Current IntelPower LibraryShop main store

Explainer

Why a machine transformer tap chart shows one leg's connections

Power distribution and transformers Published 7 min read By Current Intel engineering team

Short answer

A three-phase machine transformer's tap chart prints the connection pattern once, for a single leg; the terminal block repeats it on all three. At the low-voltage setting that means two connections per leg, six in total, where the high-voltage setting used one jumper per leg. Halving the input voltage doubles line current, so recheck the feed conductors and overcurrent protection before energizing.

On this page
  1. The chart prints one phase, not the whole job
  2. Why the low-voltage row takes more connections
  3. The three errors the chart invites
  4. De-energize, record, then rewire
  5. What the voltage change does to the line current
  6. Energizing checks that catch a mismatched leg
  7. The decision, case by case
  8. Questions asked

A three-phase machine transformer's tap chart prints its connection pattern once, for one leg, and the terminal block repeats it on all three. That is the whole convention behind the chart inside the cabinet: each voltage row is the recipe for a single phase, and you build that recipe three times. At the low-voltage setting the recipe usually takes two connections per leg — six in total, where the high-voltage setting used a single jumper on each leg. Halving the input voltage also doubles the line current for the same load, so the feeders and overcurrent protection deserve a recheck before the machine runs. This article explains the convention, the errors it invites, the arithmetic behind that current change and the checks that catch a leg wired differently.

The chart prints one phase, not the whole job #

Charts mounted inside three-phase machine transformers follow one convention: because the three phases are identical, the chart states each voltage row for one leg and leaves the repetition to you. The terminal block below the chart carries three identical groups of terminals, one per phase, and each group receives the full row.

On one common machine tool transformer, the high-voltage row reads connect 1 to 5, and the low-voltage row reads connect 2 to 4 and 3 to 7. Those are per-leg instructions. The high-voltage arrangement is one jumper per leg, three bars on the block. The low-voltage arrangement is that pair of connections on each leg, six joints in total. Nothing in the chart's short rows means a leg is omitted; the rows are short because the chart assumes the block repeats each row three times.

If the chart in your transformer prints different terminal numbers, the rule holds unchanged: whatever a row lists, it lists for one leg.

Why the low-voltage row takes more connections #

The counts make sense once you see the winding behind them. A primary built for a 2:1 voltage pair — 480 V and 240 V on the same nameplate, for example — is commonly two coil halves per leg. For the higher voltage the halves sit in series, and a single jumper between them completes the leg. For half the voltage the halves sit in parallel, and two jumpers per leg complete it. The low-voltage row therefore shows more connections per leg, not fewer: more of the winding is being bridged.

That construction is also why a mixed leg is destructive. A leg that keeps part of the old pattern leaves a coil half connected for a voltage that matches neither row, and the turns ratio on that phase comes out wrong. Every leg takes one complete row — the high-voltage row or the low-voltage row — and never part of each.

The three errors the chart invites #

  • Leaving one leg on the old pattern. That phase keeps the wrong turns ratio, so its secondary voltage reads off while the other two look normal. Control power and machine power supplies see an unbalanced set, and trips, alarms or damaged electronics follow.
  • Wiring only two legs because the low-voltage row shows two connections. The row is per leg; a three-phase transformer needs its complete row on every leg, and a two-leg arrangement is never a valid setting.
  • Energizing to see what happens. A wrong tap arrangement is not forgiving: the machine may trip on a power fault or run long enough to damage components. The verification steps below find the error in minutes, with the machine control off.

If a leg will not accept the full row cleanly, or the as-found jumpers do not match the chart, stop there and leave the machine locked out until the mismatch is resolved.

De-energize, record, then rewire #

Treat the tap change as work on a live-capable panel: isolate the supply, apply your lockout, and prove absence of voltage at the primary terminals with a meter rated for the voltage before any cover comes off. NFPA 70E, the 2024 edition, covers the lockout and voltage-verification steps for electrical work; confirm the details with your employer's procedures, the authority having jurisdiction and the machine documentation.

With the transformer dead, photograph the terminal block as found and compare the three legs against each other and against the chart. Legs that already disagree mean the transformer was mis-tapped before you started; resolve that first. Then pull the old jumpers on all three legs before fitting any new ones, clean oxidized contact faces on the bars, and tighten each joint to the torque the machine documentation specifies — do not guess a torque. When the row is built, count the joints: the row's pair of connections on each of the three legs, identical leg to leg, is the result to see before the cover goes back on.

What the voltage change does to the line current #

Reconnecting the primary for half the supply voltage does not change the kVA the transformer delivers, so the line current doubles. Three-phase line current follows I = kVA × 1000 / (√3 × V_LL), with V_LL the line-to-line input voltage — the standard power relation, no drive or motor involved.

