Current IntelPower LibraryShop main store

Explainer

Why total system voltage drop exceeds the feeder drop at an 800 A MCC

Power distribution and transformers Published 9 min read

Short answer

Voltage drop adds up in volts from whatever the previous stage actually delivered, never as percentages on mixed bases. With the substation bus measuring 440 V on a 480 V system, a 2% feeder loss leaves about 431 V at the MCC bus - a 10.17% total, not 470 V.

On this page
  1. Why doesn't the MCC bus recover to near nominal voltage?
  2. Do voltage-drop percentages add along a radial path?
  3. Example: what is left at the MCC bus when the source reads 440 V and the feeder loses 2%?
  4. Is the load the reason the source sits low?
  5. Which element in the path is eating the volts?
  6. How low is too low for the motors on that bus?
  7. What actually puts volts back at the MCC bus?
  8. Questions asked

Voltage drop down one radial path is a sum of volts, not a sum of percentages, and each stage starts from whatever the previous stage actually delivered. A 1-2% feeder calculation cannot pull a substation bus that measures 440 V back toward a 480 V system nominal: the load end finishes near 431-436 V, not the 470 V a feeder-only figure suggests. This walkthrough follows the path - transformer secondary, feeder, MCC bus, motor branch - assigns every percentage its base, and ends with the measurements and fixes that put volts back on the bus.

Why doesn't the MCC bus recover to near nominal voltage? #

Because every volt lost upstream stays lost: the feeder's percentage looks small precisely because it acts on a bus already 40 V below nominal, and no series element in a passive path adds voltage, so the load end lands at 431-436 V, not the 470 V the bus estimate promised.

A bus figure produced by applying a feeder percentage straight to nominal carries a hidden assumption: that the source actually sits at nominal. That assumption is the whole disagreement. The honest chain is one subtraction - sending bus minus feeder volts equals load volts - and percentages are bookkeeping wrapped around it, valid only when every one of them divides by the same number. So the first question for any drop figure that arrives, whether from a study or from the utility, is not whether the percent is credible but what base it was computed on.

Do voltage-drop percentages add along a radial path? #

Only on one common base, which a real feeder never gets: each stage's percentage references its own input voltage, so the retained-voltage factors multiply, Vout = Vin × (1 - d1) × (1 - d2), and a 2% feeder loss on the measured sending voltage removes 8.8 V.

Percentages share a base or they share nothing. Because each series element's percent references the voltage at its own input, a chain of them compounds rather than accumulates - the second percent acts on a base already reduced by the first - which is exactly why adding a source percent to a feeder percent overstates the loss. Two operations are legitimate: multiply the retained-voltage factors, or do the whole job in volts. The second is what a technician can check with a meter, so everything below is done in volts, and percentages appear only as summaries with their base printed beside them.

Example: what is left at the MCC bus when the source reads 440 V and the feeder loses 2%? #

Work the path in volts: a 440 V sending bus sits (480 - 440) / 480 × 100 = 8.33% below nominal, and a 2% feeder loss on that 440 V sending base removes 440 × 0.02 = 8.8 V, leaving 431.2 V.

The inputs are the ones in dispute: a substation bus measured under production load, a feeder calculation quoting 1-2%, and a design demand of 514 kVA of three-phase motor load. Run the 1% branch the same way: 4.4 V off, 435.6 V at the bus, 9.25% below nominal.

Feeder loss quoted Volts off the sending bus MCC bus voltage Total below nominal
1% 4.4 V 435.6 V 9.25%
2% 8.8 V 431.2 V 10.17%

If the feeder percent was quoted on the nominal base instead, the subtraction uses 4.8 V or 9.6 V and lands at 435.2 V or 430.4 V - under a volt apart, but print the base either way. The multiply rule reproduces the result independently: 480 V × (1 - 0.0833) × (1 - 0.02) = 0.8983 of nominal, so the total is 10.17%, not the 10.33% a naive percent sum produces.

Check the load current the same honest way: 514,000 VA / (1.732 × 480 V) = 618 A at nominal, and 514,000 VA / (1.732 × 440 V) = 674 A at the depressed bus - inside the 800 A bus rating with about 126 A to spare, though the rating was never the question. Every number here is an estimate until loaded measurements at the two bus points confirm it; the arithmetic settles the argument about bases, and only the meter settles the installation.

