No tested duration exists for induction-motor contribution into an arcing fault. The one published test, on a bolted three-phase fault, shows an unloaded high-voltage motor group at 18% of locked-rotor current at 100 ms, and arc resistance only speeds the decay. Keep 100 ms as a reference and run two cases: minimum source-only current for clearing time, maximum current with full motor contribution for incident energy.
On this page
No tested decay time exists for motor contribution into an arcing fault. The only published measurement behind the familiar 100 ms figure is a bolted-fault test: a group of unloaded high-voltage induction motors closed onto a solid three-phase fault had fallen to about 18% of locked-rotor current at 100 ms. Arc resistance makes the contribution decay faster than that, not slower, but nobody has published a validated multiplier for how much faster. So the decision is not to tune that one number. Keep 100 ms as a reference for the bolted case, and bound the uncertainty with two study cases: minimum source current for the clearing time, maximum current with full motor contribution for the incident energy.
The published test measured a bolted fault, not an arc #
The measurement everyone cites is in Siemens Review XXXVII (1970). A feeder breaker on the high-voltage MCC supplying a group of unloaded induction motors was closed onto a three-phase bolted fault, and the group's contribution decayed to roughly 18% of its locked-rotor current at 100 ms.
That is a clean result for a solid fault with unloaded machines. It says nothing about the two things an arcing fault adds: arc resistance and arc voltage in the loop, and motors that were loaded when the fault struck. Field guidance from mining distribution networks, where induction motors are most of the load, reports the contribution decaying to zero within 3 to 10 cycles, which is 60 to 200 ms at 50 Hz. For the magnitude of the current as it falls, an induction motor contribution decay analysis over five cycles covers the shape of the decay; the duration you enter in a study is a decision, not a number any of these sources hands you.
Why the arc makes the contribution decay faster #
Split the event into two stages. Stage one runs from arc initiation until the upstream protective device clears. The source sustains the arc, and the motor contribution is driven mainly by the difference between the motor's back EMF and the arc's voltage drop, a smaller driving voltage than a bolted fault presents. Stage two begins when the upstream device disconnects the source. Only motors still connected on the fault side can feed the arc, and they push current through the arc resistance, which adds impedance to their loop and pulls the current down faster than a bolt would.
The direction is certain; the size is not. The actual duration depends on motor size and arc resistance, and no test or study has published a validated decay curve or multiplier for the arcing case. Use faster-than-bolted as a bound on direction, never as a number.
The two cases that bound the answer #
Since the decay cannot be pinned down, stop trying to pin it and bracket it instead.
Duration case. Take the minimum three-phase short-circuit current the source alone pushes through the upstream device, with every motor and generator contribution excluded, and read the device's operating time off its time-current curve at that current. That time is the arc duration for the study. Study packages that implement the IEEE 1584 method generally let you specify the current through the protective device separately from the current at the arc; confirm yours does, and record what you entered. Where the fault sits behind a transformer, what clearing time applies to a transformer secondary arc decides whose curve you read.
Energy case. Take the maximum available short-circuit current with the motors contributing at locked-rotor level, calculate the arcing current from that maximum bolted fault, and apply the duration from the first case. How large the motor part of that maximum should be is covered in which starting current to use for motor short-circuit contribution. IEEE Std 1584-2018, the IEEE Guide for Performing Arc-Flash Hazard Calculations, treats the arc current its model predicts as the average arc current over the arc's duration, one current paired with one time, so this pairing is the frame the guide already works in.
The pair brackets reality: decaying motors can only push the real current below the energy case, and no credible operation of that device is slower than the time its curve gives at the minimum source current. Duration multiplies straight into the result, which for ground faults is the same issue as should ground fault clearing time set arc flash incident energy: the worst case comes from the slowest credible clearing, never the fastest.
All of this is desk work. Gathering its inputs, meaning device settings, conductor lengths and nameplates, can mean opening panels, so de-energize, lock out and verify absence of voltage first under the site's program for NFPA 70E, 2024 edition, the standard for electrical safety in the workplace, and confirm how it applies with the authority having jurisdiction.
