Selection guide
Is a 6 kVA transformer enough for a 5 hp motor drive
Short answer
A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V and 15.1 A at 230 V. A 5 hp rating is 3.73 kW of shaft output, not input kVA. Measure the machine's simultaneous input current at its heaviest cut: if it stays under the transformer's nameplate current, the 6 kVA unit is enough; if it crosses, order the next standard size.
On this page
- What does a 6 kVA three-phase transformer actually supply?
- What does a 5 hp motor really draw from the supply?
- How do you measure the machine's input to decide?
- What does the arithmetic look like with real numbers?
- What pushes the machine past the transformer's rating?
- Does occasional use make a marginal transformer acceptable?
- What do you check before wiring the transformer in?
- Is the 6 kVA unit the right transformer for this machine?
- Questions asked
The horsepower plate on the motor does not size the transformer feeding it. A 5 hp machine tool with its original drive, fed through a step-up transformer from a lower-voltage shop supply, is decided by one comparison: everything the transformer carries at the same time, in kVA, against the transformer's nameplate. Six kVA on a three-phase 460 V winding is 7.5 A per line, and a 5 hp shaft rating is 3.73 kW of mechanical output before drive losses, power factor and the machine's other loads have taken their share. Measure the machine's input current at the heaviest cut, or calculate it from declared assumptions, and the answer follows: inside the nameplate current with margin means the 6 kVA unit stays; across it means the next standard size.
What does a 6 kVA three-phase transformer actually supply? #
A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V on the machine side, or carries 15.1 A per line at 230 V on the supply side, and everything it feeds — the drive, its cooling and control power, any machine heaters — must fit inside those currents continuously.
Both numbers come from the standard three-phase relationship, I = kVA × 1000 ÷ (√3 × V), with V as the line-to-line voltage of the winding in question and the load shared across all three lines. For the ratings that surround this decision it works out to:
| Transformer rating | Line current at 460 V (machine side) | Line current at 230 V (supply side) |
|---|---|---|
| 6 kVA | 7.5 A | 15.1 A |
| 9 kVA | 11.3 A | 22.6 A |
| 15 kVA | 18.8 A | 37.7 A |
Take the figure for the winding the load sits on as the continuous ceiling, balanced across the three lines, and read it off the actual unit's nameplate, because winding voltages and connections vary by design. Manufacturers set a kVA rating by exactly this comparison between the current a winding can deliver and the load it must carry — the same comparison behind sizing a 120/240 V three-phase transformer's kVA rating for other supplies.
What does a 5 hp motor really draw from the supply? #
A 5 hp motor delivers 3.73 kW of mechanical power at the shaft, and the electrical input the transformer must carry is always higher once drive losses, power factor and the machine's other loads are added on top.
One horsepower is 746 W, so the plate figure is shaft output, never input kVA. The input the transformer sees is shaft power divided by the drive's efficiency, divided again by the input power factor, plus whatever else hangs on the same secondary. The drive is the wild card: an electronic drive can pull more current from the line than it delivers to the motor, and why VFD input current runs higher than output current explains the mechanics. If the motor itself is a plain three-phase unit, a common field estimate is about 1.25 A per line per horsepower — roughly 6 A for this motor — but a drive-fed machine loads the transformer with the drive's input current, and that is the quantity to measure or calculate.
How do you measure the machine's input to decide? #
Put a true-RMS clamp meter around each line at the machine's input, run the heaviest cut the machine will ever see, and compare the highest steady reading with the transformer's nameplate secondary current — that comparison, not the horsepower figure, decides the question.
Use a meter rated for the measurement category of the panel you are working at, and clamp all three lines at the machine disconnect or at the transformer's secondary terminals while the machine runs under guard. Let the machine and the readings settle, record each line, and compare the highest one; a large spread between the lines points to an unbalanced load, which heats the transformer unevenly and should be corrected before any single reading is trusted. An idle or no-load draw proves nothing — the cut is the test.
The limit you compare against has two sources: the transformer nameplate, whose kVA and winding voltages give the current through the formula above, and the drive documentation's supply requirement for that specific model. If the machine plate itself carries a kVA figure for drive sizing, that number is the load side of the comparison already summed — what a machine kVA nameplate means for VFD sizing walks through how it is built.
What does the arithmetic look like with real numbers? #
Take a 5 hp machine at full shaft load, assume a drive efficiency of 92 percent and an input power factor of 0.85, add 0.30 kVA of heaters and controls, and the machine draws 5.07 kVA — inside the rating, with about 15 percent margin.
Those inputs are example assumptions; the drive manual and the machine's wiring diagram supply the real ones. The arithmetic:
- Shaft output: 5 hp × 746 W per hp = 3730 W.
- Drive input at 92 percent efficiency: 3730 W ÷ 0.92 = 4054 W of active power.
- Apparent power at 0.85 power factor: 4054 W ÷ 0.85 = 4770 VA.
- Auxiliary heater and control load: 4770 VA + 300 VA = 5070 VA, about 5.07 kVA.
- Line current on the machine side: 5070 VA ÷ (√3 × 460 V) = 5070 ÷ 796.7 = 6.36 A, under the nameplate 7.5 A.
Under these assumptions the 6 kVA unit carries the machine with roughly 15 percent margin, and the unit stays. Bend the power factor instead: at 0.71, step 3 becomes 4054 ÷ 0.71 = 5710 VA and the total becomes 6010 VA — a shade above the nameplate rating with nothing changed at the shaft — and the decision flips to the next size up. Treat every figure here as an estimate, checked against the transformer nameplate, the drive documentation and the governing code before anything is wired.
What pushes the machine past the transformer's rating? #
Drive efficiency and input power factor move the answer more than the horsepower does: in the worked example the machine stays inside the rating at a 0.85 power factor and crosses it near 0.71, with no change at the shaft.
