Explainer
Why a step-up transformer goes before a phase converter
Short answer
Put the step-up transformer before the rotary phase converter whenever the converter can be configured for a 460 V input. A transformer placed after the converter multiplies the converter's wild-leg imbalance up to the machine voltage — measured pairs spread roughly 40 V apart at 460 V in the case behind this article — and a regenerative DC drive can also return braking energy the converter cannot absorb.

On this page
- Should the step-up transformer go before or after a rotary phase converter?
- Why can't the transformer clean up the converter's wild leg afterward?
- What do the converter voltage readings actually tell you?
- How much transformer and converter capacity does a 13 A, 460 V load need?
- Can a DC drive feed braking energy back into a phase converter?
- When is transformer-after-converter still the right arrangement?
- What must you verify before moving the transformer upstream?
- Questions asked
When a 230 V rotary phase converter has to feed a 460 V machine, the step-up transformer belongs ahead of the converter whenever that converter can be configured for a 460 V input. Placed after the converter, the transformer raises the voltage but carries the converter's phase imbalance straight up with it: in the installation behind this article, the generated leg sat at 201 V to ground and swung on every spindle start and stop, and the transformed output showed line-to-line pairs about 40 V apart at the machine. A solid-state DC drive cannot run on that for long. Stepping the single-phase supply up to the machine voltage first lets the converter build its third leg at the voltage the machine was designed for, which is the best supply that converter can make.
Should the step-up transformer go before or after a rotary phase converter? #
Put the transformer before the converter whenever the converter can be configured for the machine's utilization voltage, because a converter fed balanced power at its rated voltage generates its third leg at that voltage and gives the machine the cleanest supply that converter can produce.
Both orders perform the same 2:1 step from service voltage to machine voltage, so the placement matters for one reason only: it decides where the phase imbalance is created. Transformer-first puts the converter's whole phase-generating job at the utilization voltage, against the machine that depends on it. Converter-first creates the imbalance at the service voltage and lets the transformer scale it up. Vendors do sell factory-matched converter-and-transformer packages wired converter-first for general three-phase equipment, so that order is a supported design for tolerant loads — just not for a machine whose spindle drive is a piece of electronic equipment.
Why can't the transformer clean up the converter's wild leg afterward? #
A transformer changes voltage magnitude by its turns ratio and does nothing to balance the three phases, so the percentage spread between the converter's line-to-line pairs at the service voltage reappears at the machine voltage, with the voltage spread doubled to match.
In the measured case, the pairs at the machine after a 2:1 step-up read roughly 450 V on the two pairs built from the utility legs and 490 V on the pair containing the generated leg — about a 9 percent spread, which is the converter's imbalance expressed at the higher voltage. The generated-leg voltage also moved every time the spindle started and stopped, because a rotary converter's third leg is load-dependent by construction. No tap setting corrects that: taps shift the magnitude on all three phases equally. The method for measuring and sizing around this kind of unbalanced secondary is the same one used to size a three-phase transformer for unbalanced 230 V loads.
What do the converter voltage readings actually tell you? #
The 201 V reading was a voltage to ground on the generated leg rather than a phase voltage, so it describes the grounding reference as much as the supply, while the 450 V and 490 V readings were line-to-line pairs whose spread is what the drive actually objects to.
A voltage-to-ground figure on an ungrounded or reference-shifted system cannot establish phase balance, and neither can two of the three pairs. To quantify imbalance you need all three line-to-line pairs:
imbalance (%) = 100 × (largest deviation from the average pair) ÷ (average pair)
For example, if the third pair measured 470 V — an example value, not a recorded one — the average of 450 V, 470 V and 490 V is 470 V, the largest deviation is 20 V, and the imbalance is 100 × 20 ÷ 470, about 4.3 percent. Compare the measured set against the drive's documented input limits, and where the drive manufacturer specifies its own acceptance method, use that instead.
Tag the generated lead at the converter terminals and carry that tag through the transformer connection diagram, because a winding arrangement can shift which secondary pair measures highest; the knowledge-base page on labeling the generated leg in rotary phase converters walks through the convention.
How much transformer and converter capacity does a 13 A, 460 V load need? #
About 10.4 kVA of three-phase output, taken from the next standard transformer frame above it, with the machine nameplate of 460 V, three-phase, 13 A governing over any number calculated here.
