Short answer

An IEC soft starter mounts in the same conventional switchboard or MCC as a DOL starter — no special board exists. The cubicle is what grows: plan roughly double the DOL bucket volume and never less than the DOL bucket, because the thyristors dissipate heat a contactor does not. The frame datasheet's heat loss, clearances and derating replace the ballpark before you order the enclosure.

On this page
  1. Same switchboard, bigger cubicle
  2. The heat a contactor never makes
  3. What sets the exact cubicle size
  4. The 100 HP case: doubling a 12 x 8 x 6 in DOL cubicle
  5. Replacing the ballpark with the datasheet
  6. Proving the cubicle holds temperature
  7. The compact-frame trap
  8. The decision, case by case
  9. Questions asked

You can mount an IEC soft starter in the same conventional switchboard or MCC that holds your DOL starters — there is no special soft starter board to buy. What has to grow is the space around it: plan roughly double the DOL cubicle volume, and never accept a cubicle smaller than the DOL one, because the thyristors dissipate heat that a contactor's closed contacts barely make. This article walks through where that heat comes from, the six factors that set the exact size, a worked layout example, and the test that proves the finished cubicle holds temperature.

Same switchboard, bigger cubicle #

Soft starters and drives are routinely built into conventional low-voltage MCC sections next to DOL starters, and the manufacturers' MCC design guides cover exactly this application, for systems up to 600 V at 50 or 60 Hz with available fault currents up to 100 kA rms. An IEC soft starter is no exception: it bolts to a mounting plate or drops into a bucket and wires to the same bus as any starter.

Two things change when you swap a DOL starter for a soft starter. The frame plus its heatsink occupies more height and depth than the contactor-and-overload stack it replaces, and it needs published clearance around the heatsink for air to move. And if the panel is built to UL 508A as an industrial control panel, the soft starter and its protective devices have to keep the panel's marked short-circuit current rating intact, so verify the protective device combination against the manufacturer's published ratings. The duty and temperature-rise limits behind the frame ratings come from IEC 60947-4-2, the product standard for semiconductor motor controllers; requirements differ by country and edition, so confirm them with your authority having jurisdiction and the equipment documentation.

The heat a contactor never makes #

A DOL contactor carries motor current across closed contacts with a drop measured in millivolts, so its losses are close to nothing. A soft starter regulates motor voltage with pairs of thyristors, and the conduction drop across those thyristors, multiplied by motor current and conduction time, is heat dumped into the heatsink.

The loss is largest during the ramp and scales with motor current and acceleration time. At full speed with an integrated bypass contact system, the bypass contacts close and take the thyristors out of the circuit; makers build bypass in precisely because it cuts the starter's heat loss during operation. Without a bypass contactor, the thyristors keep carrying full-load current for as long as the motor runs, and the manufacturer handbooks state plainly that the heatsink removes heat generated both during the start and during continuous running. That steady loss is why a soft starter cubicle cannot be a copy of the DOL bucket with the same dimensions.

If the bypass contactor is external instead of built in, it adds its own volume and terminal wiring in the same section, and it brings its own switchover behavior — the failure modes are covered in why a soft starter trips equipment error with an external bypass.

What sets the exact cubicle size #

The double-the-volume ballpark buys you a first layout. Six factors decide the final dimensions:

  • Frame heat loss. The manufacturer publishes dissipation for the frame at rated current and duty, usually as a calculation from motor full-load current; run that calculation with your motor's numbers.
  • Mounting clearances. Mount the frame without the published free space around the heatsink and the rated current drops; the clearances are part of the rating.
  • Ventilation strategy. Decide up front whether the board can accept ventilation apertures and whether cooling is natural draught or forced. A fan added without a designed intake, exhaust path and filter only stirs hot air inside the box. A sealed board with no apertures needs a bigger surface, more volume, or a cooling unit.
  • Ambient and altitude. Frames are typically rated around 40 °C ambient, with a current or duty derating above that and a separate derating above about 1000 m of altitude.
  • Duty. Acceleration time and starts per hour set how much heat each start deposits and how much cooling time the frame gets between starts. High-inertia fans are the classic duty that eats these ratings, as covered in specifying soft starters for high-inertia blowers without curves.
  • Frame and bypass arrangement. Match the frame's current range to the motor and its power structure, as in matching a soft starter current range to its power structure, and add the volume of an external bypass contactor if you use one.

None of the six comes from the old DOL bucket. All six come from the frame datasheet; the ballpark only sets the shape of the first layout.

The 100 HP case: doubling a 12 x 8 x 6 in DOL cubicle #

Inputs. The DOL starter for a 100 HP motor in this example is 12 in high x 8 in wide x 6 in deep — the illustrative dimensions from the layout question behind this article, not a catalogue template. The factor is x2 on volume, the practitioner's first-pass rule, valid while the ventilation strategy stays the same.

Rule. Bucket volume is height x width x depth. A first-pass soft starter bucket targets twice the DOL volume and is never smaller than the DOL bucket.

Arithmetic.

DOL volume: 12 x 8 = 96 sq in, and 96 x 6 = 576 cu in. Target: 576 x 2 = 1,152 cu in. Candidate that keeps the 8 in width so it still fits the same MCC section: 24 x 8 = 192 sq in, and 192 x 6 = 1,152 cu in — exactly on target.

Result. A bucket 24 in high x 8 in wide x 6 in deep gives 1,152 cu in, twice the DOL volume on the same footprint.

