Short answer

An arc-flash study can report a device's full time-current curve time — about 12 s here — because study mode does not apply the 51V voltage-restraint shift that the coordination study shows at about 2.2 s. Confirm the retained voltage at the relay and the current through it, then enter the verified time manually.

On this page
  1. Why the arc-flash run picks the full curve
  2. What the voltage-restrained element actually does
  3. Judge each relay on its own current
  4. The retained-voltage check, worked through
  5. Enter the verified time, and record both numbers
  6. Questions asked

If the coordination study clears the fault in about 2.2 seconds through the voltage-restrained curve while the arc-flash run reports about 12 seconds, the study software is reading the 51V element's full time-current curve at the arcing current and is not applying the voltage-restraint shift. That is a study-mode behavior, not evidence that the CTs, PTs, settings or breaker interlocks are wrong. The short time becomes the number you carry only after two checks pass: the retained voltage at the relay's PT actually reaches the restraint range, and each relay is judged on the current through its own CTs rather than the bus total. This article runs both checks with the arithmetic shown and gives the decision for each outcome.

Why the arc-flash run picks the full curve #

IEEE 1584-2018, the guide for performing arc-flash hazard calculations, takes its time input from the protective device that carries the arcing current: the clearing time of that device at the arcing current determines how long the arc burns and therefore the incident energy. Study software automates that step by reading the device's time-current characteristic at the arcing current and reporting what it finds there.

In the case behind this question, that lookup landed on the element's full-voltage curve and returned about 12 seconds, while the same fault in the protection and coordination run operated the 51V element on its restrained curve in about 2.2 seconds. The arc-flash mode did not model the restraint, so it read the slower curve. The discrepancy runs in the safe direction — a longer clearing time yields a higher incident-energy result than the relay would actually deliver — which makes the output conservative but not correct. It overstates PPE and approach boundaries on a bus where the restraint demonstrably operates, and it keeps doing so until the restrained time is verified and entered deliberately. The behavior was reported in ETAP; packages differ in how they treat voltage restraint, so establish what your package and version do before trusting either number.

What the voltage-restrained element actually does #

A 51V element is an overcurrent element whose characteristic is a function of measured voltage. Between the restraint voltage points programmed in the relay, the operating curve shifts from the full-voltage curve toward the most sensitive curve. The second curve on the coordination plot for the same relay is that shifted characteristic, not a different device. At nominal voltage the element sits on the top curve and behaves like an ordinary phase-overcurrent pickup; when the measured voltage falls far enough, it runs on the shifted curve and trips materially sooner.

Which curve applies is decided by the voltage at the relay's PT during the arcing fault. If that voltage never falls into the restraint range, the full curve governs, the long clearing time is the correct result, and no manual entry is justified. If it does, the restrained curve governs and the coordination result is the real clearing time.

One identification point from the reported case: the 51V element lives in the G30 relays on the generator breakers. The device labeled Multilin-750 on the utility-side breaker 52GM is a different relay, and its curve is not the one to shift.

Judge each relay on its own current #

The coordination numbers describe one branch: about 2.89 kA bolted and about 2.78 kA arcing through a generator relay. The bus total of 15.067 kA sums every source at the bus — three machines, the utility tie and the motor loads. These are different quantities answering different questions. Breaker 52GM clears the utility-side contribution; each generator breaker clears its own machine. A relay's curve is read only at the current through its own CTs, so the bus total never sets any single relay's operating point, and the gap between the branch arcing current and the bus total is not, by itself, evidence about voltage collapse.

Generator contributions decay after the first cycles, and the study has to carry that decay into both the current the relay sees and the time it needs; the method is set out in handling generator fault-current decay in arc-flash studies. A decrement curve alone is still not a relay curve — the protection study reads the element characteristic at each operating point, the gap explained in why a generator decrement curve misses the protection curve. Motor contributions lift the bus total without passing through these generator relays, and a drive-fed motor that reaches the bus through a bypass contactor contributes upstream; the mechanism is covered in how a VFD bypass permits motor fault contribution upstream.

Quantity in the reported case Value What it decides
Bolted fault current, generator branch 2.89 kA Fixes the branch impedance for the Thevenin calculation
Arcing current through that branch 2.78 kA Sets the retained-voltage result
Bus arcing current, all sources combined 15.067 kA Bus duty and total energy, never a single relay's operating point
Coordination result on the restrained curve about 2.2 s The candidate clearing time, pending verification
Arc-flash result on the full curve about 12 s The conservative software output, documented alongside

The retained-voltage check, worked through #

Reduce the network seen from the relay's PT point to a Thevenin source and impedance, including the upstream impedance transformed through the tie transformer, and carry resistance and reactance as complex values where you have them. The retained voltage at the PT is then:

V_bus = V_Thevenin − I_arc × Z_Thevenin

with I_arc the arcing current flowing through the branch you reduced, and Z_Thevenin the impedance between that source and the PT point.

Worked example, with declared illustrative inputs: a 480 V three-phase 60 Hz bus, the PT on the bus, and the branch values from the case above.

