Short answer

The 3,500 kW recycle-air compressor's 1,737 A start is about 19.9 MVA, which dips a 7% transformer's secondary roughly 9.3% at 15 MVA, 8.2% at 17 MVA and 7.0% at 20 MVA. With the two running air compressors and the IEC 60076 impedance tolerance counted, only the 20 MVA rating stays inside a 10% ceiling, so that is the unit to specify.

On this page
  1. How much MVA does the recycle-air compressor pull at start?
  2. What voltage dip does a 7% transformer give at each rating?
  3. What voltage dip should you allow during a start?
  4. How much does the impedance tolerance change the dip?
  5. Do the motors already running make the dip worse?
  6. Does forced cooling reduce the voltage dip?
  7. Does the 22 kV source strength change the choice?
  8. Which transformer rating do you specify?
  9. Questions asked

A cryogenic plant with six 6.6 kV motors — two 2,056 kW air compressors, one 3,500 kW recycle-air compressor and three 800 kW oxygen compressors, started in sequence — has to size its 22/6.6 kV transformer on the worst start, not the running load. Three ratings are on offer, 15, 17 and 20 MVA, all with 7% impedance. Specify the 20 MVA unit: its secondary-bus dip screens at 7.0% with the recycle-air compressor starting alone and 8.8% with both air compressors already on line, and it stays inside the 10% ceiling adopted here even with the IEC 60076 impedance tolerance applied, while each smaller rating crosses that ceiling once the same effects are counted. Forced cooling would add thermal MVA to any of the three without moving a single dip figure. The screen below shows the arithmetic and ends with the decision for each option.

How much MVA does the recycle-air compressor pull at start? #

At its stated 1,737 A starting current, the 3,500 kW recycle-air compressor draws about 19.9 MVA while it accelerates, and that figure — not the kilowatt rating — is what sizes the transformer.

The machine is reactor-started, and the current is quoted at the reactor's 80% tap. Treat it as three-phase line current in RMS amps at the motor voltage; if the motor vendor's start sheet defines it differently, every dip below rescales by the same ratio. The stated 0.9 efficiency and 0.9 power factor travel with that current, and the same pair serves below as the example assumption for running load.

Worked example, three-phase apparent power:

S = √3 × V × I = 1.732 × 6.6 kV × 1.737 kA = 19.86, so about 19.9 MVA

Kilovolts times kiloamps give MVA directly, so no extra factor appears. This is the demand for the seconds of acceleration, a transient screening value rather than a continuous loading; the running current is a fraction of it. A fixed-current screen like this is the standard first pass, and fixed-current versus motor-impedance motor starting dip covers where it departs from the full model.

What voltage dip does a 7% transformer give at each rating? #

With the transformer as the only impedance in the circuit, the dip fraction is its impedance times the start MVA over its own rating, which puts the bare screen at 9.3, 8.2 and 7.0% for the three options in ascending size.

The formula, with the impedance written as a fraction on the transformer's own base:

ΔV ≈ Z × S_start ÷ S_rated

Worked example: 0.07 × 19.9 MVA ÷ 15 MVA = 0.093, so 9.3% on the smallest unit; the same product over the largest rating gives 0.070, so 7.0%, with the middle option at 8.2% between them.

The bare screen deliberately leaves out the utility source, the cables on both sides, the transformer's resistance and impedance angle, and the load already running; the sections below add the two effects that change the decision. It is the same screen that answers whether a 15 MVA transformer can start a 5000 HP motor DOL — only the scale changes. Every figure in this article is a screening estimate; the detailed study, the equipment data sheets and the plant's design basis set the final values.

What voltage dip should you allow during a start? #

Adopt a 10% ceiling at the transformer secondary during acceleration: the top of the 5 to 10% band the plant's previous project held on the same transformer arrangement, and a firm number to write into the study basis now.

The band is project precedent rather than a code limit, and it is the right precedent here because the arrangement repeats. Two floors sit beneath it. The starting motor must still accelerate its load, so its terminal voltage — one cable drop below the secondary bus — has to stay above the manufacturer's minimum for starting a loaded compressor; what decides acceptable voltage drop for MV motor starts treats that question in depth. And the loads sharing the bus, contactor-held branches and any drives, carry their own drop-out and ride-through thresholds. The screen here bounds the secondary bus; the terminal check is separate and needs the feeder data.

