How to fuse a dual-output 115/230 V transformer secondary

Control power: 24 V DC, UPS and transformers Published 6 min read

Short answer

The two loads total 2,415 VA, so the 2 kVA transformer is undersized: fit a 3 kVA unit and fuse the secondary leads at 125 percent of the current each actually carries — 15 A in the shared X1 lead, 10 A in X4. Bond the X2–X3 junction, never fuse the grounded lead, and apply the NFPA 70 (National Electrical Code), 2023 edition, Article 450.3(B) percentages.

On this page
  1. What each secondary lead carries
  2. The fuse sizing rule
  3. Worked example: 5 A and 8 A simultaneous loads
  4. Steps to install the fuses
  5. Primary fuse and inrush
  6. Questions asked

Both outputs come from one secondary winding on this transformer, so the fusing question starts with the load total, not with the fuse catalog. The two loads add to 2,415 VA, which the 2 kVA nameplate cannot carry: fit a 3 kVA unit, put a 15 A fuse in the shared X1 lead and a 10 A fuse in the X4 lead, and bond the X2–X3 junction. The X1 lead carries both load currents at once, so it decides how big the transformer must be. Article 450.3(B) of NFPA 70, the National Electrical Code, 2023 edition, caps transformer secondary protection at a set percentage of rated secondary current; the worked example below turns that percentage into fuse ratings for this wiring.

What each secondary lead carries #

You already have the connection: X2 jumpered to X3, the lower-voltage output read from X1 to X2, the full-secondary output from X1 to X4. Follow the current, not just the voltages. The larger load's current leaves X1, passes through both winding sections in series, and returns at X4. The smaller load's current leaves X1 and returns into the X2–X3 junction. The X1-to-X2 section therefore carries both loads at once, and so do the X1 lead and the X2–X3 jumper, while the X3–X4 section carries only the larger load's return. One fuse sized for a single output cannot protect the transformer by itself; the section carrying the combined current sets the minimum transformer size.

The fuse sizing rule #

For transformers 1,000 V and under, Article 450.3(B) allows secondary overcurrent protection at up to 125 percent of rated secondary current, and where that does not match a standard fuse rating the next standard rating up is permitted; below 9 A of rated secondary current the ceiling is 167 percent. Placement follows: fuse only the ungrounded secondary leads — X1 and X4 in this wiring — never the grounded conductor, and bond the X2–X3 junction to the grounding system. Whether that junction should be grounded or left floating is its own decision, covered in grounded versus floating control transformer secondaries in MCCs. If the secondary conductors leave the transformer enclosure for a remote panel ahead of the first fuse, the length and ampacity conditions in when transformer secondary conductors count as taps decide whether that run is allowed. Editions and local amendments differ, so confirm the final ratings with your authority having jurisdiction and the transformer's instruction sheet.

Worked example: 5 A and 8 A simultaneous loads #

Inputs: a 2 kVA single-phase transformer in hand; simultaneous loads of 5 A at 115 V and 8 A at 230 V, essentially resistive, taken from the case at hand; a 3 kVA replacement with the same split secondary; the secondary percentage rule from Article 450.3(B).

Rule in words: each output's apparent power is its voltage times its current; simultaneous outputs add; a nameplate passes only if the total fits and no winding section exceeds its rated current.

Arithmetic:

  • 115 V × 5 A = 575 VA
  • 230 V × 8 A = 1,840 VA
  • 575 VA + 1,840 VA = 2,415 VA, above the 2,000 VA nameplate — the existing unit fails the load total.
  • X4 carries 8 A; the shared X1 lead carries 5 A + 8 A = 13 A.
  • Rated secondary current of the 3 kVA unit: 3,000 VA ÷ 230 V = 13.0 A; the two series sections are built to carry that current, so the loaded section runs at 100 percent of rating — acceptable, at the limit.
  • The shared lead sets the floor too: its current times the full secondary voltage is about 2,990 VA, so a 2.5 kVA nameplate would pass the load-sum check yet fail here; that replacement size is the first standard rating that clears it.
  • X1 fuse: 125 percent of rated secondary current is 16.3 A; fit a 15 A time-delay fuse, and 20 A is the largest rating the next-size-up allowance permits.
  • X4 fuse: 125 percent of 8 A = 10 A; fit a 10 A time-delay fuse.
  • Smaller output's branch fuse: 125 percent of 5 A = 6.25 A; a 6 A standard rating does not exceed it — fit 6 A on small control-conductor branches.
  • Utilization: 2,415 VA ÷ 3,000 VA = 80.5 percent of nameplate, a comfortable margin.

