Explainer
Why a bushing CT test winding can stay open in service
Short answer
Yes: leaving a bushing CT test winding open in service with one end earthed is standard practice, and a multiturn winding is legitimate too. While the working secondary stays closed, the open winding develops only the secondary burden voltage scaled by its share of the turns — millivolts to a few volts in a worked 600/5 case — and the usual short-time rating is 10 A to 20 A, as the manufacturer's winding drawing states.

On this page
Yes. A one-turn test winding on a bushing current transformer, left open in service with one end earthed, is the usual arrangement on power transformer and reactor bushings, and a multiturn test winding is equally legitimate. The open winding never sees the primary voltage: while the working secondary stays closed through its burden, the test winding develops only that burden voltage scaled by its share of the turns — millivolts to a few volts in the worked 600/5 case below. The current rating is a short-time figure, 10 A to 20 A in reported practice, and it is stated on the manufacturer's winding drawing. Everything rests on one condition: the working secondary must never be left open while primary current flows.
The winding IEEE C57.13 describes #
IEEE C57.13-2016, Standard Requirements for Instrument Transformers, covers conformance test requirements for current and inductively coupled voltage transformers used for measurement and protection. Its clause 3.4 defines the bushing-type current transformer: an annular core with a secondary winding insulated from, and permanently assembled on, the core, with no primary winding as an integral part of the structure — the bushing conductor through the core window is the primary, one turn. A test winding is one more small winding on one of those cores, brought out to the terminal board so commissioning can drive the core without threading high current through the bushing. Most built installations carry a single turn; some manufacturers wind several turns instead, and both arrangements are serviceable.
Why an open test winding sits near zero #
A loaded CT is an ampere-turn balance. Secondary ampere-turns oppose primary ampere-turns almost exactly, and the flux left over is only what it takes to induce the voltage that pushes secondary current through the leads, terminals and the connected relay or meter. That same flux links every winding on the core, so the open test winding carries a scaled copy of the secondary voltage:
V_test = V_sec × N_test / N_sec
Both are ideal-winding relations; excitation current and leakage shift measured values slightly, and the winding drawing governs the real terminal voltages. With 120 secondary turns, a one-turn winding gets 1/120 of the secondary voltage and a ten-turn winding 1/12 of it. Earthing one end pins the winding's potential to earth — it does not remove the voltage between the ends, which is why the drawing also states the insulation level and the permissible open-terminal voltage.
Worked example: the voltage at the open terminal #
Inputs for the example: a 600/5 A bushing CT, 120 secondary turns over a single-turn primary, a total secondary burden of 1 Ω (relay coil, terminal block and lead loop), and test windings of one turn and ten turns. The 600/5 ratio is the one covered in checking a 600/5 CT ratio for transformer protection, so the arithmetic carries over.
At rated 600 A primary: secondary current 600 A ÷ 120 = 5 A, secondary voltage 5 A × 1 Ω = 5 V, voltage per turn 5 V ÷ 120 = 41.7 mV. The one-turn test terminal sits 41.7 mV above earth; a ten-turn winding sits at 0.42 V.
Through a 12 000 A fault with the secondary still closed: secondary current 12 000 A ÷ 120 = 100 A, secondary voltage 100 A × 1 Ω = 100 V, and the ten-turn winding reaches 8.3 V — still harmless. Every figure scales in direct proportion to the burden voltage: a heavier burden raises each terminal voltage in the same ratio.
| Condition on the example CT | Secondary voltage | One-turn test winding, open | Ten-turn test winding, open |
|---|---|---|---|
| 600 A primary, secondary closed | 5 V | 41.7 mV | 0.42 V |
| 12 000 A fault, secondary closed | 100 V | 0.83 V | 8.3 V |
| Primary current flowing, secondary open | climbs past the knee point; distorted peaks can reach the kilovolt range at fault-level current | 1/120 of it | 1/12 of it |
Only the bottom row is dangerous, and it is not the test winding's doing: with the working secondary open, the core flux rises until saturation and the open secondary itself develops the hazardous voltage. The test winding merely takes its share.