How much does the impedance tolerance change the dip? #

IEC 60076, the international power-transformer standard, lets the delivered impedance sit ±10% off the guaranteed value, so a nominal 7% unit can arrive at 7.7%, and the smallest rating's bare screen becomes 10.2%.

Worked example: at the tolerant end, 0.07 × 1.10 = 0.077, and the screen becomes 0.077 × 19.9 over rating — 10.2% at the smallest, 9.0% at the middle, 7.7% at the largest.

The guarantee is stated at a 75 °C reference temperature under the same standard, so write the guaranteed impedance, its tolerance and that reference temperature into the purchase specification, and screen with the tolerant side — a transformer delivered at that end is still a compliant transformer.

Do the motors already running make the dip worse? #

Yes — the recycle-air compressor starts third in the sequence, with both 2,056 kW air compressors already on line, and their roughly 5.1 MVA of running load takes the middle rating's screen to 10.3%, past the ceiling.

The sequence is AC 01, AC 02, the recycle machine, then the three oxygen compressors, so the largest motor starts into the largest running load of the sequence. Worked example: each running compressor draws its shaft power divided by efficiency times power factor in apparent power, so the pair is 4,112 kW ÷ 0.81 = 5,077 kVA, about 5.1 MVA. Added to the start, 25.0 MVA flows through the transformer, and the loaded screen is 0.07 × 25.0 over the three ratings: 11.7% at the smallest, 10.3% at the middle, 8.8% at the largest.

Adding running load and start MVA arithmetically ignores their different phase angles, so the loaded screen errs high — acceptable for a screen, since the detailed study does the vector sum; calculating voltage drop when starting a second motor shows the small-system version of the same arithmetic. The sequence itself has to be enforced in logic: block each start until the previous motor has reached full speed, because two overlapping acceleration currents add their MVA and push the combined case past every option's margin.

Does forced cooling reduce the voltage dip? #

No — fans and oil pumps raise the MVA a transformer can carry thermally, but the dip follows the winding impedance in ohms, and cooling leaves those ohms exactly where they were.

This is the trap in comparing nameplate MVA across cooling classes. Forced air genuinely buys overload capacity — a forced air cooling overload capacity analysis on a 7.5 MVA transformer shows how much — but the start dip is set by impedance, and the impedance does not shrink because a fan switched on. When a unit carries two ratings, natural and forced, ask which base the quoted impedance sits on and ask for it in ohms as well; the conversion between bases is worked in the FAQ below. None of the three options needs forced cooling for the running load: natural cooling carries it with room to spare, because the start, not the load, decided the rating.

Does the 22 kV source strength change the choice? #

No — the utility's 25 kA short-circuit ceiling at the outlet of its 110/22 kV transformer makes the source about 950 MVA, and that term is common to all three options, so it shifts every dip alike and the ranking stands.

Worked example: source strength is √3 × 22 kV × 25 kA = 952 MVA. On the largest rating's base that is 20 ÷ 952 ≈ 2.1% of impedance, roughly a third of the transformer's own contribution — the source is strong, and the transformer still dominates the dip.

Two cautions with teeth. A ceiling is not a floor: the 25 kA figure is the most the utility promises at that outlet, good for switchgear rating, while the dip study must run on the minimum fault level, the weakest configuration with one incoming line out, so get that number in writing at the defined connection bus. And the motor feeders add their own drop between the secondary bus and each terminal, so collect lengths and conductor data for the study. The full method, source to motor, is in motor starting voltage drop with utility short-circuit capacity.

Which transformer rating do you specify? #

Specify the largest rating: it screens at 8.8% in the worst loaded case and 9.6% with the impedance tolerance stacked on top, the only option inside the ceiling in every column of the table.

All three options carry the same guaranteed impedance; each column adds one effect.