Decision: do not commission both loads on the existing unit — past the load total, the shared section would run half again beyond its 8.7 A rating (nameplate VA over the full secondary voltage), and the fuse matched to that smaller nameplate would open in normal service, which is the protection working, not a bad fuse. Commission the replacement unit with the fuse ratings above, time-delay (dual-element) types in the secondary leads so the sustained load carries without nuisance opening.

Steps to install the fuses #

  1. Confirm from nameplates or a clamp-meter reading that the two stated currents are the true maximum simultaneous loads; size from the largest current each output can draw, not from an average.
  2. De-energize the primary, lock out and tag, and test for absence of voltage at both primary and secondary terminals before opening the transformer compartment or any load panel.
  3. Verify each terminal's identity against the transformer's own diagram — jumper position and winding ends — before landing a conductor; a reversed section can cancel an output or stack the voltages wrongly.
  4. Fit the 3 kVA transformer, and read its instruction sheet for the per-section current rating and any temperature or altitude derating before finalizing fuse sizes.
  5. Install a 15 A time-delay fuse in the X1 lead and a 10 A time-delay fuse in the X4 lead; add a 6 A fuse in the smaller output's branch where the conductors are small control wire.
  6. Bond the X2–X3 junction to the grounding system with a conductor sized for the full shared current, and keep every fuse out of that grounded path.
  7. Re-energize with the loads disconnected and measure both output voltages against the nameplate; if either is wrong, de-energize and recheck the jumper and terminations rather than troubleshooting live.
  8. Connect the loads, then measure each output current and the shared-lead current at full simultaneous load; every reading must stay inside the documented winding and lead ratings, and nothing should open at normal load.

Primary fuse and inrush #

Replacing the transformer changes the primary device as well: primary full-load current is nameplate VA divided by primary voltage, and the 250 percent column of Article 450.3(B) sets the ceiling for the new fuse or breaker — recompute it from the new nameplate, not the old one. Energizing a transformer also draws magnetization inrush that can open a marginal primary device even with correct steady-state sizing; the causes and primary-side fixes are covered in stopping breaker trips on 25 kVA transformer inrush.

Questions asked

Can the 2 kVA transformer stay if the loads never overlap?

Only with a hard electrical or mechanical interlock that makes coincidence impossible, not an operating assumption. The larger single load is 1,840 VA, which fits the 2 kVA nameplate with margin, and its current stays below the winding rating. If anything can defeat the interlock — maintenance, a bypass switch, a load added later — the undersize returns, and the upsize decision stands.

Why must the X1 fuse be larger than either output's load?

X1 feeds both outputs at once, so it carries the sum of the two load currents whenever both run. A fuse picked for one output alone opens on normal operation and drops both loads together. Size it from the transformer's rated secondary current instead, and treat repeated opening at moderate load as a sign the transformer itself is undersized, not that the fuse is wrong.

Can I fuse the X2–X3 jumper instead of the hot leads?

No. Once that junction is bonded it is the grounded current-carrying conductor, and a fuse there puts the protection in the grounded path. If it opens under load, the midpoint floats and one half of the system can rise toward the full 230 V while its loads are rated 115 V. Fuses belong in X1 and X4 only.

Does the primary protection change when the transformer is upsized?

Yes, and the old device will usually be undersized. Primary full-load current is nameplate VA divided by primary voltage; if the primary is 480 V, for example, the replacement draws about 6.25 A, and the 250 percent column of Article 450.3(B) sets the ceiling — about a 15 A device on that primary. Confirm the final choice with your authority having jurisdiction.

Keep reading

  • Troubleshooting

    Why a control transformer secondary shows voltage to ground

    The 42 V that climbs to 76 V as loads start and jumps to 131 V on the start button is capacitive coupling through a floating control transformer secondary, read by a 10 MΩ meter — not coil current. Meter across the coil and across X2-XF: about 0 V across the coil stopped and a steady nominal voltage across X2-XF means the circuit is healthy. Then the schematic decides whether X2's designed bond is open or the secondary runs floating.

    Control power: 24 V DC, UPS and transformers

  • Troubleshooting

    Sizing a step-down transformer for a 110 V UPS

    Size the transformer at 1.25 times the UPS VA rating: 625 VA minimum for a 500 VA UPS, so 750 VA is the practical choice. If breaker trips survive a transformer and UPS swap, the cause is the wiring between the two-wire 110 V secondary and the three-pin UPS plug, not the VA rating.

    Control power: 24 V DC, UPS and transformers

  • Explainer

    Converting a 350 kVA soft start limit to starting current

    A 350 kVA soft start limit is about 421 A of line current at 480 V: divide 350,000 VA by √3 × 480 V. The figure is apparent power, so no power factor enters the conversion, and it carries no duration — that comes from the torque-speed margin. The 12.5 kV fuse is a coordination problem; motor protection belongs at 480 V.

    Motors and motor starters