Short answer

An autotransformer starter output must be measured line to line on all three pairs during the start and checked against the tap fraction times the simultaneous input voltage: 0.80 × 210 V = 168 V. A 175 V reading is 83.3 percent of that input, so verify the tap links and all three pairs; about 90 V to ground says nothing, because the secondary sits offset from ground. Then isolate fuses, contactor poles, terminations, motor windings, transition timing and start frequency.

On this page
  1. Why does about 90 V to ground prove nothing on the tap?
  2. What output voltage should an 80 percent tap deliver?
  3. Do the input readings clear the supply?
  4. How do you measure the starter output properly?
  5. Where do you hunt when one output pair is low or dead?
  6. When should the starter transition to full voltage?
  7. How many starts per hour can the starter take?
  8. What condemns the transformer itself?
  9. Questions asked

Measure the autotransformer starter output line to line, on all three pairs, during the start, and compare each pair with the tap fraction times the input voltage captured at the same instant. A phase-to-ground reading on the secondary is not a tap test, because the secondary sits offset from ground on two of its three phases. On a 208 V system with an 80 percent tap, the expected motor voltage is 168 V; one output pair reading slightly high neither clears nor condemns the starter until all three pairs and all three currents are on record. Below are the arithmetic, the measurement procedure and the isolation order for the fuses, contactor poles, terminations, motor windings, transition timer and start frequency.

Why does about 90 V to ground prove nothing on the tap? #

An autotransformer secondary does not sit symmetrically around ground: two of the three output phases ride offset from it, so the roughly 90 V you measured to ground is not the tap fraction of anything and cannot test the transformer. Only the potential difference between output lines reflects the tap ratio. Ground-referenced readings on the input side are equally weak evidence, because a healthy-looking line-to-ground value does not show whether all three phase paths carry current under load.

What output voltage should an 80 percent tap deliver? #

The expected motor voltage is the tap fraction times the input voltage at the same instant: on this starter, with an 80 percent tap and a 210 V input during the start, that is 0.80 × 210 V = 168 V line to line. Motor current on the tap falls roughly with the tap fraction, while supply-line current and starting torque fall roughly with its square; the starting kVA on an 80 percent tap works through that side of the calculation.

The arithmetic for this starter #

The measured secondary, 175 V on one pair, gives an observed ratio of 175 ÷ 210 = 0.833, or 83.3 percent. Using the pre-start input of 212 V instead would give 0.80 × 212 V = 169.6 V, but the reading taken during the start is the correct comparison. A tapped winding cannot produce more than its ratio of the voltage across it at a given instant, so a reading above nominal points at capture timing (input and output not read at the same moment while current is falling), tap links on a different position than the label suggests, or a slow-responding meter — not yet at a defective transformer.

Do the input readings clear the supply? #

Yes, mostly: the line-to-line input moved only from 212 V before the start to 210 V during it, a 2 V dip, so an upstream voltage collapse is not the leading cause of the single-phasing sound. A sag severe enough to damage this starter class leaves a much deeper signature, which is the failure mode behind why an autotransformer starter fails after a voltage sag. Here the supply held, so the lost phase is downstream of the meter.

Reading on this starter What it tells you Next check
212 V before the start, 210 V during it Only a 2 V line-to-line dip; upstream collapse is not the leading cause Record all three incoming pairs, not one
118 V to ground before, 116 V during Ground-referenced input readings moved 2 V but prove nothing about phase balance under load Line-to-line voltage and current on every leg
About 90 V from secondary to ground Ground is the wrong reference; two output phases ride offset from it Discard as a tap test; measure output line to line
About 175 V on one output pair Reduced three-phase voltage is present on at least that pair; imbalance unknown Capture all three output pairs in the same start
Motor hums as if single phasing Open fuse, burned contactor pole, loose termination, cable fault, winding fault or a stalled tap Per-phase voltage and current through each section
Opposite winding groups equally blackened Localized single-phase heating, not uniform overload Winding resistance and insulation resistance, then find the open phase

How do you measure the starter output properly? #

Measure all three motor-side line-to-line pairs during the same start, with a true-RMS meter or recorder that captures minimum values, and compare each pair with the tap fraction times the input voltage at that instant. De-energize the starter, apply lockout, and test for absence of voltage before opening the panel or touching any termination; NFPA 70E, 2024 edition, which covers electrical safety in the workplace, sets the PPE and approach boundaries for any measurement made energized, so confirm both with your site's safety procedure.

  1. Read the motor nameplate, starter schematic and transformer tap markings. These motors were described as 230 V on a 208 V system; resolve that mismatch at the equipment before any reading means anything.
  2. With power off, inspect fuses and holders, lugs, cable terminations, contactor poles and transformer links for discoloration, looseness, cracked insulation and unequal contact wear.
  3. Record the three incoming line-to-line pairs before the start, then again during acceleration.
  4. During the same reduced-voltage interval, record the three output pairs; the interval may last only seconds, so use minimum capture or a recorder.
  5. Clamp all three motor leads while the motor is on the tap, and again after transition to full voltage.
  6. Watch the contactor sequence: every pole must close in its intended stage, transition must have no missing phase and no long dead interval, and the run contactors must land cleanly.

