Explainer
Treat arc-resistant MCC exhaust as a gas ignition source
Short answer
Treat the exhaust outlet of an arc-resistant MCC as a competent ignition source: arc byproducts leave the plenum far hotter than the 450 °C T1 ceiling that covers methane and most hydrocarbon gases. IEEE C37.20.7-2024 type-tests the gear with its documented plenum and venting; it does not classify the area where the discharge lands. Put the termination outside the classified boundaries, use the manufacturer's documented plenum or chimney, and hold release until the manufacturer confirms that exact configuration in writing.

On this page
During an internal arcing fault, an arc-resistant MCC vents hot ionized gas, copper vapor and molten metal droplets through its plenum to a discharge point you choose at design time. Treat that discharge point as a competent ignition source for combustible gas. The byproducts leave the vent hundreds of degrees above the autoignition temperatures of common hydrocarbons, and the arc-resistant rating does nothing to cool them: IEEE C37.20.7-2024 proves how the enclosure protects a person standing at the gear, not what the plume does where it lands. The decision: locate the vent termination outside the classified boundaries on your area classification drawings, route it with the gear manufacturer's documented plenum or chimney accessories only, and hold design release until that manufacturer confirms your exact routing in writing. Confirm the classified-area requirements with your authority having jurisdiction and the gear documentation before construction.
What leaves the plenum during an arcing fault #
The vent exists because an internal arc cannot be contained: pressure relief is how arc-resistant construction keeps the enclosure intact, so the design deliberately ejects what the fault produces. That stream is superheated ionized gas, copper vapor and molten copper droplets. Copper melts at about 1085 °C, and the arc core runs thousands of degrees above that.
Set those temperatures against the gas side. NFPA 70, the National Electrical Code, 2023 edition, assigns Class I gases temperature classes in Table 500.8(D), and T1 — the least severe class and the one methane and most oil-and-gas hydrocarbons fall under — caps permissible surface temperature at 450 °C. Published ignition tables put methane's autoignition temperature near 537 °C. The comparison, using material data and the code table:
- 1085 − 537 = 548 °C: even a copper droplet that has already resolidified sits 548 °C above methane's autoignition temperature.
- 1085 − 450 = 635 °C: the same droplet exceeds the T1 surface ceiling by 635 °C, and the gas fraction of the plume runs thousands of degrees above both.
This is an illustrative comparison of documented numbers, not a plume-temperature calculation; the governing check is separation from flammable mixture. How long the discharge lasts is set by the upstream protective device — the article on which breaker sets the arc flash duration shows how to pin that clearing time down. The logic matches the hot-surface rules that govern hot piping, autoignition temperature and ignition risk in classified areas: the discharge exceeds the temperature-class ceiling by hundreds of degrees, so temperature can never be the defense. Separation is.
What the arc-resistant rating proves, and what it does not #
IEEE C37.20.7-2024 is the internal-arc test standard behind the arc-resistant rating. It defines the procedures for testing metal-enclosed switchgear under an internal arcing fault and the criteria used to judge the result, and manufacturers apply it across low- and medium-voltage arc-resistant assemblies — the rating on your MCC comes from that family of type tests.
Three things the rating gives you:
- Enclosure performance: in a passing test, doors and covers stay secured, the enclosure stays intact, and the indicator cloth outside the vent zones does not ignite.
- A tested venting arrangement: the type test runs with the gear as sold, including its plenum, ducts and terminations, so the venting is part of the rated design.
- A restricted-area philosophy: the standard assumes personnel are not permitted in the area of the pressure-relief vents while the gear is energized, and the installation instructions state how far back to keep people.
What it never gives you is an evaluation downstream of the vent. The test characterizes the discharge at the plenum outlet; it says nothing about where your building wall, shaft or process unit sits. And arc-resistant construction does not reduce the incident energy calculated at the gear — the page on arc-resistant ratings and calculated incident energy covers that — so design the routing as if an arc fault and its full plume are possible on day one, because they are.
Where the classified-area rules bite #
The ignition side of the question is governed by your area classification drawings, not by the MCC datasheet. NFPA 70, the National Electrical Code, 2023 edition, Article 500 covers hazardous (classified) locations: Class I areas are those where flammable gases or vapors are or may be present, Article 500.5 sets the Division 1/Division 2 and Zone boundaries, and Article 500.8 requires equipment installed there to be approved for that location, including its temperature class. Your MCC room is normally unclassified. The plenum termination is different: during a fault it emits arcs and surface temperatures beyond anything an approved device is permitted, so it must sit where no classified atmosphere can be present.