What more turns buy at commissioning #
Injection through the test winding drives ampere-turns into the core. With a single-turn primary the equivalent primary current is N_test × I_test, and the closed secondary answers with I_sec = N_test × I_test / N_sec. Ten amperes through a ten-turn winding injects 100 ampere-turns, the equivalent of 100 A primary, and the example CT delivers 100 A ÷ 120 = 0.833 A to its relay circuit — a clean reading from a hand-carried test set. One turn would need ten times that current for the same reading, beyond any portable set. A relay element set at 1 A secondary needs 120 ampere-turns, which the ten-turn winding reaches at 12 A — inside the usual short-time rating. That is the manufacturer's case for more turns, and it holds. A low-current ratio check also proves turns, not accuracy class — the accuracy basis of a marking is covered in what an ext. 100% marking means on a current transformer.
Two checks before you connect. Whether the injected current actually arrives at the relay is a burden-voltage question, the subject of reverse current injection with a CT: burden voltage decides. And another closed winding or a shorted tap on the same core diverts ampere-turns, so trace every winding on that core first.
The connection work is de-energized work: isolate the primary circuit, apply lockout and test for absence of voltage before the terminal board is opened. NFPA 70E, 2024 edition, the US electrical-safety-in-the-workplace standard, treats that verified state as an electrically safe work condition; the site procedure and the authority having jurisdiction set the exact steps.
What sets the current rating #
The test winding is short-time duty. It carries current only during commissioning and maintenance tests, for seconds up to a few minutes, so the limit is conductor heating, fixed by conductor resistance and test duration rather than a continuous rating. Reported practice across transformer and reactor installations lands at 10 A to 20 A, which matches portable test sets, and turns trade directly against current because the ampere-turns a given test needs are fixed: double the turns, halve the current. When you specify, state the ampere-turns you need — required secondary current times the turns ratio — and let the manufacturer pick the pair. On the example CT, 20 A short-time through ten turns gives 200 ampere-turns, enough to prove pickup for settings up to about 1.6 A secondary.
The condition everything hangs on #
The arrangement is safe for exactly as long as the working secondary stays closed, and that condition is held by hardware: shorting-type terminal blocks that short the CT before any wire is removed, plus, where the design calls for it, CT secondary open-circuit protection — devices built to limit the voltage across the secondary terminals if the circuit opens. The underlying physics, secondary voltage versus burden and what open-circuiting a CT does to it, is set out in CT secondary voltage versus burden and open-circuit hazards. The single earth on the test winding goes where the drawing puts it, at the terminal board.
The decision #
Three cases, one answer each:
- Existing one-turn winding, open, one end earthed: normal practice. Leave it, and confirm the earth point and link positions against the winding drawing.
- Vendor offers a multiturn test winding: take it. In service its open terminal holds only the burden voltage scaled by the turns share — 0.42 V on the example CT at rated current — and at commissioning it multiplies the secondary current per injected amp. Ask for two items on the drawing: the winding's insulation level and permissible terminal voltage, and confirmation that the working secondary has shorting terminals or open-circuit protection.
- Specifying a new transformer: order a ten-turn test winding rated 20 A short-time, or 10 A if your test set is small, and state the ampere-turns your tests need, so the drawing carries both numbers.
Questions asked
Can the test winding be used to prove metering accuracy?
No. Accuracy verification has to approach rated primary current at several points across the operating range, and a test winding sized for portable injection falls far short of that. Metering accuracy is proven by primary injection through the bushing conductor with a high-current test set. The test winding's job is ratio, polarity, circuit continuity and protection pickup checks.
Why earth only one end of the test winding?
One earth point gives the winding a fixed potential without closing it. Earthing both ends would complete a circuit through the earth path and turn the winding into an extra closed secondary: it would carry current, add burden and slightly shift the ampere-turn balance the working secondary relies on. Keep the single earth at the terminal board, exactly where the winding drawing shows it.
How do you check ratio with no test winding at all?
By the voltage method, which needs neither a test winding nor high current. A low-voltage source energizes the full secondary winding, and the small voltage induced in the bushing conductor, used as a one-turn primary, is read with a millivoltmeter. The voltage ratio equals the turns ratio and the phase relation gives polarity, consistent with the conformance test methods IEEE C57.13-2016 covers.
Does the open test winding disturb the protection secondary?
Practically not. An open winding carries no current, so it adds no ampere-turns and no burden, and the ratio and accuracy class of the working secondary are unchanged. That is also why the winding must never be left shorted in service unless the drawing calls for it: shorted, it becomes a real load on the core and shifts the ampere-turn balance.