Rating Recycle start alone With both air compressors running Same case at the impedance tolerance Decision
15 MVA 9.3% 11.7% 12.8% Reject
17 MVA 8.2% 10.3% 11.3% Reject
20 MVA 7.0% 8.8% 9.6% Specify

The smallest rating is rejected: it needs the impedance to land on the good side of tolerance with nothing else on the bus, and its worst column reads 12.8%. The middle rating is rejected: its bare margin disappears the moment both air compressors are running. The largest is specified, on natural cooling, with the guaranteed impedance, its tolerance and the 75 °C reference written into the purchase specification.

Three actions close the phase. Put the ceiling, the sequence and the start-blocking permissive into the study basis and the control description. Get the utility's minimum fault level in writing. Confirm the stated start current as line RMS at the tap the plant will actually use, with the voltage it applies to. The one hands-on check among these — reading or changing the reactor tap — is done under your site's electrical-safe work condition, isolated, locked out and tested for absence of voltage, the practice NFPA 70E, 2024 edition, the US standard for electrical safety in the workplace, covers; confirm the site procedure with the authority having jurisdiction and the starter's documentation.

Questions asked

Is the chosen rating oversized for the running load?

No. The six motors sum to 10,012 kW of shaft power, and at the same 0.9 efficiency and 0.9 power factor used in the screen, that is about 12.4 MVA through the transformer with everything running, roughly 62% of the chosen rating. Natural cooling carries that with margin, and it is why the running load never decided this choice: the start did.

What must you confirm about the 1,737 A starting current?

That it is three-phase line current in RMS amps at the motor voltage, with the reactor on the tap the plant will actually use. The screen is linear in it: a current ten percent higher moves every dip figure up by ten percent, so an unconfirmed current is an unconfirmed margin. Get the number from the motor manufacturer's start calculation, with its tap and voltage written beside it.

Do the oxygen compressor starts need their own screen?

Check them, but the recycle start still bounds the sequence. The oxygen units start last and direct on line, so the final start sees about 11.4 MVA already running, from 9,212 kW at the same efficiency and power factor. An 800 kW direct-on-line induction motor pulls roughly five to eight times full-load current, a few MVA at that voltage, far under the 13.6 MVA of headroom left below the recycle case. Take each start current from its motor data sheet.

What if the detailed study still shows too much dip?

Fix the start before the transformer. Replace the utility's short-circuit ceiling with its guaranteed minimum fault level first, because a weaker source raises every option alike. Then cut the starting current, by a deeper reactor tap if the starter offers one: the dip shrinks by the same fraction as the current. More MVA comes last, since the transformer's share of the dip falls only in proportion to the added rating.

How do you convert impedance between cooling-class bases?

Multiply by the ratio of the ratings: impedance on the new base equals impedance on the old base times the new rating over the old. A 7% impedance guaranteed on a 17 MVA natural-cooled base is 8.2% on the same unit's 20 MVA forced-cooled base, since 7 times 20 divided by 17 gives 8.2. The ohms never changed, which is why fans never ease the dip.

Keep reading

  • Selection guide

    Sizing a transformer for a 200 HP across-the-line motor start

    Select a 1000 kVA transformer with nameplate impedance of 6.5% or less. The 3 kVA-per-HP rule gives 600 kVA for the 200 HP pump alone; adding 390.9 kVA of always-on load gives 990.9 kVA, so that is the screening size. The dip screen confirms it: 8.8% sag at 5.75% impedance, inside the 10% target, while 750 kVA would need 4.9% impedance to pass.

    Power distribution and transformers

  • Explainer

    Why series transformers don't add kVA or fix motor starting voltage

    Transformers in series do not add kVA: the pair delivers the smaller rating, 500 kVA, and each unit drops voltage by its per-unit impedance times its per-unit current. The customer's 5% step-up carrying 3 to 4 per-unit starting current eats an estimated 15-20% before the motor, so the utility transformer is probably the right size and the fix belongs to the starting method or a direct 2400 V service.

    Power distribution and transformers

  • Explainer

    Converting a 350 kVA soft start limit to starting current

    A 350 kVA soft start limit is about 421 A of line current at 480 V: divide 350,000 VA by √3 × 480 V. The figure is apparent power, so no power factor enters the conversion, and it carries no duration — that comes from the torque-speed margin. The 12.5 kV fuse is a coordination problem; motor protection belongs at 480 V.

    Motors and motor starters