on the nameplate rather than the nominal system voltage.

Where do the tap changer and the rated voltage interact?

On-load taps adjust the effective ratio around the nameplate value, usually on the HV winding, so they trim where the generator sits in its terminal range at a given bus voltage. They do not replace the 5% ratio offset: with the bus at the top of band and a winding rated at nominal, no tap range is needed to see the problem, and the ratio itself is wrong.

Which documents do I need before challenging or confirming the ratio?

The transformer nameplate and datasheet (rated voltages, Um, tap range, impedance), the grid code or connection agreement for the operating band at the point of connection, the generator capability curve with its terminal voltage range, and the transformer manufacturer's over-excitation (V/Hz) capability curve. The corner calculation in this article uses exactly those inputs.

Keep reading

  • How-to

    Calculating voltage drop through step-up and step-down transformers

    Yes. A primary voltage drop passes through the turns ratio almost one-for-one in percent — 5% low at 12 kV is 5% low at 480 V — so the study must run every segment from the generator terminals to the farthest branch outlet, combining drops as percentages.

    Power distribution and transformers

  • Explainer

    Why series transformers don't add kVA or fix motor starting voltage

    Transformers in series do not add kVA: the pair delivers the smaller rating, 500 kVA, and each unit drops voltage by its per-unit impedance times its per-unit current. The customer's 5% step-up carrying 3 to 4 per-unit starting current eats an estimated 15-20% before the motor, so the utility transformer is probably the right size and the fix belongs to the starting method or a direct 2400 V service.

    Power distribution and transformers

  • Selection guide

    Is a 6 kVA transformer enough for a 5 hp motor drive

    A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V and 15.1 A at 230 V. A 5 hp rating is 3.73 kW of shaft output, not input kVA. Measure the machine's simultaneous input current at its heaviest cut: if it stays under the transformer's nameplate current, the 6 kVA unit is enough; if it crosses, order the next standard size.

    Power distribution and transformers