Short answer

A converter idler fed only by run capacitance starts like a permanent-split-capacitor motor, with almost no breakaway torque, so a hum with no rotation means that thin margin collapsed. Verify supply voltage and contact drop during the attempt, test the capacitor bank as a unit, confirm lead numbers after any bench run, then prove the fix with a momentary-duty start capacitor across the manufactured leg before suspecting rotor damage.

On this page
  1. Why a capacitor-only start has so little torque
  2. What the bank carries at standstill: 600 µF across 240 V, 60 Hz
  3. The checks, in order
  4. Supply voltage at the idler terminals during the attempt
  5. Test the bank as a unit, from T2 to T3
  6. Match the lead numbers after any bench run
  7. The start-capacitor test that decides it
  8. The fix in each case
  9. Questions asked

A rotary phase converter that hums without turning has lost its breakaway torque, not necessarily a component. With no start circuit, the idler closes in as a permanent-split-capacitor machine: the only torque at standstill comes from the phase shift the run bank creates in the manufactured leg, and on a 15 HP idler that margin was always thin. The capacitors test good and the motor runs clean on a three-phase bench, so the cans and the windings are not the fault. What remains is the single-phase start path and the margin itself. Work the four checks in order, and let the start-capacitor test decide: if the idler starts with help and then runs smooth on the run bank alone, install a permanent start circuit; if it still hums with a proving bank in the circuit, the rotor is the suspect.

Why a capacitor-only start has so little torque #

With T1 and T2 on the single-phase lines and the run bank bridged from T2 to the manufactured leg T3, the idler is, at the instant the switch closes, a permanent-split-capacitor motor. That design builds its rotating field from one capacitor and no centrifugal switch, and it pays for that simplicity with weak locked-rotor torque — a small fraction of rated torque, because the phase shift the bank produces at standstill is modest and the main winding gets no help from rotation.

An idler turns nothing but itself, so this converter started for thirty years whenever conditions leaned its way: healthy supply voltage, tight joints, free bearings. None of those fails loudly. Contact resistance climbs with every hot start, the supply sags a few volts under a neighbor's load, grease stiffens — and one day the sum tips below breakaway. The hum is that tipping point, not a diagnosis in itself.

It also explains the day a 3 HP motor went straight across the output leads at standstill. Two locked rotors on one manufactured leg drag the leg voltage down and divert the capacitor current the idler needed, so the idler stalls and hums, and that stall current runs through the switch poles and lugs — the first place to look for heat damage. The same leading current shows up in an idler's unloaded draw, covered in Why rotary phase converter idle current is so high.

What the bank carries at standstill: 600 µF across 240 V, 60 Hz #

The inputs, and where each comes from:

  • Bank: twelve 50 µF capacitors in parallel, as this converter is built.
  • V = 240 V, single phase: the nominal supply behind the 245 V panel reading.
  • f = 60 Hz: the supply frequency; confirm yours before reusing these numbers.

The rule, in words: capacitors in parallel add, reactance falls as capacitance rises, and each branch draws current equal to voltage divided by reactance, with X_C = 1 ÷ (2πfC). Parallel branch currents add.

The arithmetic:

  • Total capacitance: 12 × 50 µF = 600 µF.
  • Reactance per can: X_C = 1 ÷ (2π × 60 Hz × 50 µF) = 1 ÷ 0.01885 Ω⁻¹ ≈ 53 Ω.
  • Current per can: I = 240 V ÷ 53 Ω ≈ 4.5 A.
  • Bank current: 12 × 4.5 A ≈ 54 A; cross-check through the whole bank, X_C = 1 ÷ (2π × 60 Hz × 600 µF) ≈ 4.42 Ω and 240 V ÷ 4.42 Ω ≈ 54 A.

Result: at the instant of a start attempt the bank feeds roughly 54 A of leading current into the manufactured leg, 4.5 A per can.

Decision: clamp the bank feed during an attempt. A reading in the tens of amperes says every branch is conducting; each open can deletes about 4.5 A from the reading; a reading near 0 A, or low by whole multiples of the per-can value, puts the open between the cans and the motor terminals. The stalled winding holds the bank voltage below the line, so treat these figures as branch-detection references, not as an expected running current.

