Short answer

The spread comes from the alternator, not the running load: a self-excited set with a single-phase peak-reading AVR must be sized to locked-rotor starting kVA (about 120% overload capability), while a PMG-excited set with a three-phase averaging AVR sustains roughly 300% during a start and can be sized near the running load. Quote a 50 kW PMG set with sequenced starts for this 44.5 hp lineup; 100 kW is needed only if the motors must start together on a self-excited set.

On this page
  1. The running load is the same in both quotes
  2. What each alternator can deliver into a locked rotor
  3. The start arithmetic both quotes rest on
  4. The three start cases, sized with each alternator
  5. A dip check you can run before trusting either quote
  6. Frequency dip and the engine side
  7. Make both vendors quote against the same sheet
  8. The decision
  9. Questions asked

Both quotes can be right, because the running load was never the question. What separates a 40 kW genset quote from a 100 kW one on the same 44.5 hp motor lineup is what each alternator can deliver into a locked rotor without collapsing. A self-excited alternator with a single-phase peak-reading regulator survives about 120% overload and must be sized to the locked-rotor kVA of the worst start. A permanent-magnet generator (PMG) excitation system with a three-phase averaging regulator sustains about 300% for the second or two a start lasts, so it can be sized near the running load. Sequence the starts and the gap closes from the other side too. Here is the arithmetic, the case table and the decision.

The running load is the same in both quotes #

The lineup is 208 V, three-phase, from 1.5 hp to 7.5 hp, started in three steps: step 1 is 7.5, 5, 5, 3 and 2 hp (22.5 hp); step 2 is 7.5, 5 and 2 hp (14.5 hp); step 3 is 3, 3 and 1.5 hp (7.5 hp). That is 44.5 hp connected. Shaft power is 44.5 × 0.746 = 33.2 kW, and with an assumed efficiency-times-power-factor product of 0.75 the running input is 33.2 ÷ 0.75 = 44.3 kVA, every motor fully loaded. That sits just under a 50 kVA alternator, so even the smaller quote carries little running margin — the disagreement is not about the running load. Replace the assumed 0.75 with the real product from each nameplate, the same data you use when setting overload relays from motor nameplate full-load current.

What each alternator can deliver into a locked rotor #

A self-excited alternator draws its field power from its own output. During a start the terminal voltage collapses, the field weakens with it, and the machine behaves as a current limiter with a typical maximum around 120% of rated current. The sizing consequence is blunt: the alternator's rated kVA must be at least the locked-rotor kVA divided by 1.2.

A permanent-magnet generator feeds the automatic voltage regulator (AVR) from magnets on the shaft, independent of terminal voltage, so excitation holds while the bus sags. The same alternator frame then sustains roughly 300% for the duration of a motor start, and the set can be sized much closer to the running load.

The regulator design is the second half of the gap. Single-phase (often two-phase) peak-reading half-wave AVRs respond slowly and are prone to instability through step changes such as motor starts; a three-phase averaging AVR handles them far better. When a PMG machine's regulator still misbehaves, it usually traces to the SCR firing stage: the walkthrough of AVR SCR misfiring in PMG-excited generator systems shows that failure mode and its remedy.

Treat 120% and 300% as the typical multipliers the quotes assume, not as a datasheet. Ask for the alternator's published motor-starting capability, and check the alternator datasheet itself rather than the genset label alone — an alternator relabel that caused a genset overload is exactly the trap that hides there.

The start arithmetic both quotes rest on #

Locked-rotor kVA comes from each motor's nameplate: locked-rotor amperes if listed, otherwise the code letter, which the locked-rotor table of NFPA 70, the National Electrical Code, 2023 edition, Article 430, converts to kVA per hp — confirm the table's use with the local authority having jurisdiction and the equipment documentation. As a first pass, 6 kVA per hp is a fair assumption: most general-purpose designs carry a code letter near G, roughly 5.6 to 6.3 kVA per hp.

The site limits are a maximum voltage dip of 35% and a maximum frequency dip of 6 Hz. At a 35% dip the motor sits at 65% voltage, and torque falls with the square of voltage: 0.65 × 0.65 = 0.42, about 42% of the full-voltage locked-rotor torque. A fan or compressor that loads the motor at rest accelerates slowly on that torque, stretches the dip and can stall, and every contactor coil on the bus must still hold in.

