Short answer

The 2-20% ratio error is a winding-termination problem, not core magnetization or a bad test set: reverse injection must circulate current through the bushing conductor, and a floating winding leaves that loop undefined. Ground and short every winding not under test as the test set manual specifies, and the error falls to about the 0.5% the same CTs reach on breaker bushings.

On this page
  1. How reverse injection loads the bushing
  2. Why the error lands between 2 and 20 percent
  3. Checking a 600/5 bushing CT that reads 20% error
  4. Set the termination before the next run
  5. If the error stays high
  6. Restore and confirm
  7. Questions asked

Ratio errors of 2-20% on transformer-mounted bushing CTs, while the same CTs test clean on breakers, point to the termination state of the transformer windings — not to the CTs, the test sets or the power-transformer core. Injected into the CT secondary, the test current drives the CT in reverse and has to circulate through the bushing conductor and whatever sits behind it. On a breaker that is a dead-ended stud; on a transformer it is a winding lead, and a floating winding leaves the loop undefined. Ground and short every winding not under test exactly as the test set manual specifies, and the error falls to about the 0.5% the breaker-mounted units already reach.

How reverse injection loads the bushing #

A bushing CT is a toroidal core with a wound secondary; the primary is the bushing conductor passing through the window. A ratio test by secondary injection runs the CT backwards: the set pushes a known current into the secondary and derives the ratio from the response in the primary loop, so the CT must develop enough voltage to move current through everything the conductor touches. That requirement is the subject of reverse current injection with a CT, where burden voltage decides the result.

On a breaker the loop is the stud plus a short test jumper, with nothing coupled to it. On a transformer the conductor ends at a winding, and a real loop exists only when the current can return through a grounded winding terminal, the station ground mat and a jumper back to the bushing top. Two different automated sets agreeing on the same wrong number is expected here: both drive the same network, and the network — not the instrument — sets the result.

Why the error lands between 2 and 20 percent #

With windings floating, little current follows the intended loop. What the set measures comes from paths nobody designed for the test: current magnetizing the winding through its magnetizing impedance, current coupling into other windings and returning through whatever happens to be grounded, and capacitive current to the tank. Every bushing sits in a different one of these networks — a wye neutral, a delta corner and a tertiary bushing do not behave alike — so the shortfall scatters across the reported 2-20% band and moves whenever a ground changes. That behavior is the diagnostic: a defective CT repeats the same wrong ratio on every run, while a termination problem shifts with the grounding state.

The power-transformer core fits the same picture rather than a separate one. Once the loop is closed, the loop current flows through the winding as load current, which adds only leakage flux; core flux follows the voltage across the winding, and in this test that is just the small impedance drop of the loop. The core dominates only while the loop is open — exactly the condition the grounding removes.

Checking a 600/5 bushing CT that reads 20% error #

Worked example, one CT, every input stated.

Inputs:

  • Marked ratio 600/5, that is 120:1, taken from the CT nameplate — the same class of ratio covered when checking a 600/5 CT ratio for transformer protection.
  • Injected secondary current of 5 A, the rated secondary current, set on the test set.
  • First-run error of 20%, the top of the band these transformer-mounted CTs showed before any winding was grounded.
  • Reference level of 0.5%, the error the same CTs reach on the breaker bushings of this installation.

The rule, in words: the set computes the ratio as loop current divided by injected secondary current, and the error as the computed ratio minus the marked ratio, divided by the marked ratio.

The arithmetic:

  • Expected loop current: 5 A × 120 = 600 A.
  • At 20% error the computed ratio is 120 × (1 − 0.20) = 96, so the loop carried 96 × 5 A = 480 A, and 600 A − 480 A = 120 A went into the winding's magnetizing and coupling paths instead of around the loop. The sign of the error depends on which parasitic path dominates; the magnitude is the symptom.
  • The acceptance window at the breaker reference level: 120 × (1 ± 0.005) = 119.4 to 120.6, a loop current of 597 to 603 A.

The decision: with the winding's far terminal grounded, the other windings shorted and grounded, and the bushing top jumpered to ground, a repeat run that lands between 597 and 603 A passes, and the CT matches its breaker-mounted counterparts. A reading outside that window on one CT, with the termination verified, is a local fault in that CT or its wiring, and the search moves to the terminal block.

Set the termination before the next run #

This is de-energized work: isolate the transformer, apply the lockout, verify absence of voltage at the bushings and apply the station ground set before anything is touched. NFPA 70E, 2024 edition, makes a verified absence of voltage part of establishing an electrically safe work condition; confirm the steps against your site's electrical safety program and the authority having jurisdiction.