The checks, in order #

Four checks cover the places this fault can live, fastest first:

  1. Voltage reaching the idler during the attempt, and drop across each closed switch pole.
  2. The capacitor bank tested as a unit from T2 to T3, with a clamp reading at the attempt.
  3. Motor lead numbers against the bank and supply connections, especially after a bench run.
  4. Start response with a momentary-duty proving bank added across T2-T3.

Supply voltage at the idler terminals during the attempt #

Set the reading up before you close the switch: leads on T1 and T2 at the motor terminal box, covers in place, then read while the motor hums. Measurements made with equipment energized are covered by NFPA 70E, the standard for electrical safety-related work practices, 2024 edition — it sets the absence-of-voltage verification, approach boundaries, and protective equipment for exactly this kind of reading; confirm what applies to you with your authority having jurisdiction and the equipment documentation. Read across each closed pole of the 2-pole switch as well: a corroded contact or loose lug reads normal with no load, and its drop scales with start current, so the number means something only during the attempt. The across-the-line 3 HP event pushed locked-rotor current through those poles, so inspect them and the lugs for heat marks.

Reading during the attempt Meaning Next
T1-T2 near 0 V open pole, fuse, or conductor — not the motor repair the open, retest
T1-T2 well below the panel reading a pole, lug, or supply conductor is dropping voltage chase it pole-to-pole and lug-to-lug, repair, retest
T1-T2 within a few percent of the panel reading the supply path is sound move to the bank test

On the case supply the panel reads 245 V; within a few percent of that at the terminals is healthy. Anything markedly lower is a connection problem, not a motor problem.

Test the bank as a unit, from T2 to T3 #

A bench capacitor tester clears each can on its own. It says nothing about the bus, the joints, or any fuse or link between the bank and T3, and twelve good cans behind one open joint act as no capacitance at all — which produces exactly this hum.

Before opening anything: de-energize, verify absence of voltage, lock out the switch, and discharge every capacitor through a rated resistor, because the bank holds a dangerous charge after the supply is off. Then measure capacitance at the bank terminals where it meets T2 and T3, motor leads disconnected: twelve parallel cans should read close to 600 µF, within the tolerance printed on the labels. Reconnect, energize, and clamp the bank feed or the T3 lead during a start attempt; the worked example above sets the reference and the threshold.

Bank test Meaning Next
Capacitance far below nominal, or clamp current near 0 A open joint, bus, or lead between the cans and the terminals repair the joint, retest the start
Capacitance near nominal, clamp current in the tens of amperes bank and its wiring are sound move to the lead check

Match the lead numbers after any bench run #

The motor left for the bench with the capacitors disconnected and came back from a three-phase run. A three-phase bench does not care which lead lands where; the converter does. The supply must land on T1 and T2, and the bank must bridge T2 and the manufactured leg T3. If leads went back by position instead of by number, the bank now phase-shifts the wrong winding pair: starting torque collapses while the bench result stays perfect. Check continuity from each bank terminal to the numbered motor lead the bank was built around, put any lead that moved back on its number, and retest.

The start-capacitor test that decides it #

With the supply, the bank, and the lead mapping sound, give the circuit the capacitance it never had. Wire intermittent-duty motor-start electrolytics across the same T2-T3 pair through a momentary pushbutton — start electrolytics, not run capacitors. Common converter-building guidance sizes a start bank at roughly twice the run capacitance, and the standard replacement values for rotary converters are 270-325 µF at 220-250 VAC, so four of those in parallel put this 15 HP idler at about twice its run bank — a sound proving bank. Press the button for the start attempt only, and never hold a start electrolytic in past the attempt.

The shaft on this idler is cut and capped at both ends, so there is no rope start and nothing to couple a helper motor to. This test is the way to prove the motor will run once it is turning.