- Reduced-speed operation: a line-commutated drive — a DC drive, an older converter — turning the motor at reduced armature voltage draws from the line at a power factor that falls as the speed falls, so a machine that fits at full speed can overload its supply at half speed.
- Losses as heat: everything the drive and the motor waste becomes heat the supply must fund on top of the shaft load.
- Auxiliary loads on the same secondary: heaters, control power, a coolant pump, a work lamp — the 300 VA in the example is exactly this category.
- Harmonic content: a converter's input current is not sinusoidal, and the harmonics heat a transformer's windings beyond what the RMS figure alone suggests, which is one reason drive documentation often states the supply capacity itself.
- A shared secondary: a second machine or a shop tool on the same transformer adds its whole draw, and the same load-budget logic that tests whether a small servo transformer can carry three motors applies here.
- Anecdote is not capacity: a machine that has run well on light, occasional cuts has never tested the full-load budget, and only a measurement at the heaviest cut does.
Does occasional use make a marginal transformer acceptable? #
An intermittently used machine gives the transformer thermal recovery between cuts, but the rating is still a continuous number: size to the current the machine draws through its heaviest cut, not to the fraction of the day it runs.
Winding temperature follows the load over minutes, so short cuts with idle gaps genuinely let a unit cool, and manufacturers publish overload data for exactly those duty patterns. What duty cannot do is legitimize a steady input above the plate: the 5.07 kVA example load is comfortable on this transformer even under hard use, while a measured load above the nameplate current cooks the insulation through a long cut whether or not the machine runs again tomorrow. A claim that the machine has worked fine so far proves only the duty it has actually seen. Measure at the heaviest cut and size to that, however rare the cuts are.
What do you check before wiring the transformer in? #
Before energizing, confirm the nameplate lists both winding voltages for a step-up connection at your supply frequency, and fit primary and secondary overcurrent protection sized as NFPA 70, the National Electrical Code, 2023 edition, Article 450 requires.
Article 450 covers transformer overcurrent protection, and protection requirements differ by country, edition and local amendment, so confirm the sizes with the authority having jurisdiction and the transformer's documentation. De-energize the supply, lock out, and verify absence of voltage at the terminals with a tester rated for the panel before opening any connection compartment. The rest of the pre-wire list:
- Nameplate and connection: the supply-side winding rated for the measured supply voltage and frequency, the machine-side winding for the machine's voltage, and the printed connection diagram followed exactly — many general-purpose units work in either direction, but the diagram on the tank is the authority.
- Energization inrush: closing into a transformer draws a magnetizing pulse far above rated current for a few cycles, which trips breakers sized only for load current; the mitigation pattern is the one in stopping breaker trips on transformer inrush.
- Secondary conductors: sized for the load current, insulated for the machine voltage, and protected by the secondary device — the same three checks every three-phase motor cable must pass.
- Mounting and cooling: vertical mounting per the manufacturer, ventilation clearance around the tank, and no heat-trapping enclosure without the manufacturer's ambient correction data.
Is the 6 kVA unit the right transformer for this machine? #
The 6 kVA unit is the right transformer when the measured machine input at the heaviest cut stays under the nameplate secondary current and the drive manual's supply requirement is met; it is wrong the moment that input crosses the limit, and the next size becomes the answer.
- Fits with nothing else planned: measured input at or below the nameplate current, drive documentation satisfied, no second load joining the secondary — keep the unit, mount it on or beside the machine, and protect and connect it per the checks above.
- Crosses, or the manual demands more: measured or calculated input above the nameplate current, a supply requirement the unit cannot meet, or a shared secondary on the way — move to the next standard size, which on this winding is 9 kVA at 11.3 A per line.
- Nothing measured yet: calculate with the worked example's method using the drive manual's efficiency and power factor, keep about 15 percent margin, then confirm with the clamp meter at the first heavy cut.
On the example's numbers this transformer is enough for the machine; on a measured input above the plate it is not, and stepping up is a small penalty beside a cooked winding.
Questions asked
How do I convert other horsepower ratings to a transformer load?
Multiply the horsepower by 746 to get shaft watts — for example 7.5 hp is 7.5 × 746 = 5595 W, about 5.6 kW of mechanical output. Divide that by the drive's efficiency and then the input power factor to estimate input kVA, then add every other load connected to the transformer secondary at the same time.
Why does the breaker trip the moment the transformer is energized?
A transformer draws a magnetizing inrush pulse at switch-on, several times its rated current for a fraction of a second, and a breaker sized only for load current can read that pulse as a fault. Inverse-time protection or protection selected for transformer inrush, chosen under the overcurrent rules for the installation, stops the nuisance trips without giving up fault clearing.
Does the drive manual change the transformer size?
It can, and it wins when it does. Drive documentation lists supply requirements for the specific model — recommended supply capacity, maximum source impedance, sometimes conditions on feeding it from a transformer or generator. Read that supply section before finalizing the size, because those requirements override any general calculation.
Can a step-down transformer be connected in reverse to step up?
Often yes, but the nameplate decides. Many general-purpose units are suitable in either direction and some are listed for one connection only. Reverse feeding also changes the exciting current and the voltage regulation, so follow the manufacturer's connection diagram for the step-up arrangement and expect the machine-side voltage to sit slightly above the ratio at no load.
What derates a transformer in the field?
Ambient temperature above the basis of the rating, poor ventilation in an enclosure, high-altitude sites and duty beyond the rating's assumptions all reduce the continuous load a unit can carry. The nameplate states the temperature rise and the ambient the rating assumes; where mounting conditions differ, apply the manufacturer's correction data rather than the bare nameplate figure.