Short answer

Yes. A larger conductor downstream of a smaller incomer is normal practice when a long run needs a lower voltage drop, provided the device at the supply end protects the smallest conductor in the chain. On the worked example here, the 2% total drop holds only if each sub box draws roughly 10.7 A, not the full 32 A.

On this page
  1. The rule that makes it legal
  2. A worked voltage-drop example
  3. Temperature and reactance corrections
  4. Fault withstand on the incomer
  5. Earth-fault loop on the long sub runs
  6. Verifying the installed circuit
  7. The decision
  8. Questions asked

Is a 6 mm² incomer feeding 10 mm² sub-circuit cables acceptable? Yes, and it is not a mistake. Larger conductors downstream of a smaller one are normal practice when a long run needs a lower voltage drop. Current-carrying capacity figures such as 61 A for the 6 mm² four-core and 81 A for the 10 mm² two-core are limits on each cable, not a requirement for descending sizes along a route. The conductor that sets the protection duty is the smallest one in the chain: the 6 mm² incomer. The device at its supply end already trips for any overload the incomer cannot carry, so the bigger sub cable adds margin rather than risk. What actually decides the design is the load per sub box, the operating-temperature resistance, and the earth-fault loop on those long sub runs.

The overcurrent-protection requirements for low-voltage installations are set by IEC 60364-4-43, with conductor selection and erection in IEC 60364-5-52. In plain terms: every conductor needs a protective device that interrupts overload before the conductor exceeds its permitted temperature, and for a conductor tapped off a larger one, the upstream device sized to the smaller conductor satisfies that duty automatically. Requirements differ by country, edition and local amendment, so confirm the tapping rules with your local authority having jurisdiction and the installation specification.

For the chain here, the device ahead of the 6 mm² incomer carries the whole overload duty. Its rating must sit at or above the design current and at or below the derated capacity of the 6 mm² cable, after applying the grouping, ambient-temperature and installation-method factors that apply on site, not the tabulated figure.

A worked voltage-drop example #

The 2% figure only reproduces under one loading assumption. Take these inputs, which are illustrative: a 32 A total load split evenly across three single-phase sub boxes, so about 10.7 A per box; a 30 m three-phase 6 mm² copper feeder; three 90 m single-phase 10 mm² copper sub runs; resistive load, reactance neglected; copper resistance about 0.0175 Ω·mm²/m at 20 °C; 400 V line-to-line and 230 V single-phase references.

Three-phase feeder drop:

VD = √3 × I × L × (ρ / S) = 1.732 × 10.7 A × 30 m × (0.0175 / 6) Ω/m ≈ 1.6 V, about 0.4% of 400 V.

Single-phase sub-run drop, two conductors in the loop:

VD = 2 × I × L × (ρ / S) = 2 × 10.7 A × 90 m × (0.0175 / 10) Ω/m ≈ 3.4 V, about 1.5% of 230 V.

The sum, roughly 1.9%, is the claimed 2%. Now move the load: if each sub box draws the full 32 A, the sub-run leg becomes 2 × 32 A × 90 m × 0.00175 Ω/m ≈ 10.1 V, 4.4% of the single-phase reference, and the total reaches roughly 5.6%. The 2% target fails, and the sub run needs a larger cross-section than 10 mm². Read the per-box design current from the load schedule before accepting any of these numbers.

Leg Conductor and length At 10.7 A per box At 32 A per box
Feeder, three-phase 4C 6 mm², 30 m about 1.6 V, 0.4% of 400 V about 4.9 V, 1.2% of 400 V
Sub run, single-phase 2C 10 mm², 90 m about 3.4 V, 1.5% of 230 V about 10.1 V, 4.4% of the single-phase reference
Total — about 1.9% about 5.6%

Adding the percentages is conservative here, because the two legs are referred to different voltages and so represent different absolute volts. The cleaner check is to add the volts and divide by the single-phase load voltage.

Temperature and reactance corrections #

The 0.0175 Ω·mm²/m figure is a cold-conductor value. At operating temperature, copper resistance rises, so a leg calculated at 1.5% using 20 °C resistance can exceed 1.5% at full load. For these small cross-sections, reactance is a minor term against resistance, but the cable datasheet's mV/A/m figures include both. Pull the mV/A/m values for the 6 mm² four-core and 10 mm² two-core from the manufacturer's datasheet, compute each leg as mV/A/m × I × L / 1000, convert to a percentage of its own reference voltage, and sum. This result is an estimate to be checked against the governing code and the cable documentation. For a worked example of how a long, lightly loaded run dominates the total, the 500 ft hoist feeder case follows the same arithmetic (Sizing a 500 ft hoist motor feeder with festoon cable).

Fault withstand on the incomer #

Overload is half the check. The 6 mm² conductor must also survive a fault until the supply-end device clears it. Compare the device's let-through I²t against the 6 mm² conductor's thermal withstand for the available fault current at the main junction box; the method is the same one used for fuse let-through sizing (Sizing cable withstand with fuse total I²t let-through).

