Transformers in series do not add kVA: the pair delivers the smaller rating, 500 kVA, and each unit drops voltage by its per-unit impedance times its per-unit current. The customer's 5% step-up carrying 3 to 4 per-unit starting current eats an estimated 15-20% before the motor, so the utility transformer is probably the right size and the fix belongs to the starting method or a direct 2400 V service.

On this page
  1. Two units in series deliver one unit's kVA
  2. The impedances add, and that is what squeezes the start
  3. Worked example: the drop across the step-up
  4. What the utility has to hold at the service bus
  5. Measure the start before assigning blame
  6. The decision for each case
  7. Questions asked

Two transformers in series do not add their kVA. The pair delivers the smaller nameplate rating — 500 kVA in your arrangement — less losses, because a step-up transformer only trades voltage for current. What the pair does add is impedance: each unit drops voltage roughly in proportion to its per-unit impedance times the current it carries on its own base, so a 5% unit carrying 3 to 4 per-unit starting current removes an estimated 15-20% of the voltage before the motor terminals. That makes the customer-side step-up, not the utility's transformer sizing, the first suspect in a marginal 450 hp start. One logged start — voltage at the 480 V bus against voltage at the motor terminals — decides which side owes the fix.

Two units in series deliver one unit's kVA #

Transformer kVA adds only where windings share a voltage: a bank adds its kVA at each rated winding voltage — the arithmetic is in this note on how a transformer bank's kVA adds at each rated winding voltage — and parallel units at a common bus add the same way. A step-down followed by a step-up does not. Through-power is capped by the smaller nameplate, and yours happen to match, so the cap is the same at both transformers.

The step-up raises voltage and cuts current in the same ratio; the apparent power leaving it is the apparent power entering it, less its own losses. It creates no capacity.

The running numbers agree. A 450 hp shaft output is 450 × 746 W = 335.7 kW; at an example nameplate efficiency of 0.94 and power factor of 0.90 (read the real values off your motor), the input is 335.7 ÷ (0.94 × 0.90) ≈ 397 kVA, about 0.79 of the transformer rating. A utility transformer running near its limit with the pump at capacity is showing this arithmetic, not an overload — the first sign nothing was undersized for the running case. For one transformer feeding one motor, the sizing walk-through is in sizing a transformer for a 200 HP across-the-line motor start; the series case is one step beyond it.

The utility sized its transformer from the load letter it was given. If that letter listed a big motor without its locked-rotor current and starting method, the utility sized for the running load it was shown, and the starting problem was designed in on the load side of the meter.

The impedances add, and that is what squeezes the start #

The motor does not see two transformers; it sees one equivalent impedance — the utility's source and transformer plus the step-up, all referred to a common base. Referring is arithmetic: multiply an impedance on its own base by the kVA-base ratio and the square of the inverse voltage ratio. With equal kVA the percentages simply add; with unequal kVA, scale by the kVA ratio — a 1000 kVA unit at the same impedance contributes half its percentage on the smaller base. The same referral, applied to a bolted fault, is what calculating transformer secondary fault current in per-unit works through. The utility's source strength enters the same sum; motor starting voltage drop with utility short-circuit capacity shows how a quoted service fault current becomes that source term.

Nameplate impedance is a measured quantity, not a guess: it comes from the standard short-circuit test — the voltage needed to circulate rated current in a shorted secondary, expressed as a percentage of rated voltage — and that percentage is exactly the per-unit impedance used below. The same test says an infinite source would drive one over that impedance — 20 times rated current — into a bolted secondary fault of the step-up alone.

The screening estimate for one transformer is:

estimated drop ≈ impedance (per-unit) × through-current (per-unit of that transformer's rated current)

The old rule of thumb — the drop is three to four times the impedance — holds only when the through-current is three to four per-unit of that transformer's rated current. Motor amps mean nothing in this formula until divided by the transformer's rated current.

The utility transformer's impedance is missing from your information; ask the utility for it, or convert the available fault current at the service into a source impedance. Until then its share of the drop is unquantified — but the step-up's share alone is large enough to explain a marginal start.

Worked example: the drop across the step-up #

Every input below is an example; measure yours.

Inputs: step-up transformer rated 500 kVA, 480/2300 V, impedance 5%. Motor: 450 hp, nameplate full-load current 105 A, locked-rotor current 6.0 times rated — a typical multiple for this class; the motor's code letter or test sheet gives the real one. Starter: reduced-voltage autotransformer on the 80% tap. Logged service-bus voltage during the start: 460 V.

  • Base current on the motor side: 500,000 VA ÷ (√3 × 2300 V) = 125.5 A.
  • Current through the transformer: locked-rotor 6.0 × 105 A = 630 A; the autotransformer tap makes the line current 0.80² × 630 A = 403 A.
  • Per-unit current: 403 A ÷ 125.5 A = 3.2.
  • Estimated drop inside the step-up: 0.05 × 3.2 = 0.16, about 16% of the secondary voltage.
  • Voltage at the starter input: the bus at 460 V ideally gives 460 × 2300/480 = 2204 V; after the drop, 2204 × 0.84 = 1851 V. The 80% tap then feeds the motor 0.80 × 1851 = 1481 V — 64% of nameplate.
  • Torque: for the same motor at the same frequency, torque scales with the square of terminal voltage, so the motor develops about 0.64² = 41% of its full-voltage starting torque. If the pump's breakaway torque sits above that, the motor stays near locked-rotor current and the sag deepens instead of clearing.