Worked example: the reference duration in cycles at 50 Hz and 60 Hz #
Inputs, with where each comes from:
- Reference duration for induction-motor contribution: 100 ms, the convention used in routine short-circuit studies and the point at which the 1970 bolted test stood at 18% of locked-rotor current.
- Reported decay-to-zero range for induction motors, from mining-network field guidance: 3 to 10 cycles, stated at 50 Hz.
- System frequency: 50 Hz as the guidance states it, and 60 Hz for the other common industrial frequency.
The rule, in words: one cycle lasts the reciprocal of the frequency, so milliseconds per cycle equals 1000 divided by the frequency in hertz, and the number of cycles in a given time equals that time divided by the period.
The arithmetic:
- At 50 Hz: 1000 / 50 = 20 ms per cycle, so the range runs 3 x 20 = 60 ms to 10 x 20 = 200 ms, and the reference covers 100 / 20 = 5 cycles.
- At 60 Hz: 1000 / 60 = 16.7 ms per cycle, so the range runs 3 x 16.7 = 50 ms to 10 x 16.7 = 167 ms, and the reference covers 100 / 16.7 = 6 cycles.
- Current still flowing at the end of the reference in the bolted test: 0.18 x locked-rotor current, and still falling.
Result: the reference duration sits inside the reported band at both frequencies, five cycles at 50 Hz and six at 60 Hz, and reaches only half the slow end of that band, the 200 ms at 50 Hz.
Decision: keep the reference duration as the number you enter where software demands a single value for induction-motor contribution, and do not stretch it toward the slow end, because that end describes bolted faults and the arc's added resistance only accelerates the decay. The threshold to watch is the upstream clearing time. If the device clears in 100 ms or less, source and motor current overlap for the whole event and the two study cases already bound the answer. If it clears slower, check stage two, meaning whether any motors remain connected on the fault side of that device, before accepting the result.
When the number actually matters #
One configuration justifies real effort on the duration: a slow upstream device with a large motor group electrically on the fault side of it, so stage two carries meaningful energy. There the defensible route is a transient study, and it needs more than the horsepower-based complex-impedance or sequence-impedance models screening studies use, because those give a credible first-cycle magnitude but no decay. A dynamic model needs motor loading (the 1970 machines were unloaded, and the literature does not quantify how preloading changes the decay), motor inductance and the electrical parameters used in drive design, arc resistance, and the network topology before and after the device operates.
Verification is topological. List which motors can reach the fault in each state of the one-line, confirm the minimum-current duration case against the maximum-current energy case, and write the currents, the excluded contributions, the device operating point and the resulting duration into the study report. If those two cases do not envelope a configuration the plant actually runs, such as a bus tie closed or a generator in parallel, add a documented case rather than bending the reference duration.
Questions asked
Do motors running on VFDs contribute to the arcing fault?
Standard study practice excludes them. A drive with a diode front end does not pass sustained reverse current, so its motor cannot keep feeding the fault; at most a brief transient flows through the converter diodes. The motors you count in the contribution are the across-the-line machines. Treat any active-front-end drive as its own case and confirm against that drive's documentation.
Does a synchronous motor decay like an induction motor?
No. A synchronous machine's contribution is backed by externally supplied field excitation, not just the energy stored in its air-gap flux, so it can sustain fault current far longer than an induction machine. Model synchronous motors with their own decay and excitation response, and never apply the induction reference to them. The published test behind the reference duration used induction machines only.
Is the two-case method an IEEE 1584 requirement?
No. IEEE Std 1584-2018 is a guide: it provides the incident-energy and boundary model but prescribes neither a motor-contribution decay time nor the minimum-current and maximum-current split. The split is a conservative study choice, so record it as a stated assumption and agree the approach with the authority having jurisdiction and the site's electrical safety program.
How long can a calculated arc duration run?
IEEE 1584 guidance treats 2 seconds as roughly the time most people need to move away from an arc, and studies cap the duration there only where escape is physically possible. A worker boxed in at the equipment gets no such cap; the full clearing time stands. For motor contribution this rarely binds, because the decay question lives in the first tenths of a second.