Earth-fault loop on the long sub runs #

A long, small-conductor run raises the fault-loop impedance: the loop resistance accumulates over both the phase conductor and the protective conductor, so one of these long runs can leave too little fault current to trip the upstream device within the required disconnection time. Calculate or measure the loop impedance at the far end of each sub run and compare the prospective earth-fault current with the trip threshold of the device for the required time. The 10 mm² phase conductor helps; the protective conductor in the two-core cable, or an external earth path, sets the other half of the loop.

Each sub box also needs its own overcurrent device on the outgoing side. That device protects the 10 mm² cable and the load. Because the 10 mm² cable has more capacity than the 6 mm² incomer, the sub-box device can be rated for the load and does not need to be matched to the cable maximum.

Verifying the installed circuit #

De-energize, lock out and verify absence of voltage before opening any junction box or termination. Then:

  1. Confirm the design current per sub box and the phase balance across the three boxes.
  2. Confirm the device at the main junction box is rated within the derated 6 mm² capacity and that its let-through I²t is within the 6 mm² withstand.
  3. Measure the loop impedance at the far end of each sub run and record the prospective fault current against the device's trip requirement.
  4. Energize and load the circuit near design current; measure voltage at the main box and at each sub-box terminal.
  5. Compute the measured drop as the difference between source and load voltage, as a percentage, and compare it with the 2% specification.

A measured drop above the calculated value points to a high-resistance termination, a shorter nominal cross-section than specified, a longer route than drawn, or a heavier load on one phase than assumed. Where the three sub boxes load the phases unequally, the neutral carries current and the most loaded phase drops more than the balanced calculation predicts.

The decision #

The 6 mm² incomer feeding 10 mm² sub runs is acceptable on both counts that matter. Protection: the supply-end device sized to the derated 6 mm² capacity covers the whole chain, including the larger downstream cable. Voltage drop: the roughly 1.9% total holds only at about 10.7 A per sub box; at the full 32 A per box it fails and the long sub run needs more than 10 mm². Confirm the per-box load, size the incomer device to the derated cable capacity, verify the let-through I²t and the far-end loop impedance, and the arrangement is sound. If the drop margin is thin at operating temperature, the long sub run is the leg to upsize first, because it dominates the total.

Questions asked

Does any code forbid a larger cable downstream of a smaller one?

No code forbids it. The governing rule, found in IEC 60364-4-43 and its national adaptations, is that every conductor must be protected against overload by a device upstream of it, and the device is sized to the smallest conductor it protects. A bigger conductor downstream adds thermal margin, so it is inherently covered. Requirements differ by country and edition, so confirm the tapping rules with the local authority having jurisdiction.

What current can the 2% voltage-drop figure actually support?

With a 30 m three-phase 6 mm² feeder and three 90 m single-phase 10 mm² sub runs, the 2% total assumes about 10.7 A per sub box. If a box draws the full 32 A, its 90 m run alone drops about 10.1 V, 4.4% of 230 V, and the total reaches roughly 5.6%. Read the design current per box from the load schedule before trusting the 2% figure.

Why add the two drop percentages when the reference voltages differ?

The feeder drop is a percentage of the 400 V line-to-line supply and the sub-run drop is a percentage of the single-phase load voltage, so the two percentages are not the same absolute volts: 0.4% of 400 V is about 1.6 V and 1.5% of the single-phase reference is about 3.4 V. Adding the percentages is conservative for this reason, but the clean check is to add the volts and divide by the single-phase load voltage.

How do I verify the protection on the 6 mm² incomer after installation?

Check the device rating against the derated current-carrying capacity of the 6 mm² cable after applying grouping, ambient and installation-method factors, and check the device's let-through I²t against the conductor's thermal withstand for the available fault current. Then measure the earth-fault loop impedance at the far end of each run and confirm the resulting fault current exceeds the device's instantaneous trip threshold.

Keep reading

  • How-to

    Sizing a 500 ft hoist motor feeder with festoon cable

    Two conductor sizes are allowed on a 500 ft hoist feeder with a festoon section, provided every conductor carries at least 125% of the NEC Article 430 table full-load current and the summed feeder-plus-festoon voltage drop stays within the recommended 3% branch / 5% total. At 500 ft the drop, not ampacity, usually picks the feeder: 2 AWG copper plus a 14 AWG festoon passes the 10 hp, 460 V example at a 1.5% running drop.

    Wiring, grounding and bonding

  • Explainer

    5% voltage drop on single-phase fittings on a three-phase supply

    Take the 5% on the phase-to-neutral voltage at the fitting's terminals: a floor of 218.5 V at the last fitting. The line-to-line figure is the same 5% expressed between phases, not extra margin to spend on a single-phase fitting.

    Power distribution and transformers

  • How-to

    Calculating voltage drop through step-up and step-down transformers

    Yes. A primary voltage drop passes through the turns ratio almost one-for-one in percent — 5% low at 12 kV is 5% low at 480 V — so the study must run every segment from the generator terminals to the farthest branch outlet, combining drops as percentages.

    Power distribution and transformers