Is the load the reason the source sits low? #

Probably, but loading percentage alone proves nothing: 1380 kVA of connected design load on a 1 MVA transformer is 138%, 110.4% after an 80% demand factor, and about 99% if 10% diversity also applies - and none of those ratios sets the secondary voltage.

Case Demand on the 1 MVA transformer Load on rating
Connected design load 1380 kVA 138%
With the 80% demand factor 1104 kVA 110.4%
With 10% diversity on top 993.6 kVA 99.36%

Three different designs hide behind the third row until someone defines whether that diversity shrinks demand, energy, or nothing at all - keep it out of a sizing case until it is defined. None of the rows predicts the secondary voltage either: regulation follows the actual kVA flowing, the load power factor, the transformer's impedance and its X/R, the primary voltage actually delivered, and the tap in use. First-order, per-unit regulation runs about R cos phi + X sin phi on the transformer's own impedance, with a small squared second-order correction - the same per-unit bookkeeping that traces voltage drop through step-up and step-down transformers. So yes: a transformer carrying a continuous production line past nameplate deserves a regulation conversation with its own test report, but the number that settles this argument is still the loaded secondary voltage measured against the primary - and if the primary is healthy while the secondary sags with load, the fix ladder at the end of this article starts at the tap, not at feeder copper.

Which element in the path is eating the volts? #

Two simultaneous readings split the path in half: with production running, record phase-to-phase voltage at the transformer secondary and at the MCC bus at the same instant, and the difference between them is the feeder's volts while the level at the secondary belongs to the source.

Put numbers on the feeder half from the installed conductor: feeder drop = 1.732 × I × (R cos phi + X sin phi), with I the running line current in amperes and R and X the per-phase resistance and reactance in ohms over the one-way length, read for the installed size and raceway from Table 9 of NFPA 70, the National Electrical Code, 2023 edition, Chapter 9. Power factor sits inside the parentheses, which is why the same ohms give different volts at 0.95 than at 0.75 lagging - a feeder that looks generous on amps can still disappoint on volts.

What the two readings show Where the volts are going What to check next
Secondary near its unloaded level, bus low The feeder and its terminations Compare measured feeder volts with the 1.732 × I × (R cos phi + X sin phi) result, then inspect connections and phase balance
Secondary and bus low by similar amounts The source or the transformer Primary voltage, tap position, actual kVA and power factor, transformer test report
One phase-to-phase pair low, two normal Unbalance or a failing connection on one phase All three line currents, then that phase's path
Running levels fine, collapse during a start Starting current through the total source impedance Record the minimum bus voltage during the start

Spot readings invite disputes, so log both points across a full production cycle instead: a fanless mini PC collecting the meter and drive data turns the dip into a trend line rather than a debate. Panel measurements belong to a CAT III-rated true-RMS instrument; average-reading meters underreport distorted motor current and will flatter a sick bus.

How low is too low for the motors on that bus? #

Per NEMA MG-1 (2021 edition), a motor must deliver rated output through a voltage variation of ±10% around nameplate rating, so 460 V machines accept 414 to 506 V - the depressed bus sits inside that band, but the band is a capability, not a design target.

MG-1 states the band for polyphase machines at rated frequency; the nameplate and datasheet govern. Inside the band, capability still erodes: developed torque scales with the square of voltage at fixed frequency, so every 1% of undervoltage costs about 2% of torque, and acceleration time and rotor heating stretch accordingly. Running is not even the worst case - a start pulls several times rated current through the total source impedance at once, and the arithmetic in estimating voltage sag from motor inrush current is the tool for that moment. For design targets, NFPA 70 (2023 edition) carries informational notes recommending 3% on a feeder or branch and 5% combined to the farthest load - advisory text, with the enforceable requirements coming from your authority having jurisdiction and the equipment documentation.

What actually puts volts back at the MCC bus? #

Match the fix to where the two readings put the loss: a low secondary is a primary-voltage, tap or transformer-sizing problem, an excessive secondary-to-bus difference is conductor area, length or termination quality, and the two almost never share a cure.