Anything that cuts the locked-rotor kVA cuts both the dip and the set size: sequence the motors with the largest first, or fit soft starters, where the arithmetic of converting a soft start kVA limit to starting current is the same check either way.

The three start cases, sized with each alternator #

Assumptions for the table: 6 kVA per hp locked-rotor (swap in code-letter data when you have it), 0.995 kVA per hp running (from the 0.75 product above), and the 120% and 300% figures as multipliers on rated kVA. Case C adds step 1's running load, 22.5 hp × 0.995 = 22.4 kVA, to the 7.5 hp motor's 45 kVA start.

Start case Peak kVA drawn Self-excited rating needed (÷ 1.2) PMG rating needed (÷ 3.0)
A — all 22.5 hp of step 1 start together 135 kVA 112.5 kVA (about 90 kW) 45 kVA (about 36 kW)
B — the 7.5 hp motor starts alone, nothing else running 45 kVA 37.5 kVA (about 30 kW) 15 kVA (about 12 kW)
C — step 2's 7.5 hp motor starts against a loaded step 1 67.4 kVA 56.2 kVA (about 45 kW) 22.5 kVA (about 18 kW)

Read across and both quotes reappear. A self-excited set with a single-phase peak-reading AVR must survive case A, which takes 112.5 kVA of alternator — precisely the frame a 100 kW (125 kVA) set occupies. With PMG excitation, or with the starts sequenced so case B becomes the worst event, the running kVA governs instead: a 50 kW (62.5 kVA) alternator carries the lineup with margin, while 40 kW (50 kVA) sits marginal against 44.3 kVA of running load. A 2.5-to-1 spread in kW is too large to be a rating-convention mixup alone, though it is worth checking the power factor on each datasheet when one quote is in kW and the other in kVA.

A dip check you can run before trusting either quote #

Treat the start as a constant-impedance load behind the alternator's transient reactance X'd, expressed as a fraction of the alternator's own kVA rating, and solve the voltage divider for 65% voltage remaining at the motor:

S_start,max = 0.538 × S_rated / X'd

Worked example: a 62.5 kVA alternator with X'd = 0.25 — an illustrative value, read the real one from the alternator datasheet — accepts 0.538 × 62.5 ÷ 0.25 = 134.5 kVA of locked-rotor load. The 135 kVA all-together start of case A lands exactly on that edge; the 45 kVA sequenced start passes with room to spare.

Re-run the same set with X'd = 0.30 and the limit falls to 0.538 × 62.5 ÷ 0.30 = 112 kVA: case A now fails while the sequenced case still passes. One datasheet number moves the answer more than any argument between vendors. This screen is an estimate that ignores subtransient reactance, regulator action and the engine's response, so the manufacturer's published motor-starting curve or sizing software supersedes it. The same dip arithmetic follows a motor start onto any source, which is why a 4.16 kV motor start can drag a 120 V branch down to 109 V.

Frequency dip and the engine side #

Voltage dip is the alternator's problem; frequency dip is the engine's. A motor start draws high kVA at low power factor, so the engine sees a modest kW step, and the 6 Hz limit is judged on the engine's transient response and its governor — a lazy governor fails this check on a set whose alternator passes the voltage one. Altitude and ambient heat cut engine output below the sea-level standby rating: at 3000 ft (about 914 m) and 95°F (35°C), read the derate from the engine maker's altitude and temperature curve for that specific engine instead of applying a remembered percentage, and compare the derated kW, not the nameplate figure, against the running load and the start's kW step.

Make both vendors quote against the same sheet #

Take the nameplates with the equipment de-energized: lock out and verify absence of voltage before anyone opens a motor terminal box or the genset panel; NFPA 70E, 2024 edition, covers the verification method, and local requirements go to the authority having jurisdiction.

  • Per motor: horsepower, full-load amperes, locked-rotor amperes or code letter, and its step.
  • The start sequence with the delay between steps, largest motor first.
  • Site limits: 35% maximum voltage dip, 6 Hz maximum frequency dip, 3000 ft, 95°F ambient, standby diesel duty.