  • Read the nameplate and winding diagram and list every bushing tied to the CT under test: wye, delta or tertiary, which terminal is the natural ground point, and whether a tertiary is buried and unreachable.
  • Disconnect the line or bus connection at the bushing under test so external paths cannot divide the loop current.
  • Jumper the top of the bushing under test to the station ground so the loop closes through the ground mat.
  • Ground the far terminal of the winding under test — the neutral on a wye, both remaining corners on a delta — and short and ground every other winding as the test set manual specifies. Floating any winding is what produced the error band.
  • Verify the tank ground, and that the neutral matches the state the manual calls for.
  • Short the unused ratio taps of the CT under test and any adjacent CT secondary in the test area; an open secondary carrying current is hazardous. The separate factory test winding is a different winding under different rules — why a bushing CT test winding can stay open in service — and the test record should keep the two apart.
  • Select the tap the protection actually uses and set the marked ratio to that tap: on a dual-ratio CT the secondary is center-tapped, and each tap pair carries its own ratio, read from the nameplate rather than the terminal label.
  • Inject, record ratio and polarity, and repeat on at least one CT of each bushing group.

If the error stays high #

Observation Likely cause Action
Error moves when a ground or jumper changes Winding coupling still in the loop Rebuild the termination against the manual's grounding instructions and retest
All CTs read high on two different sets Setup: leads, clamps, tap selection Check lead continuity and the tap against the nameplate before blaming hardware
One CT high, its neighbors correct Local fault: wrong tap, shorting link left in, mislabeled terminals Inspect the terminal block and shorting links, then re-inject that CT alone
Repeated runs disagree Residual flux in the CT core Run the set's documented demagnetizing routine; testing bushing CTs after an open secondary covers that sequence

Restore and confirm #

Before re-energizing, remove every test ground and jumper, restore each CT secondary to its normal circuit, return the shorting terminal blocks to their in-service position and check continuity against the wiring diagram — a test ground left on a winding becomes a fault at energization. Then re-energize under the switching order. The record that closes the job: a documented termination for every winding during the test, one CT per bushing group retested inside the breaker-level window, repeat runs agreeing within the set's stated accuracy, and no CT anywhere near the earlier band.

Questions asked

Would primary injection avoid the winding problem?

No. Primary injection drives current through the same bushing conductor and the same winding, so the loop still has to be closed and defined before the number means anything. What makes breaker CTs easy is that the stud has nothing behind it. Whatever direction the current is injected, the winding termination decides the loop, so the grounding and shorting work comes first with both methods.

Is the 0.5% result a standard limit?

No. It is the reference level this installation already reaches on its breaker-mounted CTs, which is exactly what makes it the right comparison after the fix. The formal requirement for a CT is its accuracy class under IEEE C57.13, 2016 edition, which classifies instrument transformers, plus whatever limit the owner's protection standard assigns to the scheme. The test proves the ratio against the marked tap; the breaker result shows what the equipment can do.

When does the CT core need demagnetizing?

When two runs on the same CT disagree. Residual flux left by an open secondary or an interrupted test shifts the excitation point and drags the measured ratio. Run the demagnetizing routine the test set documents, then confirm two consecutive readings agree within the set's stated accuracy. If the readings still disagree after that, the variable is a contact or a tap, not the core.

Does transformer size or voltage class change the fix?

No. The grounding and shorting rule is identical on a small station transformer and a large power transformer. The voltage class sets the insulation distances and the loop impedance the set must drive, and the winding diagram sets which terminals give the return path. Size changes how much voltage the CT must develop, which is a test-set capability question, not a change to the termination rule.

Keep reading

  • Explainer

    Reverse current injection with a CT: burden voltage decides

    A CT multiplies current only into a burden that is nearly a short circuit. Into 1,200 Ω, 100 mA forces 120 V and 12 W at the output, which reflects as 75 MΩ and 30 kV on the 250-turn winding, beyond any 400 µA source and any CT core or insulation. Lower the burden to ohms or less, where secondary injection is standard practice, or drive the load from a 60 Hz source that supplies the voltage and power directly.

    Protection: breakers, fuses and SCCR

  • How-to

    Estimating transformer inrush current for protection coordination

    The rules of thumb are screening gates, not coordination inputs: reported inrush runs 8 to 30 times full-load current and lasts 10 cycles to a minute. Plot the decay curve Ipu = 6 × t^-0.31 with t in seconds — it passes through 25× at the first peak, 12× five cycles in and 3× at 10 s — keep the protective device curve above it and below the transformer damage curve, and handle cold-load pickup separately.

    Protection: breakers, fuses and SCCR

  • Troubleshooting

    Why transformer primary fuses blow 10 minutes after energization

    Magnetizing inrush decays in seconds, so a primary fuse that opens about ten minutes after an unloaded energization is not reacting to inrush. All three phases opening together points to a component that heats and fails under steady voltage — most often arresters rated below the line-to-ground voltage at their position, or circulating current from mismatched taps. A clean oil sample keeps the external arrester first in line.

    Protection: breakers, fuses and SCCR