Short answer

Set the Motor FLC dial to the nameplate full-load current, taking the nearest step not below it and never the frame rating. Select Motor Trip Class deliberately: on these starters the built-in thermal model only trips at 105% calculated temperature once a class is set. Set Excess Start Time above the measured start duration and below the motor's permitted start time.

On this page
  1. What the three switches control
  2. The classes on the dial
  3. The settings at a glance
  4. Setting the switches, in order
  5. Worked example
  6. The mistakes that return as trips
  7. If your panel only has three switches
  8. Questions asked

Three rotary switches decide whether a compact soft starter protects the motor or only starts it: Motor FLC, Motor Trip Class and Excess Start Time. Set Motor FLC to the motor's nameplate full-load current, taking the nearest dial step not below it and never the starter's frame current. Select Motor Trip Class deliberately: the built-in thermal model on these starters trips at 105% calculated motor temperature only once a class is set, so an unset class means no overload trip at all. Set Excess Start Time above the measured start duration and below the time the motor can carry locked-rotor current. The sequence below, with a worked example, puts numbers on all three.

What the three switches control #

The front panel of these models carries eight rotary adjustments: Current Ramp, Motor FLC, Current Limit, Stop Ramp Time, Motor Trip Class, Auxiliary Relay Function, Phase Sequence and Excess Start Time. Three of them define the protection; the rest shape the ramp, the stop and the control circuit.

Motor FLC is the reference the electronic thermal model normalizes against. The starter monitors motor current continuously and computes an expected motor temperature from it, which is the documented protection principle for this family. Heating scales with current squared, so the reference has to be right: a Motor FLC set 10% high reads about 21% less heat than the motor actually produces (1.10 × 1.10 = 1.21), and a reference set below the nameplate current trips a healthy motor at normal load.

Motor Trip Class decides how fast that model acts. The manual for these models states the trip fires when the calculated temperature reaches 105% once a class is selected; with no class selected, that statement does not apply. Treat an unset class as a starter contributing no motor overload protection, whatever the upstream breaker size.

Excess Start Time caps the length of one start. It covers the case the thermal model handles too slowly: a load that never reaches speed and holds locked-rotor-scale current through the whole ramp. The timer clears that case in seconds instead of letting the computed temperature wind up toward failure.

The classes on the dial #

Class 10, class 20 and class 30 are the documented choices. IEC 60947-4-2, Edition 3.0 (2011), is the product standard covering semiconductor motor controllers — soft starters — and the class figures follow the IEC 60947-4 overload definitions: from cold, at 7.2 times the set current, class 10 must trip within 10 s, class 20 within 20 s and class 30 within 30 s. Those are the same classes a thermal overload relay carries, and Reading overload relay trip classes and curves reads those curves in detail. Editions and local amendments differ, so confirm the enforced edition with your authority having jurisdiction and against the equipment documentation.

The settings at a glance #

Rotary switch Set it from Worked example below The value that looks right and is wrong
Motor FLC Nameplate full-load current at the connected voltage 40 A step for a 38 A motor The starter's frame current
Motor Trip Class Start duration against the motor's thermal withstand Class 10 Left unset — no trip at all
Excess Start Time Measured start duration, with margin under the start withstand 10 s over a 6.5 s start Any value shorter than the real ramp

Setting the switches, in order #

  1. De-energize, lock out and verify. Open the panel only with the starter locked out and absence of voltage tested on the line terminals; NFPA 70E, 2024 edition, covers the electrical work practices for that test, and your authority having jurisdiction and site procedure settle the details.
  2. Read the motor nameplate. Take the full-load current listed for the voltage you actually connected at the motor; a dual-voltage plate lists one current per winding connection, and only one matches your supply.
  3. Set Motor FLC to the nearest step at or above that nameplate current — up, never down, and never to the frame current.
  4. Set Current Limit and Current Ramp to the lowest start current that still accelerates the load to full speed. If the motor stalls when the ramp reaches that ceiling, the limit-versus-load balance is the fault, and Setting a soft starter current limit without overheating the motor works that trade.
  5. Select Motor Trip Class. Class 10 suits loads that reach speed promptly, most pumps and fans included; step to 20 or 30 only when the start genuinely needs the longer envelope and the motor's thermal data supports it. Setting overload relays for high-inertia motor starts covers the slow-start case.
  6. Set Excess Start Time. A working target is 1.5 times the measured start duration, capped by the motor maker's published hot locked-rotor time; where the data sheet omits that time, get the stall withstand from the motor maker before raising the timer past the measured start.
  7. Set Stop Ramp Time, Auxiliary Relay Function and Phase Sequence to the load and the control scheme: ramp for water hammer or a product shift on stop, relay contact for the duty the control circuit expects, rotation matching the supply.
  8. Re-energize and meter one real start at the heaviest expected load: a true-RMS clamp meter or logging power meter on one line, capturing peak start current, start duration and running current after the bypass closes. Switch positions are claims; the meter trace and the two trip LEDs, read against the manual's indication table, are the evidence.

Worked example #

The motor, the frame, the metered start and the step values below are example inputs — read and measure your own before relying on the results.