Require each quote to state excitation type, regulator type, the alternator's X'd and its published motor-starting capability, governor type, engine kW derated for the site, and predicted voltage and frequency dips for each case from the vendor's sizing software, with a pass or fail against the site limits. Two quotes that state all of that will land within a frame size of each other.

The decision #

Quote the 50 kW (62.5 kVA) set with PMG excitation, a three-phase averaging AVR and a start sequencer that brings the largest motor in first and staggers the rest. Accept the 40 kW (50 kVA) quote only if the alternator's own motor-starting curve shows 35% dip or less for the worst case and the derated engine kW covers the running load — the smaller vendor is selling that curve, so make them produce it. The 100 kW quote becomes necessary only if the motors must start together on a self-excited alternator with a single-phase peak-reading AVR and no PMG or excitation-boost option, because that combination forces sizing on locked-rotor kVA. Sequencing is the cheapest lever: it cuts the peak start from 135 kVA to 45 kVA, a factor of three, and costs timers rather than copper.

Questions asked

Is there an excitation option between self-excited and PMG?

Yes: an excitation boost system, which forces extra field current for the first moments of a start so a self-excited alternator delivers more starting kVA than its plain self-excited rating. It sits between plain shunt excitation and permanent-magnet excitation on both cost and starting performance. Ask the vendor to state the boost capability and the starting kVA it supports, then confirm the whole start case in the sizing software rather than trusting the rule of thumb.

Why are gensets quoted in kW when the alternator is a kVA machine?

The engine is rated in kW and the alternator in kVA, and North American practice pairs the two at a 0.8 power factor, so a 40 kW set has a 50 kVA alternator and a 100 kW set has a 125 kVA alternator. A quote that lists only kW hides the alternator size, which is the machine that must deliver the starting kVA. Read the power factor on each datasheet before comparing quotes.

Would a soft starter or a VFD on these motors change the answer?

It can. A soft starter limits the current while the motor accelerates and a VFD ramps the voltage and frequency up from rest, so the peak kVA the alternator sees falls well below the locked-rotor figure and the smaller set may pass. Check two things before counting on it: the drive's specified input current during the ramp, and its ride-through rating at the dipped bus voltage.

What happens to contactors and controls during the voltage dip?

The bus sits near 65% of rated voltage for a second or two. Contactor coils can drop out once voltage falls below their hold-in level, which would drop a running motor offline even though the alternator recovers. Feeding the coil circuits from a control transformer on its own feeder, or holding critical control circuits on a small DC supply, keeps the lineup from tripping itself during the start.

Keep reading

  • Explainer

    Does the NEC require 125% ampacity for motor conductors

    Yes, NFPA 70 Article 430.22(A) requires conductors supplying a single continuous-duty motor to have an ampacity of not less than 125% of the motor's full-load current from Table 430.250, in the 2005 edition and the 2023 edition alike. Tables 310.16 and 310.17 only list what a conductor may carry; the factor sits in Article 430. Inside a UL 508A listed panel, the internal wiring follows the UL standard.

    Electrical safety and codes

  • Selection guide

    Is a 6 kVA transformer enough for a 5 hp motor drive

    A 6 kVA three-phase transformer supplies 7.5 A per line at 460 V and 15.1 A at 230 V. A 5 hp rating is 3.73 kW of shaft output, not input kVA. Measure the machine's simultaneous input current at its heaviest cut: if it stays under the transformer's nameplate current, the 6 kVA unit is enough; if it crosses, order the next standard size.

    Power distribution and transformers

  • Selection guide

    Sizing a transformer for a 200 HP across-the-line motor start

    Select a 1000 kVA transformer with nameplate impedance of 6.5% or less. The 3 kVA-per-HP rule gives 600 kVA for the 200 HP pump alone; adding 390.9 kVA of always-on load gives 990.9 kVA, so that is the screening size. The dip screen confirms it: 8.8% sag at 5.75% impedance, inside the 10% target, while 750 kVA would need 4.9% impedance to pass.

    Power distribution and transformers