Worked example, illustrative: assume a 7.5 kVA three-phase machine transformer. At a 480 V input, I = 7500 VA / (1.732 × 480 V) = 9.0 A. Reconnect the primary for a 240 V input and the same formula gives I = 7500 VA / (1.732 × 240 V) = 18.0 A. Same transformer, same load, exactly double — and the ratio holds at any kVA, because current scales inversely with voltage.

That doubled current is the practical consequence for the feed. A disconnect, branch conductors and fusing chosen around the old 9.0 A figure are now carrying around 18 A, so recheck them against the machine nameplate, which lists the input current for each supply voltage the transformer supports. In the United States, NFPA 70, the National Electrical Code, 2023 edition, covers the branch circuit serving industrial machinery; confirm conductor and protection sizing with the authority having jurisdiction and the equipment documentation. The estimate above shows why the recheck exists; the nameplate and the governing code decide the final values.

The tap change is one piece of a full supply-voltage move — feeders, fusing and end-to-end verification all move with it — and the walkthrough in Retapping a 380 V machine transformer for a 240 V supply covers the complete job.

Energizing checks that catch a mismatched leg #

Restore the cover, clear the lockout per your procedure, and energize the transformer with the machine control still off. Measure line-to-line at the transformer's secondary terminals with a meter rated for the voltage, in the protective equipment your electrical safety program specifies for that task. Three balanced readings near the nameplate secondary voltage mean the legs agree; one reading off from the other two points at a leg wired differently — shut down, lock out again and compare that leg against the chart joint by joint.

Confirm phase rotation before anything spins, against the machine documentation, since the rewiring touched the primary terminals. Then start the control and watch for phase-loss or power-supply alarms, run the machine at load, and check the terminal bars for heat after a run period. A transformer that hums loudly, runs hot or gives unbalanced secondary voltages is mis-wired or overloaded; shut it down and go back to the chart.

The decision, case by case #

Moving a machine from the high-voltage taps to the low-voltage ones: build the chart's low-voltage row on all three legs, recheck feeders and overcurrent protection against the nameplate input current at the new voltage, and keep the machine control off until the secondary reads balanced line to line. A chart that lists no row for your supply voltage: the transformer does not support that supply, and no rearrangement of the listed taps fixes that — the equipment builder or a transformer supplier sets that up. An as-found block whose legs already disagree: sort the existing mis-tap before adding the new pattern, because two errors on one terminal block are far harder to separate than one.

Questions asked

Does the one-row convention apply to the secondary taps as well?

Yes. The same chart usually prints secondary rows for the machine's internal voltages, and the row you select there is also one leg's recipe: build it identically on all three secondary legs unless the chart itself prints a different grouping for that winding. Genuinely single-phase sections in the same cabinet follow their own printed rows, and those connections are made once.

How do I check the legs against each other before power-up?

With the covers off and the supply locked out, each leg's terminal group should show the same jumpers in the same positions. Marking a photo of the block with the intended bar positions, then having a second person compare the marked photo against the chart, catches a leg wired differently faster than any test made after the primary is energized.

What does a single-phase machine transformer's chart show?

A single-phase transformer has one winding pair, so its chart prints every connection for the whole transformer and the per-leg question never arises; you make each listed connection exactly once. The confusion belongs to three-phase charts, where the printed row is one leg's recipe repeated three times and the block carries three identical terminal groups.

Which row do I choose when the chart lists several nearby voltages?

Measure the actual line-to-line voltage at the machine disconnect and choose the row nearest that measurement. When the reading sits between two rows, the equipment documentation or the builder names the closest acceptable setting; mixing connections from two different rows is never the answer. Verify the supply again under load if the shop voltage sags noticeably.

Keep reading

  • How-to

    Retapping a 380 V machine transformer for a 240 V supply

    On a 240 V supply, the 208 V primary tap puts the 380 V secondary at 438.5 V, 9.6% over a 400 V machine. Re-tap the primary to the 230 V connection for 396.5 V, and land the fourth wire on protective earth: a three-phase delta feed has no neutral.

    Power distribution and transformers

  • Selection guide

    Is a 6 kVA transformer enough for a 5 hp motor drive

    A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V and 15.1 A at 230 V. A 5 hp rating is 3.73 kW of shaft output, not input kVA. Measure the machine's simultaneous input current at its heaviest cut: if it stays under the transformer's nameplate current, the 6 kVA unit is enough; if it crosses, order the next standard size.

    Power distribution and transformers

  • How-to

    Powering a 600 V three-phase machine from 240 V single phase

    The nameplate works out to 20.8 kVA of apparent power. Fed from the single-phase shop service, that is about 87 A before converter and transformer losses, so the machine needs a rotary phase converter sized to its total demand plus a reverse-connected step-down transformer, unless tracing shows the internals run on 200 to 220 V. Verify loaded voltage balance before releasing the machine to production.

    Power distribution and transformers