An across-the-line start is worse, not better: 630 A ÷ 125.5 A = 5.0 per-unit, so the estimate gives 5.0 × the nameplate impedance = 0.25 — 25% lost inside the transformer. And the impedance-times-current product is a screening number: a defensible figure comes from a motor-starting study using the transformer's resistance/reactance split, the starting power factor, the conductor impedances and the utility source term. Treat 16% as the planning estimate, not a measurement.

What the utility has to hold at the service bus #

ANSI C84.1-2020, the American national standard for 60 Hz power system voltage ratings, defines Range A service voltage as 95-105% of nominal — 456-504 V on a 480 V service — as a steady-state limit at the service point. It does not cover the transient of a motor start; utilities govern starts with their own motor-starting and flicker rules written into the service agreement. Confirm the applicable rule with the utility and the authority having jurisdiction.

So the test of the utility's performance is: does the service bus hold 456 V or better at full running load, before any start? If it does, the utility transformer met its documented obligation and a larger one is not owed; enlarging it would trim only its own share of the drop, while the step-up's percentage on its own base is untouched. If your log confirms a healthy bus, the utility supplied the right transformer and the start margin was lost on the load side of the meter.

Measure the start before assigning blame #

One start, logged end to end, replaces the argument. Record the unloaded bus voltage immediately before the start, then during the start: service-bus voltage, step-up primary and secondary voltage (through the plant's metering transformers where they exist), motor-terminal voltage, motor current, starter state and time to full speed. Use a power-quality analyzer with cycle-by-cycle RMS capture and current probes rated for the circuit; a clamp reading taken after the start shows the steady state, not the event.

The boundary where the voltage collapses identifies the impedance that ate the margin. Make every connection with the circuit de-energized, verify absence of voltage before touching a terminal, and work under your site's NFPA 70E (2024 edition) program — the standard covering electrical safety-related work practices — because connecting instruments on a medium-voltage motor circuit is not a live-work task.

The decision for each case #

  • Service bus holds 456 V or better through the start while motor-terminal voltage falls below the motor supplier's minimum starting voltage: the step-up and the current through it are the problem. Cut the through-current — a current-limited start held near 2 per-unit drops the transformer's take to about 10% — or retire the step-up arrangement for a direct 2400 V service, which removes that impedance and its losses entirely.
  • Service bus below 456 V at full running load before any start: the service is deficient. The log is the evidence to take to the utility, and this is the one case where a larger utility transformer is the fix.
  • Both voltages hold and the pump still stalls: the transformers are exonerated. Look at breakaway torque, pump unloading and the starter sequence.

Questions asked

Why does the pump start on some days and stall on others?

Induction motor torque scales with the square of terminal voltage, so torque moves about twice as far in percentage terms as the supply does. An incoming voltage 4% low costs about 8% of torque (0.96 squared is 0.92), exactly the margin a borderline start lacks. Log the incoming voltage with every start attempt; the failures will cluster at the low readings.

Should the step-up transformer be de-energized when the pump is idle?

Yes. Core (no-load) loss runs whenever a transformer is energized, load or no load, and a dry-type unit this size pays it around the clock; load losses appear only while pumping. Opening the primary with a breaker or contactor interlocked to the pump removes the no-load loss for the idle hours. Read the no-load loss off the transformer's test report before estimating the energy the idle hours waste.

Is the motor's voltage available directly from the utility?

In many areas, yes. ANSI C84.1 lists a 2400 V nominal system with a 2300 V utilization voltage that matches the pump motor's nameplate, so a service point on that class of circuit feeds the motor directly, with no customer step-up at all. Ask the utility whether its distribution circuit near your site operates at that voltage class; if it does, the step-up transformer, its starting drop and its losses all leave the one-line diagram.

Does the step-up transformer's tap changer fix it?

It buys margin, not a fix. Raising a tap sets a higher secondary voltage for the same primary voltage, dry-type units commonly offer two 2.5% steps either side of nominal, so read the nameplate, which restores a few percent at the motor. The impedance drop still scales with current, so during a start the raised tap only shifts the whole voltage profile upward. A pump that starts only after a tap change is confirming the narrow-margin diagnosis.

Would a drive on the pump end the starting problem?

Mostly, yes. A variable frequency drive holds current near the motor's rated value while raising voltage with frequency, so both transformers see close to running current during acceleration and the starting drop disappears. Check three things first: the drive's input current limit, the harmonic limits at the service (IEEE 519-2022 is the recommended practice for harmonic control), and the pump's minimum speed. It is a bigger change than a soft starter, but it turns the start into a non-event for the bus.

Keep reading

  • Selection guide

    Sizing a transformer for a 200 HP across-the-line motor start

    Select a 1000 kVA transformer with nameplate impedance of 6.5% or less. The 3 kVA-per-HP rule gives 600 kVA for the 200 HP pump alone; adding 390.9 kVA of always-on load gives 990.9 kVA, so that is the screening size. The dip screen confirms it: 8.8% sag at 5.75% impedance, inside the 10% target, while 750 kVA would need 4.9% impedance to pass.

    Power distribution and transformers

  • How-to

    Calculating voltage drop through step-up and step-down transformers

    Yes. A primary voltage drop passes through the turns ratio almost one-for-one in percent — 5% low at 12 kV is 5% low at 480 V — so the study must run every segment from the generator terminals to the farthest branch outlet, combining drops as percentages.

    Power distribution and transformers

  • Selection guide

    Is a 6 kVA transformer enough for a 5 hp motor drive

    A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V and 15.1 A at 230 V. A 5 hp rating is 3.73 kW of shaft output, not input kVA. Measure the machine's simultaneous input current at its heaviest cut: if it stays under the transformer's nameplate current, the 6 kVA unit is enough; if it crosses, order the next standard size.

    Power distribution and transformers