  • Line-to-neutral source voltage: 480 V / 1.732 = 277 V.
  • Branch Thevenin impedance: 277 V / 2890 A = 0.0958 ohms per phase.
  • Drop across that impedance at the arcing current: 2780 A × 0.0958 ohms = 266 V.
  • Retained voltage at the PT: 277 V − 266 V = 11 V, which is 11 / 277 = about 4 percent of nominal.

The same answer falls out of a one-line identity: the retained fraction equals one minus the ratio of the arcing current to the bolted current on that branch, so the percentage does not depend on the voltage level — only the absolute volts change.

Decision: 11 V on a 480 V bus sits well below the low-voltage floor of a normally set restraint characteristic, so the element is pinned at its most sensitive curve and the restrained curve governs the clearing time. Where these branch values and PT location apply, the verified clearing time is the coordination result, about 2.2 seconds, and that is the number to enter. If the PT connects elsewhere — behind a tie breaker, on the machine terminals — recompute with that branch's bolted and arcing currents; the fraction, not the volts, decides, and the comparison against the element's lowest defined voltage point settles which curve applies.

Enter the verified time, and record both numbers #

With the checks done, the entry is mechanical:

  1. Rerun the coordination case at the arcing-fault condition and confirm each generator relay operates through its 51V element; note the time and the current through that relay's CTs.
  2. Compute the retained voltage for each relay's PT location as above and compare it with that relay's restraint characteristic.
  3. Enter the verified time as the clearing time for that device in the arc-flash run, using the package's manual clearing-time override, and rerun the incident-energy calculation.
  4. Keep both numbers in the report — the conservative curve-based result and the verified value — with the basis: the coordination plot, the restraint settings and PT location, the Thevenin arithmetic, the software version and the study revision.

The behavior reported here was seen in ETAP, so record what your package and version do with restraint; a study handed between teams should carry that limitation in its documentation, the same discipline behind scoping an outsourced arc flash study you can maintain in ETAP.

Two reference points frame the number. IEEE 1584-2018 ordinarily assumes an arc lasts no more than 2 seconds, on the basis that a worker moves away from the arc; where a worker cannot reasonably move away, the actual protective device time applies even though it exceeds that assumption, so the verified time stands in the calculation rather than an optimistic 2-second cap. NFPA 70E, 2024 edition, covers the work-practice side: energized work at a labeled bus requires an incident-energy risk assessment, a label carrying that result, and PPE selected for it. Editions and local amendments differ — confirm the applicable requirements with the authority having jurisdiction and the equipment documentation.

One safety limit closes it: a shorter study number never authorizes energized work. De-energize and verify absence of voltage before anyone opens this switchgear, and where energized work is unavoidable, the labeled incident energy and NFPA 70E practice govern.

Questions asked

Why does the arc-flash mode read the full curve instead of the restrained one?

In the reported case, the software vendor's support confirmed that the arc-flash mode looks up the device time-current characteristic at the arcing current and does not shift a voltage-restrained element for measured voltage; the coordination study applies that shift. Their guidance was to validate the restrained operating time in the coordination run and enter it manually, which is exactly the verification sequence in this article.

What if the retained voltage lands above the restraint range?

Then the element never leaves the full-voltage curve, the long clearing time is the correct physical result, and the manual entry must not be made. The fix is a protection review, not a study edit: lower the pickup, add a fast element, or add arc-flash maintenance switching, and let the study republish the label from the devices as they will actually operate.

Does the 4 percent retained-voltage result change at medium voltage?

No. The retained fraction is one minus the arcing-to-bolted current ratio on the branch, so the voltage level cancels. On a 4.16 kV bus with the same branch currents, the line-to-neutral source is about 2400 V and the retained voltage about 91 V — the same 4 percent — so the restrained curve governs at either voltage.

What belongs in the study file when a manual clearing time is used?

Enough for the next reviewer to reproduce it: the coordination plot showing the restrained operating point, the relay's restraint settings and PT location, the Thevenin arithmetic with its inputs, the software version and the study-mode limitation, and the revision note tying the label to the verified value. Without that record, the next study run regenerates the conservative curve time and the label changes for no engineering reason.

Keep reading

  • Explainer

    How an overdutied breaker changes your arc flash study results

    A 25 kA breaker with 32 kA available fails the interrupting-rating requirement of NEC 110.9, but it voids an arc-flash result only where that result credits the breaker with clearing the modeled arcing current. In that case, take the clearing time from the next upstream device, rescale the incident energy, relabel, and replace the breaker.

    Electrical safety and codes

  • Troubleshooting

    Checking a delta high leg arc flash calculation's numbers

    The 9.127 kA at the panelboard checks out against the 11.33 kA infinite-source terminal limit once utility impedance is counted. The 73 cal/cm² hinges on clearing time: the referred bolted current clears the 600 A primary breaker in 0.033 s, but IEEE 1584 sets device time from the arcing current, which falls below the 3,600 A pickup into the thermal band — so the label is credible until the study file shows otherwise.

    Electrical safety and codes

  • Explainer

    Segmenting a long busway for arc flash studies

    Segment a tapped busway into one model bus per tap with the published section impedance between taps. Bolted fault current drops along the run, and the lower arcing current can push an upstream breaker into a slower clearing band, raising incident energy at interior taps an endpoint-only model never checks. Sample head end, middle and far end first, then label the whole run at the highest calculated value.

    Electrical safety and codes