  • Motor: three-phase induction motor, nameplate full-load current 38 A at 460 V, 60 Hz
  • Starter: rotary-switch model, frame current 100 A
  • Metered start at the heaviest expected load: 210 A peak for 6.5 s
  • Motor maker's published hot locked-rotor time: 20 s
  • Dial steps near the nameplate value: 36 A and 40 A; timer steps near the start: 8 s and 10 s

Arithmetic:

  • Start multiple: 210 A ÷ 38 A = 5.5 times nameplate current.
  • Class envelope: 7.2 × 38 A = 273.6 A, where class 10 must trip by 10 s from cold. A start at 5.5 times nameplate that finishes in 6.5 s sits inside the envelope, so class 10 rides every real start and still clears a genuinely stalled one.
  • Motor FLC: the nameplate current falls between the 36 A and 40 A steps; the nearest step not below it is 40 A. Check the bias: (40 ÷ 38)² = 1.108, so the model reads about 10% less heat at full load — a late bias, acceptable, and worth a line on the panel schedule.
  • The frame trap, quantified: with the dial parked at the 100 A frame, (38 ÷ 100)² = 0.144, so the model would read roughly 14% of the true heating, about a seventh; its trip threshold would sit far beyond the motor's thermal limits, and the motor would cook first.
  • Excess Start Time: the 10 s step is 1.54 times the measured start (10 − 6.5 = 3.5 s of margin, 54%) and still half the 20 s hot time. The 8 s step would clear the start too, but 1.5 s of margin is thin against a heavy or cold load.

Decision for this case: Motor FLC 40 A, Motor Trip Class 10, Excess Start Time 10 s — then confirmed by a metered start, not by the dial faces.

The mistakes that return as trips #

  • Motor FLC parked at the frame current: the worked example shows the model reading about a seventh of the real heat, so the overload never trips while the motor runs past its limits.
  • Trip class left unset: the documented 105% trip behavior is conditional on a class being set, so the starter contributes no overload protection at all.
  • Excess Start Time shorter than the real ramp: the starter trips at the same point of every start, which reads like a machine fault and is a setting.
  • Two protection curves fighting: an external overload relay added alongside a configured thermal model trips on its own curve at its own point; run one scheme, not two.
  • Duty increased after commissioning: more starts per hour pile ramp heat into the model and the starter's own heatsink faster than the commissioning test explored.

If your panel only has three switches #

Some compact models in the same families expose only Initial start voltage, Start ramp time and Soft stop ramp time. Nothing on that panel sets overload: fit a separate overload relay and set it from the nameplate with the same round-up rule, following Setting overload relays from motor nameplate full-load current. On the eight-switch models, the manual states an external motor protection device is not required once the thermal model is configured — adding a second relay with a different curve then creates two trip points and muddies every later diagnosis. One protection scheme, set once, verified once with the meter.

Questions asked

The motor nameplate lists two full-load currents — which one goes on the dial?

Use the current listed for the voltage actually connected at the motor terminals. For example, a plate reading 41 A at 460 V and 82 A at 230 V means 41 A on a motor wired for 460 V. Take the nearest dial step at or above that figure, and recheck the step if the motor is ever rewired for the other voltage.

Does a hot panel move the trip point?

Yes. Electronic overload curves carry an ambient reference and manufacturers publish a derate above it: one soft starter manual derates its class 10 curve by 2% for each degree Celsius above 40 °C, which is about 20% at 50 °C. Measure the panel temperature at running load and check the derate table for your model before assuming a cold-room curve holds inside a hot switchboard.

A heat trip cleared after the motor sat overnight — is the fault gone?

No. The thermal model cools along with the motor, so a trip that clears after rest is accumulated heat: too many starts per hour, a trip class too slow for the start, or a genuine running overload. A trip landing at the same point of every start is different — that pattern points to Excess Start Time set under the real ramp duration, a setting, not a fault.

Does the built-in thermal model replace the upstream breaker or fuses?

No. The model is overload protection only. Short-circuit and ground-fault interruption still comes from the breaker or fuses ahead of the starter, and their interrupting rating at the available fault current, together with coordination with the starter, is a separate check from anything these rotary switches set.

Keep reading

  • Troubleshooting

    Diagnosing a soft starter fault or alarm before resetting it

    Record the exact fault or alarm text, the values shown with it, and whether it appeared during start, run, or stop, before you reset, because a reset clears the diagnostic context. Then check the supply, the starter's documented ratings, the configured motor data, and the load: most trips trace to one of those four, not to a failed starter.

    Motors and motor starters

  • Selection guide

    Overload relay range selection for an 18.5 kW motor

    Select the relay by the motor's nameplate full-load current, not by kilowatts: pick the adjustable range that brackets that current away from both dial ends, then set the trip class from the measured acceleration time — class 10 for starts under 10 seconds, class 20 up to about 20. An 18.5 kW motor on a 400 V supply works out near 35 A; verify against the nameplate before you buy.

    Motors and motor starters

  • How-to

    Setting a soft starter current limit without overheating the motor

    Set the soft starter current limit from the accelerating torque the load needs, not from the starter's duty figure. Estimate the limit as locked-rotor current times the square root of required torque over locked-rotor torque, check that current, dwell time and starts per hour against the starter's duty table, then verify every start with a measured peak current and acceleration time. At a 300% limit a typical design B motor develops only about a third of its full-load torque.

    Motors and motor starters