Decision. Lay this starter out at 1,152 cu in or more and reject any layout below 576 cu in. If the chosen frame is deeper than 6 in, the arithmetic changes and the rule does not — same target volume, different shape. If the board cannot take ventilation apertures, expect to exceed the x2 figure or move to forced draught. Before steel is ordered, replace the ballpark with the chosen frame's published heat loss, mounting clearances and derating figures; the datasheet outranks the rule of thumb every time.

Replacing the ballpark with the datasheet #

For the frame you are actually buying, record five figures before the layout is final: overall dimensions, heat dissipation at rated current and duty, minimum mounting clearances, rated ambient, and the derating curves above that ambient. Manufacturer application guides express the heat loss as a formula in motor full-load current and duty; run the formula with your motor's full-load current, your ramp time and your starts-per-hour count, then size the apertures, the fan or the cooling unit to remove the result. If the catalogue publishes no dissipation or clearance figures for the frame, stop there and get the maker's technical guidance, sending the motor data, acceleration time and starts per hour. That exchange is cheap; a bucket that cooks its starter takes the line down.

Proving the cubicle holds temperature #

  • Run the heaviest expected load at the maximum planned starts per hour and let temperatures settle.
  • Log the cubicle air temperature at steady state and compare it with the frame's rated ambient; a steady climb across consecutive starts means the ventilation is undersized.
  • Confirm the bypass contactor pulls in at the end of the ramp and the heatsink cools afterwards; a heatsink that stays hot in running means the bypass contacts are not carrying and the thyristors still are.
  • Before you open the cubicle to trace the airflow path or check filters, de-energize the section and verify absence of voltage, which is the first requirement NFPA 70E (2024 edition) sets for electrical work; confirm the details with your authority having jurisdiction and your plant's safety program.
  • On a forced-draught board, check fan rotation and direction, the intake-to-exhaust path and the filter condition while the section is open.
  • Repeat the consecutive-start run after any fan or filter change and confirm there is no overtemperature trip.

The compact-frame trap #

A soft starter barely bigger than the DOL contactor it replaces is telling you its rating assumption: an easy-to-start load and a modest start count. That can be exactly right for a pump that starts twice a shift. It fails on a heavy fan or a conveyor that starts often, where heat per start is high and cooling time between starts is short. The frame will usually protect itself, because soft starters monitor their own heatsink temperature and trip on overtemperature rather than cook silently, but an overtemperature trip mid-shift is the very failure the soft starter was bought to prevent.

Frame margins cut both ways. The mirror problem, an oversized soft starter on a smaller motor, trips for different reasons and is covered in why an oversized soft starter may not suit a smaller motor. Undersizing power electronics for the load fails just as predictably across drive families — the canonical case is running a larger motor on a smaller drive. Read the frame's duty rating against your load, never its footprint against the old contactor.

The decision, case by case #

  • Same-board question: yes — the conventional switchboard or MCC takes the IEC soft starter; buy the starter for its frame ratings and protection coordination, not for a special board.
  • Size question: lay the bucket out at twice the DOL volume, never below the DOL bucket, then let the frame datasheet's heat loss, clearances and derating set the final number before steel is ordered.
  • Compact-frame question: acceptable only when the load starts easily and the starts-per-hour count fits the frame's duty rating; otherwise step up a frame and take the volume with it.

Questions asked

Does an IEC soft starter need a special switchboard or MCC?

No. Manufacturers build soft starters and drives into conventional low-voltage MCC sections alongside DOL starters, on systems up to 600 V at 50 or 60 Hz with available fault currents up to 100 kA rms. The board's bus, bracing and structure stay as they are; the change is the bucket or cubicle volume around the starter, sized so the heat has a path out.

Why does the cubicle still heat up if the starter has a bypass contactor?

The bypass contacts carry the current after the ramp, so running losses drop to near-contactor levels, but the thyristors still dissipate heavily through every start, and heat per start rises with motor current and acceleration time. An external bypass contactor adds its own volume in the section and needs its own protection coordination, so its space goes into the layout too.

What derating applies when the electrical room runs hot?

If your MCC room exceeds the rated ambient in summer, apply the current derating to the frame selection and re-run the heat calculation instead of trusting the nameplate current.

The soft starter is barely bigger than the DOL contactor — can I keep the same bucket?

Only for an easy-to-start load with a low starts-per-hour count. Check the frame's rated current and its duty rating, meaning the permitted starts per hour at your acceleration time, before you accept the compact size. The starter monitors its own heatsink temperature and trips rather than cooking silently, but a mid-shift overtemperature trip is the failure the soft starter was meant to prevent.

Keep reading

  • Troubleshooting

    Fixing a soft starter phase loss fault after a voltage change

    Set the soft starter's mains voltage parameter to 400 V and its motor rated current to the pump's 400 V nameplate value. The phase-loss monitor compares each phase with the programmed reference; at 400 V on a 690 V setting every phase reads about 42% low, past the documented 15% drop threshold, so the starter trips loss of phase even with all phases present.

    Motors and motor starters

  • Explainer

    Motor starter vs contactor: using a starter as one

    A motor starter is a contactor with an overload relay added: the relay's normally closed contact opens the coil circuit on sustained overcurrent. A starter works wherever a contactor is called for, provided three checks pass — horsepower rating at the supply voltage, coil voltage, and the overload setting against the motor's nameplate full-load current. A NEMA Size 1 covers a 3 HP motor.

    Motors and motor starters

  • Troubleshooting

    Troubleshooting a line side fault on a soft starter

    A line side fault reports the three-phase supply arriving at the starter's line terminals: missing, unbalanced, or outside nameplate range. Measure all three line-to-line pairs at the terminals at rest and during the start before touching the starter — most of these faults are a lost phase, blown fuse, loose termination, or start-time voltage drop upstream.

    Motors and motor starters