Troubleshooting
Why a drive shows a missing phase fault on single-phase supply
Short answer
No parameter converts this controller to single-phase drive power: the single-phase rating feeds the control supply only, and the drive rectifier needs three phases, so the missing-phase fault appears the moment motion is commanded. Feed the drive input real three phase from a rotary converter sized to its input rating, set the transformer tap to the converter's output, and verify with commanded motion.

On this page
There is no setting. On a controller nameplate that lists both a three-phase input and a single-phase input, the two lines feed two different circuits: the three-phase rating powers the drive rectifier behind the servo axes, the single-phase rating powers only the control supply. A clean power-up on single phase proves the control board, the display and the fans — nothing about the drives. When motion is commanded, the drive-input supervision finds one phase where three belong and reports it, which is the controller describing its supply accurately. The fix is real three phase: a rotary phase converter sized to the drive input, feeding the controller's input transformer at the tap that matches the converter's output, proven by commanded motion.
Two ratings, two circuits #
Read the nameplate lines as two separate connections. The three-phase line ends at the drive rectifier, a six-pulse bridge that charges the DC bus the servo power modules draw from. The single-phase line ends at the control supply: logic, the safety circuit, I/O, the operator interface. They share a cabinet, not a power path, so power-up on single phase is expected and means nothing about drive capability.
The controller supervises its drive input by comparing the three input phase voltages and by watching DC-bus ripple. With one phase present at a three-phase terminal, either detector produces the missing-phase message. For a unit whose manual documents a three-phase drive input only, no parameter disables that supervision or re-rates the rectifier. Where a maker does support single-phase drive input, it appears in the manual as a wiring variant with a derated input current — the contrast is worked through in sizing a VFD for a three-phase motor on single-phase input.
Why the trip waits for a motion command #
At power-up the rectifier is unloaded: the bus capacitor sits near peak, draws almost nothing, and the supervision — armed when the drives enable — has nothing to act on. The motion command enables the drives, current flows, and a detector fires: the phase comparison registers the absent inputs, or the ripple monitor sees the collapse a single-phase-fed bus makes between peaks. A phase-loss fault that appears at enable rather than at power-up is the classic signature of a drive fed from the wrong supply, and it is why re-checking terminals with everything de-energized finds nothing.
A three-phase rectifier missing a phase does not deliver two-thirds politely — the surviving input conductors carry the whole load and overload, the failure walk-through in why a three-phase rectifier overloads after losing one phase.
The fault in numbers #
Hypothetical controller, real arithmetic. Inputs: drive input rated 3 x 400 V, 50 Hz, 16 A per phase; control input 1 x 230 V.
Fed as designed, the six-pulse bus sits at V_DC = 1.35 x 400 V = 540 V, with ripple at 6 x 50 Hz = 300 Hz — close to flat. Now suppose the drive input were jumpered to the 230 V single-phase line (do not do this; follow the arithmetic): a single-phase bridge peaks at 1.414 x 230 V = 325 V and averages 0.90 x 230 V = 207 V, rippling at 2 x 50 Hz = 100 Hz. The drive wants 540 V and sees at most 325 V at the crests, sagging under load. That is not a parameter problem; the energy path is absent.
For a 230 V-class drive input the numbers change shape, not the verdict: the three-phase average would be 1.35 x 230 V = 310 V, close to the single-phase crest, but the bus capacitor must then carry the entire load between crests at 100 Hz. That ripple duty is why makers derate the drives they do document for single-phase input, and this controller publishes no such rating.
Converter sizing, same example. Drive-input apparent power S = 1.732 x 400 V x 16 A = 11.1 kVA. Converter guidance sizes the rotary idler at 1.5x the largest load and adds margin for heavy start-up duty: 1.5 x 11.1 kVA = 16.6 kVA, so pick the next standard size above 16.6 kVA.
The fix: real three phase #
Three devices make a third leg; one suits this load:
- A static phase converter builds the third leg only for motor starting, then drops it. Rectifier loads are outside what it is built to do.
- A VFD used as a supply outputs a pulse-width-modulated waveform for one motor, with voltage and frequency tied to a speed command — feeding a machine's rectifier front-ends from it fails for the reasons in why a VFD cannot power a whole machine as a phase converter.