Start test Meaning Decision
Accelerates and runs smooth on the run bank alone after release no part failed — the capacitor-only margin collapsed as contacts, voltage, and bearing drag aged install a permanent start circuit
Still hums with the proving bank pressed torque is missing at the rotor suspect rotor bar or end-ring damage or a mechanical lock; back to the motor shop for a rotor test

The fix in each case #

  • An open or a hot pole in the supply path: repair it. The converter returns to its old behavior, but install the start circuit anyway — a margin that failed once will fail again.
  • An open in the bank path: repair the joint between the cans and the terminals. Original behavior returns, and the same argument for a start circuit applies.
  • Starts on the proving bank and runs clean on the run bank alone: build the permanent version — a start bank across T2-T3, dropped out by a potential relay that senses the rising manufactured-leg voltage, or by a timer-and-contactor shortly after the idler reaches speed.
  • Still hums on the proving bank: the motor shop's rotor test decides. A smooth unloaded bench run is consistent with rotor damage, because unloaded current is small and even.

Keep the start order that the across-the-line event broke: energize the idler alone, let it come fully to speed, then close loads one at a time, largest last; a load paralleled at standstill starves the manufactured leg of the current that starts the idler. Do not answer a weak start by padding the run bank — oversized run capacitance makes an idler run hot, covered in Why a rotary phase converter overheats after startup. A machine that keeps dropping out on the third leg gets its own investigation, covered in Fixing a machine shutdown on a rotary phase converter third leg. And when a converter earns replacement rather than repair, feeding the idler from a VFD retires the capacitor-start problem entirely, covered in Feeding a rotary phase converter idler from a VFD.

Questions asked

Why does the idler hum without spinning instead of tripping the breaker right away?

The hum is locked-rotor current. The winding across the single-phase lines sees full voltage and draws several times the idler's rated current, while the manufactured-leg winding gets only the small phase-shifted current the run bank supplies. With no rotation there is no generated voltage to pull the current down, so a stalled attempt heats the windings quickly. Keep each attempt to a couple of seconds and let the motor cool before trying again.

How long can a start capacitor stay in the circuit?

Motor-start electrolytics are intermittent-duty parts, rated for a few seconds per start and a limited number of starts per hour. A momentary pushbutton drops the bank out the instant you release it; in a permanent circuit, a potential relay or timer-and-contactor takes it out within about a second of the idler reaching speed. Left in continuously, a start electrolytic overheats and can vent.

Why did the three-phase bench run pass if something is wrong?

On a balanced three-phase supply the motor needs no capacitor at all: every winding sees a proper voltage and the rotor turns at light load, where even damaged rotor bars can draw evenly. A capacitor-only start is the opposite condition. The manufactured leg exists at standstill only through the phase shift the bank creates, which is exactly what a three-phase bench never exercises.

Can a pony motor start an idler that has no start circuit?

Yes, and it is an old farm practice: couple a small single-phase motor to the idler shaft, spin the idler to speed, energize it, and add loads one at a time. It needs an accessible shaft end for the coupling. An idler with the shaft cut and capped at both ends offers nothing to couple to, so the proving bank test and then a permanent capacitor start are the practical path.

Keep reading

  • Selection guide

    Using a 575 volt motor as a rotary phase converter

    Yes, a 20 hp, 575 V three-phase motor makes a workable rotary converter idler on a 575/600 V single-phase supply, provided the run capacitors are rated at least 895 VAC, the start bank at least 575 VAC, and the start relay is fed through a 575:240 control transformer. On 240 V the same motor carries only about a 7.5 hp load, so match the idler to the supply.

    Motors and motor starters

  • Troubleshooting

    Why more run capacitance overheats a static phase converter motor

    Keep the 25 µF run capacitor. Its worst lead reads about 118 percent of nameplate, while 50 µF drives that lead to about 158 percent, and heating rises with the square of current. Tune to the lowest highest-lead current, hold the converter's two-thirds load limit, and reject any capacitor step that raises the worst reading.

    Motors and motor starters

  • Troubleshooting

    Why rotary phase converter idle current is so high

    About 35 A at idle on a 25 HP, 230 V idler with a 67 A nameplate is magnetizing current, not a fault: induction motors draw 25 to 50 percent of full-load current at no load. The old 3 A reading came from half-voltage excitation. Verify with true input watts and winding temperature, and leave the windings connected.

    Motors and motor starters