  • The secondary is low under load. Check the primary voltage against the transformer's rated primary and the actual kVA, then set a tap step permitted by the transformer's documentation. A tap buys back its own step percentage at the secondary and nothing else - it is the cure for a primary that sits consistently off, not for feeder loss.
  • The secondary holds but the bus is low. The loss is feeder copper and terminations: add conductor area or a second conductor per phase, and rebuild any connection that has been running hot. Each 1% of feeder drop removed returns about 4.4 V, and the same conductor-and-length arithmetic that drives fixing voltage drop on a long 277 V lighting feeder applies unchanged.
  • One phase-to-phase pair reads low. Balance the single-phase loads across the three phases and repair that phase's path before touching anything else.
  • The bus runs fine but collapses on starts. Stage the starts or change the starting method, and size that decision with the sag calculation, not with another running-load percentage.

Then close the loop: repeat the loaded readings at both points after the change, and capture the minimum bus voltage through the largest start. A correction that cannot be seen in those two measurements did not happen.

One rule wraps all of it: tap changes, termination repairs and conductor work happen de-energized - lock out, test for absence of voltage, and wear the protective equipment NFPA 70E (2024 edition) assigns to the task - while the loaded voltage readings belong to a qualified person with a CAT III-rated true-RMS meter.

Questions asked

Can transformer taps bring a bus that sits 40 V low back to nominal?

Only partly, and only for a low primary. Most distribution transformers provide two 2.5% tap steps above and below rated primary voltage, shown on the nameplate diagram, so one step recovers roughly 12 V at the secondary. Taps cannot repay feeder volts or hold voltage through a motor start, and the change is made only with the transformer de-energized, locked out and verified. Check the tap table in the transformer's own documentation before deciding.

How deep does the bus dip when the largest motor starts?

The volts lost scale with the current through the same impedance, and a standard design B induction machine draws roughly six times running current at energization, so expect about six times the running feeder volts, with the transformer's own regulation stacked on top. That momentary dip is what releases contactors elsewhere on the bus and trips drives on undervoltage, which is why the minimum voltage during a start gets recorded rather than guessed.

Is the 3% and 5% voltage-drop recommendation in the NEC mandatory?

No. In NFPA 70, 2023 edition, those figures live in informational notes, which state advice rather than enforceable rules. Enforceable limits come from the adopted edition and amendments your authority having jurisdiction applies, and from the operating ranges in the equipment documentation - the motor's voltage tolerance, the contactor coil's pick-up range, and a drive's undervoltage trip settings.

What voltage can a contactor coil pick up at?

Most industrial contactors and control relays are built to the pick-up window of 85% to 110% of rated control voltage that the IEC 60947-4-1 product standard defines. A coil fed from the depressed bus sits near 90% of nominal, so it holds while running, but a deep start dip can momentarily release contactors in other buckets and stop the line. Confirm the pick-up and drop-out limits in the contactor's own documentation rather than assuming the class minimum.

Keep reading

  • How-to

    Calculating voltage drop through step-up and step-down transformers

    Yes. A primary voltage drop passes through the turns ratio almost one-for-one in percent — 5% low at 12 kV is 5% low at 480 V — so the study must run every segment from the generator terminals to the farthest branch outlet, combining drops as percentages.

    Power distribution and transformers

  • How-to

    Fixing voltage drop on a long 277 V lighting feeder

    The drop budget on this feeder limits the loop to 0.40 Ω — 0.267 Ω per conductor — so size up the copper or split the load across the three phases of the wye system, which relaxes the limit sixfold. Raise the source only after the two-endpoint check, because a fixed boost that fixes full-load voltage also overvoltages the panel at light load.

    Power distribution and transformers

  • How-to

    Powering a 600 V three-phase machine from 240 V single phase

    The nameplate works out to 20.8 kVA of apparent power. Fed from the single-phase shop service, that is about 87 A before converter and transformer losses, so the machine needs a rotary phase converter sized to its total demand plus a reverse-connected step-down transformer, unless tracing shows the internals run on 200 to 220 V. Verify loaded voltage balance before releasing the machine to production.

    Power distribution and transformers