Those boundaries come from the facility's area classification drawings, on most US oil and gas sites developed under API RP 500's location-classification practice, or the IEC zone method where zones are used. Mark the termination on those drawings like any other permanent ignition source, and mind the direction: a horizontal discharge aimed at a compressor building can reach a boundary a vertical discharge never approaches. Confirm the division boundaries, the temperature-class assignment and the termination location with your authority having jurisdiction and the equipment documentation.
Only the documented plenum or chimney keeps the rating #
Gear manufacturers treat the plenum as part of the arc-resistant design rather than an add-on: their application guides describe it as the exhaust system required to channel every arc byproduct away from the gear, and they publish installation instructions for plenums, ducts and chimneys tested with specific assemblies. A shaft or chimney is therefore a real, manufactured option in several product lines — and nothing to improvise from sheet metal on site.
Request three documents from the gear manufacturer before release:
- The installation instruction covering your assembly's plenum or chimney, with allowable duct lengths, bends, penetrations and termination fittings.
- Written confirmation that your proposed routing — wall penetration, shaft, outdoor termination height and discharge direction — matches a tested configuration or is accepted by their engineering.
- The maximum run from gear to termination and any structural or clearance requirements the duct imposes.
An unapproved duct can redirect the pressure wave back into the room or void the rating entirely, so treat field-modified venting as untested gear. The compliance detail behind routing a plenum out through the building envelope — penetrations, termination classes, external venting rules — is laid out in the guide to arc-flash plenum duct external venting under IEC 62271-200.
The routing decision, case by case #
| Routing | What it does | Decision |
|---|---|---|
| Top discharge, no plenum | Leaves arc byproducts in the room or roof space | Reject: arc-resistant designs require the plenum, and a room discharge defeats the vent |
| Horizontal duct through the wall to an outdoor termination | Shortest path, discharge at low level near grade | Accept only if the termination clears every classified boundary on the drawings and the manufacturer confirms the duct in writing |
| Vertical shaft or chimney to a high termination | Lifts the discharge above grade-level releases | Accept only if the manufacturer's instructions cover the chimney for your assembly and the termination still clears the boundaries |
When process units and their potential releases sit at grade near the building, the chimney is the better default, because it moves the discharge away from where those mixtures are most likely to collect. It is not automatically better: check where the shaft termination lands relative to elevated vents, building air intakes and adjacent structures. In every arrangement the deciding documents are the same — the area classification drawing and the manufacturer's written acceptance. Direction alone never makes a termination safe.
Hold points before you release the design #
None of this changes the energized-work rules: any inspection inside the gear or the plenum happens with the equipment de-energized, locked out and verified dead before a door opens.
- Freeze the MCC selection and pull its plenum and chimney installation instructions from the gear manufacturer.
- Overlay the proposed termination point and discharge direction on the area classification drawings; reject any position inside a classified boundary.
- Submit the routing to the gear manufacturer and file the written acceptance of the configuration with the design package.
- Walk the authority having jurisdiction through the termination location and the classified-area reasoning before construction starts.
- At commissioning, verify the as-built venting matches the documented configuration before the gear is first energized.
Questions asked
Does an arc-resistant rating make it safe to stand near the vents?
No. IEEE C37.20.7 builds on a restricted-area philosophy: while the gear is energized, personnel are not permitted in the area of the pressure-relief vents, and the installation instructions give the clearances. The rating describes enclosure performance in the test, not a standing area for people. Keep the vent zone out of routine work positions and routing paths.
Can we connect our own ductwork to an arc-resistant MCC?
Only ducting the manufacturer documents for your assembly keeps the type-tested performance. A field-fabricated duct changes the pressure path the rating was verified with, and it can dump arc byproducts at a point nobody evaluated. Ask the gear manufacturer for the installation instruction covering your routing and a written acceptance of the configuration, and treat those documents as part of the MCC's rating.
What gas property actually decides the ignition risk?
Autoignition temperature and temperature class. Methane ignites near 537 °C and sits in temperature class T1, whose 450 °C ceiling is the highest surface temperature allowed on equipment in a Class I area. The plume and its molten metal run far above both. The other half of the question is mixture: whether the area classification drawings show a flammable atmosphere possible at the termination.
Who signs off on the exhaust arrangement?
Two reviews, both before design release. The gear manufacturer confirms in writing that your plenum, duct or chimney routing is covered by the tested configuration for that assembly. Your process safety or electrical engineering group confirms against the area classification drawings that the termination lies outside every classified boundary, and the authority having jurisdiction accepts the interpretation. File all three confirmations with the design package.