The calculation behind that answer, with every input stated:
S = √3 × V × I = 1.732 × 460 V × 13 A = 10,357 VA ≈ 10.4 kVA
A 15 kVA single-phase transformer, 230 V primary to 460 V secondary, sits ahead of the converter. The converter needs a continuous output rating of at least 10.4 kVA and the ability to accelerate the spindle, which the drive documentation governs. Estimated feeder currents: about 10,357 ÷ 230, or 45 A per line on the 230 V service side, and about 10,357 ÷ 460, or 23 A on the converter's single-phase input, both before losses. These are estimates to be checked against the governing code and the equipment documentation; the same load-first method is what the 6 kVA transformer question for a 5 hp motor drive turns on.
Can a DC drive feed braking energy back into a phase converter? #
Yes — a regenerative DC drive reverses power flow while decelerating the spindle and returns braking energy to its supply, and a rotary converter feeding through a transformer is a far softer source than the utility grid, so the returned energy shows up as voltage disturbance at the converter itself.
Two DC drive topologies decide this. A single-converter drive dissipates braking energy in resistors and never pushes power upstream. A double-converter drive, two thyristor bridges facing each other, regenerates into whatever supply it sees; utility systems and large interties absorb that power readily, which is why regeneration is routine there. Whether this particular machine regenerates is settled by its schematic, not by its reputation — order the machine-specific drawing, find the armature converter, and count the bridges. The phase-converter manufacturer who warned about a double converter was describing exactly this topology, and on a converter-fed supply that warning deserves weight rather than a trial by blown fuses.
When is transformer-after-converter still the right arrangement? #
For resistive heaters and plain three-phase motors, converter-then-transformer is a supported design and is exactly how factory-matched service-voltage-in, machine-voltage-out packages are sold, while a machine tool with solid-state controls, a regulated DC drive or any electronic power supply is the wrong load for it.
The deciding test happens at the load, not at the converter. Measure all three line-to-line pairs at the machine terminals, idle and running, through a start and a stop, and compare the set against the drive's documented input-voltage and imbalance limits. Inside those limits, run the arrangement as built. Outside them, or undocumented, move the transformer ahead. A machine that drops out on the converter's third leg is its own diagnostic sequence, covered step by step in the article on fixing a machine shutdown on a rotary phase converter third leg.
What must you verify before moving the transformer upstream? #
Verify first that the converter is rated for a single-phase input at the machine's utilization voltage, second that the transformer taps and connection diagram match the new service, and third that the secondary grounding follows the installation rules for transformers on the site.
A converter built for the service voltage only cannot simply be connected to the higher machine voltage; that rating comes from the converter nameplate and, where it is unclear, from the manufacturer in writing. For the transformer installation itself, NFPA 70, the National Electrical Code, 2023 edition, covers transformer installations in Article 450 and grounding and bonding in Article 250; requirements differ by country, edition and local amendment, so confirm the applicable rules with the authority having jurisdiction and the equipment documentation. Before you open the panel, the transformer terminal box or the drive: de-energize, lock out, and verify absence of voltage. Any energized voltage survey belongs to qualified people using appropriately rated instruments, and NFPA 70E, 2024 edition, governs that work.
The decision, case by case. A converter rated for the machine voltage and an electronic load: transformer ahead of the converter, about 15 kVA for this 10.4 kVA nameplate, with measured voltages checked against the drive's input limits before first power-up. An existing converter-first arrangement feeding a tolerant load whose measured three pairs sit inside the drive's documented limits: leave it as built.
Questions asked
Does the machine's control power belong on the two utility legs?
Moving the control feed to the steadiest pair can stop nuisance control trips, but it leaves the armature supply unbalanced, so treat it as a workaround rather than a repair. Trace the control-power pair on the machine-specific schematic first, confirm any phase-sequence requirement, and fix the supply arrangement instead of designing around it.
Why did three semiconductor fuses open in the drive?
Open semiconductor fuses are a result, not a diagnosis: something in the drive's power stage faulted, or the supply disturbance contributed to it. Test the power stage per the drive manufacturer's documented procedure before installing replacements, and match the replacement fuse class and ratings to the full fuse markings, because one ampere figure alone does not identify a suitable fuse.
Can a VFD replace the rotary converter for this lathe?
A VFD makes three phases from a single-phase supply for one motor, not for a whole machine; the controls, coolant pump and hydraulics still need their own arrangement, and a regenerative DC drive on the output raises braking questions of its own. If the lathe is the only three-phase load, size the drive with its manufacturer around the DC drive's input requirements.