- A rotary phase converter runs an idler motor on single phase and makes a continuous third leg. This is the route, and its generated-leg quality depends on the capacitor arrangement explained in why a rotary phase converter needs three capacitor banks.
The transformer already in the cabinet handles voltage only. Taps change ratio; nothing inside a transformer changes phase count, so the transformer is the second half of the fix, never the whole of it.
Wire it and set the tap #
- De-energize and lock out the controller and the converter feeder, then test for absence of voltage before opening either enclosure. The converter output is its own live three-phase source whenever the idler runs: stop it and verify there too.
- Pull the controller manual's three-phase connection diagram and the transformer tap table; the whole conversion is done to that diagram, with the transformer option in circuit.
- Set the transformer tap for the converter's output voltage — the measured value, not the utility voltage the controller was first wired to. The secondary then delivers the rated drive voltage.
- Land the converter's three-phase output on the controller input, check torque and phase order against the diagram, close up, and energize.
- Boot the control side, then go straight to the motion test. Power-up proves nothing; that is the lesson of the original fault.
Prove it with commanded motion #
- Read the fault history first: the missing-phase entry should be stamped at the enable or motion command, not at power-up. That confirms the diagnosis before anything is changed.
- Run every axis through its full speed and acceleration range, including the worst simultaneous move the cell makes. A converter sized by the 1.5x rule holds the bus through it.
- Read the three line-to-line voltages at the controller input under that load and keep the spread within the balance the converter documentation specifies. That is an energized measurement: NFPA 70E, 2024 edition, covers the risk assessment and protective equipment for it, so it goes through your site's process.
- Confirm the DC bus sits near the manual's nominal, about 1.35 x the line-to-line input.
- If the fault returns under load, suspect an undersized converter or an unbalanced generated leg — not the controller, which was reporting correctly all along.
The decision by case #
- This controller, three-phase drive input documented only: stop hunting for a parameter. Rotary converter at 1.5x the drive-input kVA, feeding the input transformer with its tap set to the converter output, verified by commanded motion.
- A drive whose manual documents single-phase input: wire that exact variant and honor its derated current — the printed variant, not ambition, is what makes it legitimate.
- Utility three phase reachable: run the feeder and skip conversion altogether.
- Conversion and feeder both impractical: replace the controller with a variant its maker documents for single-phase drive power.
NFPA 70, the National Electrical Code, 2023 edition, requires in 110.3(B) that listed equipment be installed and used in accordance with its listing and instructions — the manual's three-phase diagram is that instruction. Confirm the final arrangement with your authority having jurisdiction and the equipment documentation.
Questions asked
Can a VFD make the third leg instead of a rotary converter?
Not into the controller's input. A drive output is a pulse-width-modulated waveform sized for one motor, with voltage and frequency following a speed command; a rectifier front-end draws current at the waveform crests, so the pair trips on overcurrent or phase supervision. A VFD does have a documented role in phase conversion, spinning a rotary converter's idler, but that is a different circuit from feeding the controller directly.
Can a static phase converter run the controller?
No. A static converter makes the third leg only long enough to start a motor, after which the load runs on single phase at reduced torque; the manufactured leg disappears exactly when a rectifier needs it continuously. Controllers and other rectifier loads are outside what static converters are built to do. The continuous third leg of a rotary converter is what this load takes.
How do I choose the transformer tap?
Match the converter's measured output, not the voltage the controller was first wired to. A converter fed from 240 V single phase makes roughly 240 V three phase, so the primary tap goes to the value nearest that, and the secondary then delivers the rated drive voltage. Measure all three line-to-line outputs before picking, since the generated leg can sit lower than the pass-through legs.
Is it harmful to buy a rotary converter larger than the rule?
No. Converter guidance accepts any rating above the load and asks for extra headroom on hard starts, so the 1.5x figure is a floor for the largest load, not a target. The controller draws only what its axes demand. Because a rectifier pulls peaked current rather than a motor's smooth sine, take the next size up whenever the arithmetic lands near a rating boundary.