Where do you hunt when one output pair is low or dead? #

Work from the motor back toward the supply: motor terminals and winding continuity, cable continuity and terminations, output contactor poles, transformer links and windings, input contactors, then fuses and fuse-holder contact resistance.

  • A large current imbalance with nearly balanced voltage points at connections or the motor windings.
  • A voltage imbalance at the output with balanced input points at the starter itself: a fuse, a contactor pole or a transformer link.
  • Pull and continuity-test each fuse out of its holder, then check the holder's grip and contact faces, which lose pressure and overheat after repeated faults.
  • Opposite winding groups equally blackened while the rest stayed copper-colored is localized single-phase heating: measure winding resistance phase to phase and insulation resistance with an insulation tester, and compare the three phases; the mismatch between phases, not the absolute value, is the condemn test.

When should the starter transition to full voltage? #

Transition at the moment the motor stops accelerating on the tap: if speed hangs at an intermediate value, shorten the timer, because every extra second on the transformer adds heat to the windings and eats the overload relay's thermal capacity without adding acceleration. If the motor will not get near full speed on the tap, do not extend the timer — fix the cause, whether that is a tap too low for the breakaway torque, excess mechanical load, low line voltage or a missing phase. A field rule for this starter class treats more than about 15 s on the transformer as a heating risk, and pump duty commonly transitions within 5 s; both are field figures to verify against the starter's marked duty and the actual acceleration trace, not substitutes for them.

How many starts per hour can the starter take? #

The transformer sets the duty, not the motor: common autotransformer starters are built to make about two starts per hour, three at most, and a night of repeated stop-start cycling can overheat the windings long before the overload relay notices. The transformer is energized only during the reduced-voltage interval, so start frequency and time on the tap together set its thermal duty. NEMA's published MG 1 frequently asked questions answer the question of how often a motor should be brought to full speed with two cold starts or one hot start per hour; ANSI/NEMA MG 1-2021 is the standard covering motors and generators, and the starter's own marked starting duty governs — confirm both against the equipment documentation and your local authority having jurisdiction. A thermal cutout embedded in or near the windings trips after the damage is largely done, so treat it as a last line, not as permission to cycle the starter.

What condemns the transformer itself? #

A tripped or open thermal cutout proves the windings got hot, not that the insulation failed: condemn the transformer only on an open winding, a winding-to-core fault, or a resistance mismatch between phases measured after it has cooled. With the starter isolated, compare the three phase winding resistances and run insulation resistance from windings to core; matched resistances and a sound insulation reading mean the transformer survived, and the start frequency or the transition timer is what you fix.

Questions asked

Why did the second motor smell hot when it kept running?

A motor that kept running through the utility phase loss pushed unbalanced current through whatever path remained, and opposite winding groups blackened equally is the localized heating pattern that leaves. A motor can survive one such event with shortened insulation life, so record its winding resistance and insulation resistance now and trend those readings at the next outage.

Can a tap read above its ratio?

A tapped winding cannot deliver more than its ratio of the voltage across it at the same instant; a reading like 175 V on an 80 percent tap usually means the input and output were not captured at the same moment while current was falling, or the links sit on a different tap than the label implies. Capture every pair in one start, with one instrument, before blaming the transformer.

What instrument do you need for the output test?

A true-RMS meter with minimum-value capture is the minimum; better is a three-phase power recorder or logging meter that captures all three voltage pairs and all three currents against time, because the reduced-voltage interval may last only seconds and the telling values sit at transition. Set the instrument to record the whole start rather than spot readings.

Is the single-phasing sound enough to condemn the starter?

No. Hum, slow acceleration and heat also come from a tap set too low for the breakaway torque, an over-long transition timer, low line voltage or a mechanical overload. Only per-phase voltage and current through each circuit section separate an open phase from a stalled motor; the sound tells you where to put the meter, nothing more.

Keep reading

  • Explainer

    Autotransformer starter starting kVA at 80 percent tap

    At an 80% tap, an autotransformer starter draws about 64% of the motor's full-voltage locked-rotor kVA from the supply. With locked-rotor current between 5.5 and 9 times full-load current, that is roughly 3.5 to 5.8 times running kVA, so a flat 4× multiplier is plausible but not a safe upper bound. Electrical frequency stays at the supply frequency for the whole start.

    Motors and motor starters

  • Selection guide

    Specifying soft starters for high-inertia blowers without curves

    Torque, not kilowatts, decides the start: at a 400% current limit on a motor with 800% locked-rotor current, torque falls to about 25% of DOL and a 15 s blower start stretches to four times that or stalls. Close the dampers, hold the limit near the square root of the load-torque fraction times the measured inrush (about 500% of full-load current here), buy duty to cover it, or specify a drive.

    Motors and motor starters

  • Troubleshooting

    Troubleshooting a line side fault on a soft starter

    A line side fault reports the three-phase supply arriving at the starter's line terminals: missing, unbalanced, or outside nameplate range. Measure all three line-to-line pairs at the terminals at rest and during the start before touching the starter — most of these faults are a lost phase, blown fuse, loose termination, or start-time voltage drop upstream.

    Motors and motor starters